|
| Sl. No. |
Service |
Type & Rs. per
TEU
|
Remarks |
|
| 1. |
Unhooking container on quay,
transportation from hook point to container yard by
party's vehicle, life-off thereat by party's equipment
& life-on for delivery to warehouse/CFS outside the
Docks or viceversa. |
| a) |
Import Load
containerwith hazardous-l Cargo. |
6000/- |
| b) |
Import Category Load |
4500/- |
| c) |
Import Category-II Load |
5000/- |
| d) |
Export category-I Load |
2800/- |
| e) |
Export category-II Load. |
3500/- |
| f) |
Export category-III Load. |
5000/- |
| g) |
Empty |
500/- |
|
| i) |
Rates include wharfage on
container as also on cargo and
is also applicable in case of direct transfer/delivery/shipment.
No separate charge is leviable for deployment of
fire personnel in case of container landed with
Hazardous-I cargo. |
| ii) |
Import Category-I&II shall
mean containers loaded with cargo as mentioned in
items (II)&(III) under remarks column of SL.No.1
of Section 9.1. |
| iii) |
Export categories I,II, &
III shall mean containers loaded with cargo as
mentioned in items (IV),(V)&(VI) under
remarks column of SL.No.1 of Section 9.1. |
| iv) |
'Import' includes landing of
coastal cargo. |
|
|
| 2. |
Destuffing/ stuffing at port
shed/ yard. |
| a) |
Done by Port |
3000/- |
| b) |
Other than by Port. |
1000/- |
|
| a) |
Includes services of equipment,
clerkage, port & CDLB workers when done by
Port. |
| b) |
Includes services of equipment,
clerkage and port workers out side container when
done other than by Port. |
|
|
| 3. |
Lift on/Lift off/ restacking by CPT
equipment. |
| a)Loaded |
900/- |
| b)Empty |
300/- |
|
| i) |
Restacking/removal of containers
will be done by CPT if the containers are not
removed from the Port premises within 10 days of
receiving, destuffing in case of import
containers or not booked to a subsequent vessel
in case of shut-out containers. |
| ii) |
No charge shall be levied if the
services are not rendered by the CPT equipment. |
|
|
| 4. |
Transportation of container by CPT
trailer. |
a) Within the same berth.
200/-
b) From one berth to another. 400/- |
|
| 5. |
Transhipment of container. |
a) Loaded - 6000/-
b) Empty - 750/- |
Includes wharfage on container and cargo. |
| 6. |
Overside discharge/ shipment of
containers. |
| a) |
Loaded |
50% of the rate specified at SL.NO.
1. |
| b) |
Empty |
|
|
Includes wharfage on container and cargo. |
| 7. |
Shifting of containers on board vessel/
Barge by CPT equipment other than by 200 Ton cantilever/
floating crane. |
| a) Loaded |
800/- |
| b) Empty |
400/- |
|
In case of use of 200 Ton cantilever/
floating crane respective hire charge under Section 19.1
shall be levied extra. |
| 8. |
Shifting of containers from one hatch to
another hatch through quay. |
| a) Loaded 2000/- |
| b) Empty 500/- |
|
|
| 9. |
Supply of power to reefer containers. |
| Loaded / Empty |
750/- Per shift or part thereof. |
|
|
|
| Note : |
| i) |
Charge for handling of
container above 20' and upto 40' in length shall be 1.5
times the rates specified at section 9 & 10 charge
for handling of container above 40' shall be two times
the rate specified at section 9 & 10 charge for
supply of power to refer container above 20' in length
shall be levied at twice the rate specified at Sl.No. 9
& 10. |
| ii) |
Container received either at
container terminal or at place other than container
terminal, if subsequently shipped through places other
than where it was originally received, charges as
specified in section 9, Sl.No.1 shall be levied No.
separate charge for be levied.In similar cases ICD (Inland
container Depot) Container, originally received either at
container terminal or at places other than container
terminal , if subsequently delivered / shipped through
places other than where it was originally received,
charges as specified in section 13. shall be levied
instead of charge as specified in Section-9, Sl.No.1. |
| iii) |
In case of import container
containing more than one "Import Category" the
rate applicable to the higher "ImportCategory"
shall be levied. |
| iv) |
In case of export container containing
more than one 'Export Category' the rate applicable to
the higher 'Export Category' shall be levied. |
| v) |
Importer / EXporter shall be granted , on
the additional TEUS handled in excess of 1200 TEUS in a
financial year , a rebate of 10% on rates specified under
SL. No. 1 of Section 9 and 10 *.
The afotesaid rebate shall be granted in the form of
refund at the end of every finalcial year (i.e. 1st April
to 31st March) on submission of documents by the
Importers / Exporters in support of throughpot achieved. |
| * Amendments :
Published in the Gazette of India Extraordinary(Part-III,
Sec.4) on 6th Sept.2001 vide Gazette No.241. |
| |
Volume of Discount in Cont.
handling |
Discount/Concession |
| a) |
For handling 51-100 TEU's per
month by individual Importer/Exporter. |
5% of Consolidated Box Rate. |
| b) |
For handling above 100 TEU's
per month by individual Importer/Exporter. |
10% of the Consolidated Box
Rate. |