KOLKATA PORT TRUST

Cargo & Container related charges at
Kolkata Dock System :


Handling Charges on ICD Containers :


Sl. No.

Service

Type & Rate Per TEU
(in Rs)

Remarks


1. Consolidated handling charges on ICD Containers at 7 / 8 NSD including unhooking of containers on quay, transportation from hook point to container yard (CY) and lift-off or vice-versa as also lift on lift-off of container for delivery, receiving or restacking. Loaded 4,500/-

Empty 750/-

i) Includes wharfage on container and cargo.
ii) Includes consolidated charge on cargo carried by Railway wagons and local haulage.
2. Consolidated handling charge on ICD containers at berths other than 7 /8 NSD including hooking / unhooking on quay for shipment / landing. Loaded 3,350/-

Empty 500/-

i) Includes wharfage on container and cargo.
ii) Includes consolidated charge on cargo carried by Railway wagons and local haulage.
3. Supply of power to reefer container. Loaded / Empty 750/- per shift or part thereof  

Note :

  1. The above ICD rates shall be applicable provided such container moves by wagon to / from docks or CPT Block Terminal.
  2. Charge for handling of container above 20' and upto 40' in length shall be 1.5 times the rates specified at Section 13 and charge for handling of container above 40' shall be 2 times the rates specified at Section 13.Charges for supply of power to refere container above 20' length shall be levied at twice the rate specified at Section 13,SL.No.3.
  3. The rates specified under Section 13 shall also be applied to containers carried by Railway from / to destinations other than ICD which are landed / shipped at CDS.

13.1 Storage Charge on ICD Containers : Rate per TEU per Day or part thereof
(i) Loading conatiner including cargo (import) other than of Hazardous Category-1.

For the first 15days from the date of landing.

NIL
  From 16th to 30th day. $ 12.0
  From 31st day onwards. $ 16.0
ii) Loaded Container including cargo (export / Stock)  
  For the first 15th days from the date of receiving in port NIL
  From 16th to 30th day. $ 5.0
  From 31st day onward. $ 6.0
iii) Rates as provided in Section 12.1 of Sceal of Rates shall apply on empty container.  
iv) On containers containing Hazardous - I cargo, either import or export, demurage at the highest slab shall be levied as specified in (i) & (ii) above after allowing a free time of 1 day after the date of landing or receiving.  

NOTE :

1). Demurrage on wagons will be interms of povision of existing CPT Railway Demurrage Rules.

2) Demurrage on container above 20' shall be twice the rate specified at Section 13.1.

3) The rate for demurrage on ICD container shall also apply to containers carried by Railway wagons which are landed or shipped at CDS.

Back to Index

Click here to Email us

All Contents Copyright © 1998, Kolkata Port Trust, India.