KOLKATA PORT TRUST

Cargo & Container related charges at
Kolkata Dock System :


Lifting Charges :

5 Lifting Charges :
5.1 Lifting charges shall be levied on packages/articles weighing 5 Tons and above in addition to wharfage as per Section-4 at the following rates if port equipment is used at the time of delivery/ receiving/ restacking or for any other operation except for stacking on landing or lifting for shipment. However such charge shall not be leived in case of direct delivery/ Shipment from/into vessel/Barge/Boat/Lash Barg etc.*

Sl. No. Description Rate in Rs.
per tonne

1.

Article / package weighing Tons and upto 10 Tons 100.00
2. Article / package weighing above 10 Tons and upto 20 Tons 200.00
3. Article / package weighing above 20 Tons and upto 40 Tons. 400.00
4. Article / package weighing above 40 Tons 800.00

   
5.2 For any additional loading/unloading/restacking of packages/articles weighing ;ess than 5 tonne other than the operations covered under "Wharfage" as defined under section 2(xxiv) and additional charge @ Rs. 60/- per tonne or part thereof shall be levied if done bt port Labour/equipment.
*Amendment: Published in the Gazette of India Extraordinary (Part-III, Sec.4) on 6 Sept. 2001 vide Gazette No 241:-
  Type of Charges

Lifting charges for handling of Logs

Discount/Concession

100% on each Log weighting upto 20 tonnes.

Back to Index

Click here to Email us

All Contents Copyright © 1998, Kolkata Port Trust, India.