Tenders - Archive

Print Version  
Last Updated On: 25-March-2020
Choose Any to Filter:
 
Administration Department
S.No Title & Ref.No Corrigendums Published Date Bid Open Date Details
1 Empanelment of Advertising Agencies ...-27-September-2019   30-Sep-2019 09:30:00 21-Oct-2019 16:00:00 View
2 Planning, Organising and Conducting Events/Activitiesrelated to 150th year celebrations..-25--June-2019   25-Jun-2019 11:00:00 25-Jul-2019 15:00:00 View
3 Planning, Organising and Conducting Events/Activities related to 150th year celebrations..-25-June-2019
» ADDENDUM/CORRIGENDUM - I
» Addendum/Corrigendum-II
» ADDENDUM/CORRIGENDUM -III
25-Jun-2019 11:21:00 27-Jul-2019 15:00:00 View
4 Tender for Printing, Binding & Supply of Administrative Report..-20-May-2019   20-May-2019 11:59:00 20-Jun-2019 15:00:00 View
5 Washing/Laundry service - 07-Mar-2019   07-Mar-2019 12:30:00 26-Mar-2019 15:00:00 View
6 Design and decoration of Kolkata Port Trust stall including production of exhibition materials in Domestic RBSM during India Rubber Expo 2019 at Mumbai   24-Dec-2018 13:00:00 31-Dec-2018 14:00:00 View
7 Design, production and printing of executive diaries of Kolkata Port Trust for the year 2019 - 27-Nov-2018   27-Nov-2018 17:29:00 03-Dec-2018 14:00:00 View
8 Design, production and printing of normal diaries of Kolkata Port Trust for the year 2019 - 27-Nov-2018   27-Nov-2018 17:29:00 03-Dec-2018 14:00:00 View
9 Design, production and printing of desk calendars...26-Nov-2018   26-Nov-2018 12:36:00 03-Dec-2018 14:00:00 View
10 Design, production and printing of special six page wall calendars...26-Nov-2018   26-Nov-2018 12:40:00 03-Dec-2018 14:00:00 View
11 Design, production and printing of single page wall calendars...26-Nov-2018   26-Nov-2018 12:42:00 03-Dec-2018 14:00:00 View
12 Providing Photocopying services to General Administration Department of Kolkata Port Trust - 16-July-2018   16-Jul-2018 14:20:00 10-Aug-2018 15:30:00 View
13 Engagement of facilitator / service provider for compliance with EPFO requirement of uploading and processing employee data - 13-July-2018   13-Jul-2018 16:05:00 03-Aug-2018 15:30:00 View
14 Printing, Binding and Supply of Administration Report - 13-June-2018
» Corrigendum-I
13-Jun-2018 15:56:00 06-Jul-2018 15:30:00 View
15 Expert Services towards implementation of Integrated Management System...25-May-2018   25-May-2018 15:22:00 12-Jun-2018 15:30:00 View
16 Engagement of Agency for Providing Messenger Service...13-April-2018
» Corrigendum-1
13-Apr-2018 17:18:00 16-May-2018 15:30:00 View
17 Upkeepment and errand services to General Administration Department - 27-Nov-2017   27-Nov-2017 11:50:00 02-Jan-2018 15:30:00 View
18 Design, production and printing of normal diaries of Kolkata Port Trust...25-Nov-2017   25-Nov-2017 14:10:00 29-Nov-2017 14:00:00 View
19 Design, production and printing of executive diaries of Kolkata Port Trust...25-Nov-2017   25-Nov-2017 14:20:00 29-Nov-2017 14:00:00 View
20 Design, production and printing of desk calendars of Kolkata Port Trust....14-Nov-2017
» Corrigendum
14-Nov-2017 11:30:00 21-Nov-2017 14:00:00 View
21 Design, production and printing of single page wall calendars of Kolkata Port Trust....14-Nov-2017   14-Nov-2017 12:00:00 21-Nov-2017 14:00:00 View
22 Design, production and printing of special six page wall calendars of Kolkata Port Trust...14-Nov-2017
» Corrigendum
14-Nov-2017 12:10:00 21-Nov-2017 14:00:00 View
23 Printing, Binding and Supply of Administrative Report for 2016-17   12-Jul-2017 17:40:00 07-Aug-2017 12:00:00 View
24 Design of the Cover of Administrative Report for the year 2016-17   12-Jul-2017 17:45:00 08-Aug-2017 12:00:00 View
25 Washing/laundry service for Washing and ironing of Selected curtains...15-Dec-2016   15-Dec-2016 11:20:00 13-Jan-2017 15:00:00 View
26 Greetings card with matching envelope...22-Nov-2016   22-Nov-2016 12:25:00 25-Nov-2016 15:00:00 View
27 Design, production and printing of single page wall calendars of Kolkata Port Trust for the year 2017   16-Nov-2016 12:35:00 21-Nov-2016 16:00:00 View
28 Design, production and printing of special six page wall calendars of Kolkata Port Trust for the year 2017   16-Nov-2016 14:10:00 21-Nov-2016 16:00:00 View
29 Washing/laundry service - 02-Nov-2016   02-Nov-2016 09:30:00 25-Nov-2016 15:00:00 View
30 De-pesting of Guesthouse of Kolkata Port Trust at 93,Chowringhee Road...22-Sept-2016   23-Sep-2016 09:30:00 20-Oct-2016 15:00:00 View
31 Photocopying work in the Head Office...05-AUG-2016   05-Aug-2016 11:50:00 23-Aug-2016 15:00:00 View
32 Printing, Binding & Supply of Administrative Report...12-July-2016   12-Jul-2016 15:30:00 01-Aug-2016 15:00:00 View
33 Design of the Cover of Administrative Report ...12-July-2016   12-Jul-2016 15:30:00 28-Jul-2016 15:00:00 View
34 Photocopying work...25-May-2016   25-May-2016 11:20:00 20-Jun-2016 15:00:00 View
35 Decoration of Kolkata Port Trust stall including production of exhibited materials in the Maritime India Summit 2016 at Bombay Convention & Exhibition Centre, Mumbai...02-March-2016
» Addendum
02-Mar-2016 14:40:00 15-Mar-2016 14:00:00 View
36 Appointment of Agency for providing application screening..-07-Jan-2016   07-Jan-2016 13:10:00 15-Jan-2016 14:30:00 View
37 Appointment of Agency for providing Application Screening and Data Processing Services.-18-Dec-2015
» Corrigendum
» Discharged
18-Dec-2015 13:10:00 Tender has been Terminated View
38 Design, production and printing of single page wall calendars...23-Nov-2015   23-Nov-2015 14:20:00 03-Dec-2015 12:00:00 View
39 Design, production and printing of special six page wall calendars...23-Nov-2015   23-Nov-2015 14:35:00 03-Dec-2015 12:00:00 View
40 Design of the Cover of Administrative Report...10-June-2015   10-Jun-2015 12:00:00 29-Jun-2015 16:30:00 View
41 Printing, Binding & Supply of Administrative Report...10-June-2015   10-Jun-2015 12:05:00 29-Jun-2015 16:30:00 View
42 Supply & operation of Lorry...14-May-2015   14-May-2015 15:30:00 12-Jun-2015 15:30:00 View
43 Supply & operation of Bus - 14-May-2015   14-May-2015 15:35:00 12-Jun-2015 16:00:00 View
44 Supply & Operation of Tata 207...   02-Apr-2015 16:25:00 30-Apr-2015 14:30:00 View
45 Hiring of Turn-out-Van...   02-Apr-2015 16:30:00 30-Apr-2015 15:30:00 View
46 Engagement of Agency for providing Messenger Service   25-Mar-2015 17:00:00 28-Apr-2015 15:00:00 View
47 Supply & Operation of Tata 207 or any other Similar Model - 26-Feb-2015   26-Feb-2015 12:00:00 20-Mar-2015 14:30:00 View
48 Hire of Turn-out-Van (24 hrs fixed duty, model-Tata-410) - 26-Feb-2015   26-Feb-2015 12:10:00 20-Mar-2015 15:30:00 View
49 Grant of permission for operating Floating Storage and Regasification Unit (FSRU) / Floating Storage Unit (FSU) for receiving, storing, regasifying (optional) and transporting LNG. - 27-Feb-2015
» Minutes of the Pre-Bid Meeting
17-Feb-2015 11:00:00 16-Mar-2015 15:00:00 View
50 Providing Messenger Service   16-Dec-2014 11:30:00 14-Jan-2015 15:00:00 View
51 Operating Floating Storage and Regasification Unit(FSRU) / Floating Storage Unit (FSU)
» Clange of clause
» Change of Clause and extension of opening date
» Change of Clause and extension of opening date - II
10-Dec-2014 15:00:00 16-Feb-2015 15:00:00 View
52 Hire of 24 hours Fixed Duty Ambulance   27-Nov-2014 11:00:00 26-Dec-2014 14:30:00 View
53 Tender for Supply & Operation of Tata 207 or any other Similar Model.
» Extension
02-Sep-2013 00:00:00 24-Feb-2014 00:00:00 View
 
Civil Engg. Department
S.No Title & Ref.No Corrigendums Published Date Bid Open Date Details
1 Supply of manpower for operating / running automatic organic waste composting machine at Portland Park...-13-March-2020
» CORRIGENDUM
13-Mar-2020 17:48:00 23-Mar-2020 15:00:00 View
2 Maintenance and upkeepment of clay tennis court at Kantapukur CISF Barrack...-10-March-2020   10-Mar-2020 10:44:00 27-Mar-2020 15:00:00 View
3 Supply of manpower for operating / running automatic organic waste composting machine at Portland Park...-28-February-2020   28-Feb-2020 11:08:00 11-Mar-2020 15:00:00 View
4 Petty Miscellaneous repair works including plumbing and sanitary works at KoPT Campus at Nischintapur...-27-February-2020   27-Feb-2020 12:32:00 19-Mar-2020 14:00:00 View
5 Repairing of existing G.I. Pipe railings including replacement of members wherever necessary...-25-February-2020   25-Feb-2020 09:30:00 18-Mar-2020 15:00:00 View
6 Construction of boundary wall as per ISPS Specification surrounding the Pilot Station Campus at Sagar...-25-February-2020   25-Feb-2020 16:35:00 19-Mar-2020 15:00:00 View
7 Upgradation of Transport Depot Road (from Hide Road Junction to Goragacha Level Crossing)...17-Feb-2019
» CORRIGENDUM-I
» CORRIGENDUM-II
17-Feb-2020 13:45:00 19-Mar-2020 15:00:00 View
8 Removal of refuse, garbage etc from the different offices, residential colonies of KoPT...14-February-2020   14-Feb-2020 11:53:00 06-Mar-2020 14:00:00 View
9 Supply of truck mounted mechanical road sweeping machine on hire for regular cleaning / sweeping ...-14-February-2020
» CORRIGENDUM-I
14-Feb-2020 14:45:00 06-Mar-2020 14:00:00 View
10 Cleaning of jungles of yard etc. at the operational areas of EJC Yard from Majerhat to Sonodingi...-10-February-2020   10-Feb-2020 13:12:00 26-Feb-2020 15:00:00 View
11 Maintenance of existing landscape and garden of KOPT Centenary Hospital, Quarter Complex...-10-February-2020   10-Feb-2020 13:28:00 26-Feb-2020 15:00:00 View
12 Periodical maintenance work of different road inside and outside of Dock area...-31-January-2020   31-Jan-2020 15:26:00 24-Feb-2020 14:00:00 View
13 Providing water proofing treatment to roofs of building nos 3,4,5,7, & 8 including Civil Works...-20-January-2020   20-Jan-2020 11:25:00 13-Feb-2020 14:00:00 View
14 Reparing of black top road at Subhash Bhavan, Nimak Mahal compound, Depressed portion of Lybian Warehouse ...-15-January-2020   15-Jan-2020 11:56:00 06-Feb-2020 14:00:00 View
15 Miscellaneous conservancy upkeepment / housekeeping works including plantation and beautification work...-14-January-2020   14-Jan-2020 14:27:00 05-Feb-2020 14:00:00 View
16 Cleaning of silt including removing of left over materials, Garbage mixed with rubbish and all other filthy materials...-14-January-2020   14-Jan-2020 16:29:00 06-Feb-2020 15:00:00 View
17 Thorough repairing and painting to exterior walls and common areas of the buildings no. 1 to 16 (excluding bldg.no.6& 13) at Remount Road..13-January-2020
» Corrigendum I
13-Jan-2020 10:44:00 06-Feb-2020 14:00:00 View
18 Construcion of patrolling track along the boundary wall at Alifnagar Coal Dumping Yard...-09-January-2020   09-Jan-2020 12:59:00 28-Jan-2020 15:00:00 View
19 Providing assistance for upkeepment of the office premises of Superintending Engineer(Dev) at 51, C.G.R. Road...-07-January-2019   07-Jan-2020 14:57:00 31-Jan-2020 14:00:00 View
20 Patch reparing of Sonarpur road star􀆟ng from Jain Kunj crossing to Paharpur Colling Tower...-06-January-2020   06-Jan-2020 17:25:00 30-Jan-2020 14:00:00 View
21 Design,fabrication,supply,test,deliver of one no. Main Pontoon of size 30.00 mx9.25mx1.60m...-03-January-2019
» CORRIGENDUM-I
» CORRIGENDUM-II
03-Jan-2020 13:28:00 07-Feb-2020 14:00:00 View
22 Low cost Strengthening of yard on the north of railway track no. 23 at EJC Yard...-03-January-2019   03-Jan-2020 15:22:00 28-Jan-2020 15:00:00 View
23 Construction of Security Goomty and Toilet block with a Drinking Water Centre...-03-January-2019   03-Jan-2020 15:34:00 28-Jan-2020 14:00:00 View
24 Modification of bays at second floor,Fairlie warehouse into office accomodation...-01-January-2020
» CORRIGENDUM-I
01-Jan-2020 15:14:00 29-Jan-2020 14:00:00 View
25 Repairing of existing G.I. Pipe railings including replacement of members wherever necessary for accessing different parts...-30-December-2019   30-Dec-2019 12:00:00 21-Jan-2020 15:00:00 View
26 Restoration and relaying of water supply line including construction of Trench wherever is necessary and other allied works...-30-December-2019   30-Dec-2019 16:23:00 22-Jan-2020 14:00:00 View
27 Repairing/Renovation of floor and entrance doors of quarter No. 7/2 Dumaynue Avenue quarter...26-December-2019   26-Dec-2019 14:48:00 09-Jan-2020 15:00:00 View
28 Proposed LED Signage Board at approach jetties of KPD & NSD (2 NOS....-23-December-219
» CORRIGENDUM-I
23-Dec-2019 15:33:00 18-Jan-2020 15:00:00 View
29 Development of road as per CRRI scheme including alongside drain and footpath....20-Dec-2019
» CORRIGENDUM-I
20-Dec-2019 16:45:00 31-Jan-2020 15:00:00 View
30 “Providing upkeepment and maintenance of the office under Superintending Engineer(Rly)...20-Dec-2019   20-Dec-2019 16:55:00 10-Jan-2020 15:00:00 View
31 Supply of Daily labours at various sites under Kolkata Section.....18-Dec-2019   18-Dec-2019 15:25:00 09-Jan-2020 15:00:00 View
32 Construction of 7.5 m high separation wall with RCC frame along the N. S. Dry Dock   16-Dec-2019 15:15:00 08-Jan-2020 15:00:00 View
33 Construction of Cross Gantry Path at Basra Yard, NS Dock..12-December-2019   12-Dec-2019 14:34:00 08-Jan-2020 14:00:00 View
34 Refurbishment of PSO’s meeting room and same allied works..-12-December-2019   12-Dec-2019 17:21:00 24-Dec-2019 12:00:00 View
35 Miscelaneous conservancy upkeepment works inside Netaji Subhash Dock Area (including Libyan Ware House and Subhas Nagar CISF Qtrs..-11-December-2019   11-Dec-2019 11:05:00 03-Jan-2020 14:00:00 View
36 Construction of drain from Braithwaite Company to Sonai Road road side drain..-06-December-2019   06-Dec-2019 10:34:00 27-Dec-2019 15:00:00 View
37 One time cleaning / removal of deposited sludge from the sewage pit of Centenary Hospital..-05-December-2019   05-Dec-2019 12:00:00 23-Dec-2019 15:00:00 View
38 Displaying various board/signal/direction and symbols at inside K. P .Dock...-05-December-2019   05-Dec-2019 15:46:00 17-Dec-2019 15:00:00 View
39 Removal of heaped rubbish , stacked earth and cleaning of the dock premises at Dock-II..-05-December-2019   05-Dec-2019 16:11:00 27-Dec-2019 15:00:00 View
40 Supply & installation of rubber fenders inside NSD Dock basin on all berths except 7 NSD berth & other allied works..-05-December-2019
» Corrigendum-I
» Corrigendum II
05-Dec-2019 17:30:00 14-Jan-2020 14:00:00 View
41 Intermediate contract for carrying out miscellaneous conservancy upkeepment works for switching over from different ongoing contracts..-04-December-2019
» CORRIGENDUM-I
04-Dec-2019 17:01:00 27-Dec-2019 12:00:00 View
42 Engagement of one skilled person in drawing office of Civil Engineering Department...-03-December-2019   03-Dec-2019 14:46:00 26-Dec-2019 15:00:00 View
43 Rodent Control Treatment of all sheds at Dock-I (East &West) and Dock-II except shed No.11 (Passenger Terminal)...-02-December-2019   02-Dec-2019 13:33:00 24-Dec-2019 14:00:00 View
44 Inside & Outside thorough Repairing/renovation of CIVIL ENGINEERING DOCK OFFICE (New Building)..-29-November-2019   29-Nov-2019 10:20:00 19-Dec-2019 14:00:00 View
45 Water Proofing Treatment on Roof Surfaces at Subhas Bhaban Complex, N. S. Docks..-28-November-2019   28-Nov-2019 15:15:00 19-Dec-2019 14:00:00 View
46 Cleaning underground and above ground filter water reservoir at Centenary Hospital...-28-November-2019   28-Nov-2019 15:36:00 12-Dec-2019 15:00:00 View
47 Construction of Paver Block road from 10 no. NSD to Gate to 11 no. NSD Gate..-27-November-2019   27-Nov-2019 14:49:00 18-Dec-2019 14:00:00 View
48 Petty miscellaneous repair works including plumbing & sanitary works at Kolkata Port Trust Campus at Sagar Island..-26-November-2019   26-Nov-2019 11:26:00 17-Dec-2019 14:00:00 View
49 Annual Maintenance of Deck joints at Rabindra Setu carriage way for a period of one year..-25-November-2019   25-Nov-2019 12:18:00 17-Dec-2019 14:00:00 View
50 Refurbishment of PSO's meeting room and allied works..-21-November-2019   21-Nov-2019 14:26:00 06-Dec-2019 15:00:00 View
51 Removal / levelling of hipped up debris from different area along the internal road side of N.S Dock..-19-November-2019   19-Nov-2019 16:38:00 11-Dec-2019 14:00:00 View
52 Inside thorough renovation of Libyan Ware House for Ground floor,1st. floor and 2nd floor..-15-November-2019   15-Nov-2019 15:51:00 09-Dec-2019 14:00:00 View
53 Development of Alley roads at Kantapukur shed area from remount road to Jagannath temple..-14-November-2019
» CORRIGENDUM-I
14-Nov-2019 17:32:00 20-Dec-2019 15:00:00 View
54 Technical services covering planning, designing and supervision of construction with allied works for Refurbishment of Subhas Bhawan...11-November-2019   11-Nov-2019 14:53:00 10-Dec-2019 14:00:00 View
55 Revitalization of Clock Tower Jetty near no. 8 work shop,Kolkata Port Trust
» Corrigendum-I
» CORRIGENDUM-II
07-Nov-2019 12:25:00 20-Nov-2019 15:00:00 View
56 Thorough repairs and renovation to inside & outside including plumbing & sanitary works..-04-November-2019
» CORRIGENDUM-I
04-Nov-2019 12:26:00 03-Dec-2019 14:00:00 View
57 Thorough repair to the metal approach road from Kakdwip road to LRRS Station’s building..04-November-2019
» CORRIGENDUM-I
04-Nov-2019 16:04:00 27-Nov-2019 15:00:00 View
58 Erection of Notification Boards & R.C.C.Demarcation Pillars in KOPT’s Properties in Kolkata/Howrah/Outstation ..-30-October-2019   30-Oct-2019 11:39:00 20-Nov-2019 14:00:00 View
59 Construction of Brick Boundary Wall Fencing, Bamboo Post Fencing, around KoPT’s properties in Kolkata/Howrah/Outside..-30-October-2019   30-Oct-2019 15:12:00 27-Nov-2019 14:00:00 View
60 Repair/Restoration of Under structure of Rabindra Setu between (H.P.14 to 17) damaged due to collision by CIWTC Vessels M.T.SAPTAGRAM..-23-October-2019   23-Oct-2019 15:14:00 14-Nov-2019 14:00:00 View
61 Development of two wheeler parking area beside 4 & 3 NSD gate including drainage system..-22-October-2019
» CORRIGENDUM-I
22-Oct-2019 12:21:00 13-Nov-2019 14:00:00 View
62 Development of Reefer Parking Yard behind Libyan Ware House & at erstwhile Brace Bridge Officers’ quarter complex..-21-October-2019
» CORRIGENDUM-I
21-Oct-2019 15:02:00 15-Nov-2019 14:00:00 View
63 Repairs to the existing boundary wall including fixing of concertina in place of existing barbed wire..-18-October-2019   18-Oct-2019 15:33:00 19-Nov-2019 15:00:00 View
64 Construction of new Canteen Building near Gate No.-3 , N.S Dock. And Electrical Installation work..-11-October-2019   11-Oct-2019 17:22:00 05-Nov-2019 14:00:00 View
65 Levelling of depressed surfaces by laying of new paver blocks (M-50 grade) and relaying of old paver blocks..-10-October-2019   10-Oct-2019 10:27:00 31-Oct-2019 14:00:00 View
66 Waterproofing treatment work by APP modified prefabricated water proofing membrane and other ancillary /allied works..-10-October-2019
» CORRIGENDUM-I
10-Oct-2019 10:39:00 31-Oct-2019 15:00:00 View
67 Repairing/modification of 6 nos gates of K.P.Docks(Gate no.1,2,3,4,5&13 at Dock-I & II) for implementation of RFID project..-10-October-2019   10-Oct-2019 10:48:00 31-Oct-2019 14:00:00 View
68 Barbed wire fencing with Angle post at the approach road to KoPT's Truck Terminal..-10-Octotber-2019   10-Oct-2019 11:05:00 31-Oct-2019 15:00:00 View
69 Fixing of railing along the quay face of 3no berth, N. S. Dock..-10-October-2019   10-Oct-2019 11:28:00 31-Oct-2019 15:00:00 View
70 Repairing, raising the height of boundary wall & painting including replacement of barbed wire..-10-October-2019   10-Oct-2019 15:23:00 05-Nov-2019 14:00:00 View
71 Rebuilding of Spur Nos. 132 & 133 and Nourishment of Spur Nos.134 & 135 at Nischintapur area (Nischintapur Bank..-04-October-2019
» CORRIGENDUM-I
» CORRIGENDUM-II
04-Oct-2019 16:25:00 19-Nov-2019 15:00:00 View
72 Repairing/renovation of existing store room with roofing of Zinc alloy sheet at roof top..-03-October-2019   03-Oct-2019 16:34:00 24-Oct-2019 15:00:00 View
73 Supply of truck mounted mechanical road sweeping machine on hire for one time cleaning / sweeping...-30-September-2019   30-Sep-2019 10:00:00 04-Oct-2019 15:00:00 View
74 PART- A “Supplying drinking water at different places by Water Tanker under N.S.Dock Division ...-30-September-2019   30-Sep-2019 14:05:00 22-Oct-2019 14:00:00 View
75 Repairing of damaged dock boundary wall as and when required at K.P.Docks –I (East) and Dry Dock..-25-September-2019   25-Sep-2019 11:18:00 15-Oct-2019 15:00:00 View
76 Tender for supply of mechanical excavator cum back-hoe , dumper and or lorry and unskilled labourers..-25-September-2019   25-Sep-2019 12:35:00 22-Oct-2019 14:00:00 View
77 Thorough renovation of road inside no.8 Workshop and other allied works N.S.D..-24-September-2019   24-Sep-2019 12:57:00 03-Oct-2019 14:00:00 View
78 Thorough repairing of both inside and outside of the 72 nos. units at Chetla Quarters premises...-20-September-2019   20-Sep-2019 14:37:00 17-Oct-2019 15:00:00 View
79 Development of garden along with beautification of the adjacent area of clay tennis court at Kantapukur CISF Barrack..-20-September-2019
» CORRIGENDUM I
20-Sep-2019 14:43:00 11-Oct-2019 15:00:00 View
80 Cutting and trimming branches of trees etc. At Dock-I (East & West), Dock-II, Dry Dock,CMM Compound..-13-September-2019   17-Sep-2019 10:46:00 20-Sep-2019 15:00:00 View
81 Thorough repairs & reconstruction of the entire boundary wall of the Remount Road Quarters Complex..-13-September-2019   13-Sep-2019 15:14:00 11-Oct-2019 15:00:00 View
82 Removal of rubbish, stacked mix earth,cleaning of the dock premises and other miscellaneous works..-12-September-2019   12-Sep-2019 11:37:00 04-Oct-2019 15:00:00 View
83 Rail post grouting at different gates of K.P.Docks (RFID)..-12-September-2019   12-Sep-2019 15:49:00 04-Oct-2019 15:00:00 View
84 Supply of one no. lorry fitted with round shaped tanker/water tanks with pump for sprinkling of water..-11-September-2019   11-Sep-2019 15:03:00 03-Oct-2019 14:00:00 View
85 Reconstruction of dilapilated / damaged wooden structures in the groove of the lock entrance..-09-September-2019   09-Sep-2019 13:15:00 01-Oct-2019 14:00:00 View
86 Monitoring of different selected Environmental Parameters for Air, Noise, Water & Sediment..-09-September-2019
» CORRIGENDUM-I
09-Sep-2019 13:25:00 14-Oct-2019 14:00:00 View
87 Detail Survey of inside NSD and it's adjacent outside areas , N.S Dock..-09-September-2019
» CORRIGENDUM-I
09-Sep-2019 15:25:00 01-Oct-2019 14:00:00 View
88 Preparation of Waste Management Plan for Kolkata Dock System and Haldia Dock Complex of Kolkata Port Trust...- 03-September-2019
» CORRIGENDUM-I
03-Sep-2019 12:24:00 23-Sep-2019 14:00:00 View
89 Leveling and strengthening of main road with stone set topping starting from 2 NSD GRJ gate..-02-September-2019   02-Sep-2019 14:29:00 25-Sep-2019 14:00:00 View
90 Periodical cleaning & disinfecting underground & above ground filter water reservoir /tanks..-30-Aug-2019   30-Aug-2019 12:17:00 19-Sep-2019 15:00:00 View
91 Repair /maintenance work of paver block yards/roads/berth etc. within premises of N.S Dock..-28-Aug-2019   28-Aug-2019 12:38:00 19-Sep-2019 14:00:00 View
92 Thorough Refurbishment of KoPT Head Office (Main & Annexe) including interior beautification, civil...-27-Aug-2019
» CORRIGENDUM-I
» CORRIGENDUM-II
» CORRIGENDUM III
» CORRIGENDUM-IV
» CORRIGENDUM-V
» CORRIGENDUM-VI
» CORRIGENDUM-VII
» Corrigendum-VIII
» Corrigendum-IX
27-Aug-2019 14:56:00 10-Jan-2020 15:00:00 View
93 Thorough repair of both inside and outside to Bldg. Nos. B-1,B-2,B-3,B-4 &A-2 (80 Units)at Subhash Nagar Qrs..-26-Aug-2019   26-Aug-2019 15:39:00 27-Sep-2019 15:00:00 View
94 Installation of Rail Post at different gates of N.S. Dock to protect the RFID System...-23-Aug-2019   23-Aug-2019 13:13:00 13-Sep-2019 15:00:00 View
95 Plantation of Trees at Dhobitala plot for Urban Forestry and along the dock boundary wall ..-23-Aug-2019   23-Aug-2019 17:21:00 04-Sep-2019 14:00:00 View
96 Petty repairs to different roads under South Division as per requirement to maintain the roads...-21-Aug-2019   21-Aug-2019 13:35:00 12-Sep-2019 14:00:00 View
97 Waterproofing treatment work by APP modified prefabricated water proofing membrane...-20-Aug-2019   20-Aug-2019 17:28:00 10-Sep-2019 15:00:00 View
98 General Maintenance for Up keeping of camp premises,sheds/Building etc including Office room...-16-Aug-2019   16-Aug-2019 16:10:00 26-Aug-2019 15:00:00 View
99 General maintenance for Up keeping of Civil Engineering accommodation and providing services...-16-Aug-2019   16-Aug-2019 16:17:00 26-Aug-2019 15:00:00 View
100 Supply of daily labour for various sites of River Training wing...-16-Aug-2019   16-Aug-2019 16:22:00 26-Aug-2019 15:00:00 View
101 Part-‘A’ “Cleaning and removing accumulated muck etc. From Bridge deck & Part 'B' Maintenance & Upkeepment of R/Setu office...-13-Aug-2019   13-Aug-2019 11:25:00 03-Sep-2019 14:00:00 View
102 Miscellaneous building repair works as may be necessary at Subhas Nagar, CISF Qtrs., Ramnagar CISF Camp...-13-Aug-2019   13-Aug-2019 13:18:00 05-Sep-2019 14:00:00 View
103 Water proofing treatment to roofs of building nos and 10, 11, 12, 14, & 16 at Remount Road KoPT complex...-13-Aug-2019   13-Aug-2019 16:54:00 05-Sep-2019 14:00:00 View
104 Petty plumbing and sanitary works as may be necessary at Portland Park Quarters..-09-Aug-2019   09-Aug-2019 10:41:00 29-Aug-2019 15:00:00 View
105 Providing services for up-keepment of Truck Parking Terminals of Kolkata Port Trust..-09-Aug-2019   09-Aug-2019 12:14:00 30-Aug-2019 14:00:00 View
106 Pumping out of stagnated water from any location (both inside & outside Dock area) under N. S. Docks..-09-Aug-2019   09-Aug-2019 12:36:00 28-Aug-2019 15:00:00 View
107 Supply of unskilled labour at any location (both inside and outside dock area..-07-Aug-2019   07-Aug-2019 13:14:00 27-Aug-2019 15:00:00 View
108 Operation of pump motor set at A Shed reservoir including valve operation in connection with the supply of water to passenger vessel..-07-Aug-2019   07-Aug-2019 13:22:00 27-Aug-2019 15:00:00 View
109 Reconstruction (shifting) of boundary wall near 3NSD gate along Lybian Warehouse..-07-Aug-2019   07-Aug-2019 15:37:00 30-Aug-2019 15:00:00 View
110 Repair/Renovation of Outram Ghat Jetty No. 2 for creation of common user tourism facility..-05-Aug-2019
» CORRIGENDUM-I
» CORRIGENDUM II
» CORRIGENDUM-III
» CORRIGENDUM IV
05-Aug-2019 16:25:00 18-Oct-2019 15:00:00 View
111 Operation & maintenance of Water Treatment Plant at inside N.S. Dock near 4, NSD Gate..-26-July-2019   26-Jul-2019 11:38:00 20-Aug-2019 14:00:00 View
112 Miscellaneous works for security purposes at Majerhat TXR Mazdoor line..-26-July-2019   26-Jul-2019 12:39:00 31-Jul-2019 15:00:00 View
113 Cutting various sizes plants grown up on the external surfaces of buildings walls..-26-July-2019
» CORRIGENDUM
26-Jul-2019 12:48:00 14-Aug-2019 15:00:00 View
114 Supplying and fixing Fibre Reinforced Polyester Resin Cover for protection of bottom of Hanger Posts..26-July-2019   26-Jul-2019 16:25:00 20-Aug-2019 15:00:00 View
115 Providing services for general upkeepment (Attendant and Housekeepers),maintenance and housekeeping..-25-July-2019   25-Jul-2019 15:15:00 07-Aug-2019 14:00:00 View
116 Plantation of Trees at Dhobitala plot for Urban Forestry and along the dock boundary wall (inside) of N.S Dock..25-July-2019   25-Jul-2019 15:22:00 06-Aug-2019 14:00:00 View
117 Supply & Commissioning of automatic organic Waste Composting Machine including operation & maintenance...-24-July-2019
» CORRIGENDUM-I
24-Jul-2019 14:12:00 21-Aug-2019 14:00:00 View
118 Cleaning of chokage drain near Transworld CFS to Sonarpur road through the back side of AL-Cargo Terminal...-19-July-2019   19-Jul-2019 14:18:00 30-Jul-2019 15:00:00 View
119 Technical services covering, planning, designing including architectural design services and master planning services for the development...-18-July-2019   18-Jul-2019 10:53:00 02-Aug-2019 14:00:00 View
120 Petty Miscellaneous repairing works, petty plumbing and sanitary works including periodical jungle cutting...-17-July-2019   17-Jul-2019 13:31:00 08-Aug-2019 14:00:00 View
121 Fencing of one KoPT Land at Gravel Siding (earlier occupied by M/S DARCL Logistics Ltd) at G.C.D Area, Kolkata..-15-July-2019   16-Jul-2019 12:00:00 07-Aug-2019 15:00:00 View
122 Supplying and providing Anti Termite treatment at the Port Land Park...-16-July-2019   16-Jul-2019 14:08:00 08-Aug-2019 14:00:00 View
123 Fencing of one KoPT Land at Gravel Siding (earlier occupied by M/S DARCL Logistics Ltd)..-16-July-2019   16-Jul-2019 12:00:00 07-Aug-2019 15:00:00 View
124 Patch repairing to the carriage ways of different out roads and Inside road of Dymayne Avenue..-12-July-2019   12-Jul-2019 11:33:00 02-Aug-2019 14:00:00 View
125 Development of gardens at different areas of N.S. Docks and maintenances..-11-July-2019
» CORRIGENDUM-I
11-Jul-2019 11:29:00 01-Aug-2019 14:00:00 View
126 Procurement/Updation of Autodesk products at Civil Engineering Department..-10-July-2019
» Corrigendum-I
10-Jul-2019 12:53:00 17-Jul-2019 15:00:00 View
127 Misc. petty repairs at Nimak Mahal Quarters, PSO Office Complex at P-65 CGR Road..-10-July-2019   10-Jul-2019 13:04:00 01-Aug-2019 14:00:00 View
128 Construction of drain from Braithwaite Company to Sonai ...-10-July-2019
» CORRIGENDUM-I
10-Jul-2019 13:10:00 30-Jul-2019 15:00:00 View
129 Petty Misc repairs to shed buildings , goomties at Dock-II (East and West) area...-10-July-2019   10-Jul-2019 13:17:00 30-Jul-2019 15:00:00 View
130 Cleaning and disinfecting G.I, PVC, and Masonry water reservoir, steel tank at different size...-10-July2019   10-Jul-2019 16:40:00 01-Aug-2019 15:00:00 View
131 Renovation to the Diamond Harbour Inspection Bungalow of Kolkata Port Trust...-10-July-2019   10-Jul-2019 17:03:00 31-Jul-2019 14:00:00 View
132 Removal / levelling of hipped up debris from different area along the internal road side of N.S Dock...-09-July-2019   09-Jul-2019 14:31:00 30-Jul-2019 14:00:00 View
133 Cleaning of septic tanks, inspection pits etc and providing services of mechanical pumps..-9-July-2019   09-Jul-2019 16:29:00 19-Jul-2019 15:00:00 View
134 Through repairing of Gangra Tidal Station including sinking of 50 mm dia new tube well..-9-July-2019   09-Jul-2019 16:36:00 31-Jul-2019 15:00:00 View
135 Supply & Commissioning of automatic organic Waste Composting Machine ..-8-July-2019
» CORRIGENDUM-I
» Corrigenum-II
08-Jul-2019 12:20:00 Tender has been Terminated View
136 Remodelling of tilted boundary wall by ornamental grill with granite cladding..-8-July-2019
» CORRIGENDUM-I
» CORRIGENDUM-II
08-Jul-2019 15:50:00 30-Jul-2019 14:00:00 View
137 Construction of 4NSD main gate at Netaji Subhas Dock including developmentof outside area of 4 NSD..-5-July-2019   05-Jul-2019 15:56:00 07-Aug-2019 15:00:00 View
138 Construction of dedicated RCC cable trench at Alifnagar, 13 & 14, NSD coal storage area   04-Jul-2019 14:34:00 25-Jul-2019 14:00:00 View
139 Miscellaneous additional civil works and other works in connection with construction of a Rest Shed Office..-7-July-2019   03-Jul-2019 17:08:00 26-Jul-2019 15:00:00 View
140 Misc. petty repairs to sheds, buildings Goomties etc. at Dock-I (West) area including...-02-July-2019   02-Jul-2019 15:26:00 24-Jul-2019 15:00:00 View
141 Petty repair works to Sister Nivedita Abasan , Sheds , Buildings , other structures , CISF Barrack..-2-July-2019
» CORRIGENDUM-I
02-Jul-2019 16:39:00 24-Jul-2019 15:00:00 View
142 Miscellaneous building, repair works and other allied works including plumbing and sanitary...-01-July-2019   01-Jul-2019 12:07:00 22-Jul-2019 14:00:00 View
143 E-Tender for Petty Plumbing and Sanitary works at Dock-II (E & W), Sister Nivedita ..-01-July-2019
» CORRIGENDUM-I
01-Jul-2019 16:37:00 23-Jul-2019 15:00:00 View
144 Repairing, painting & raising the height of old partially damaged boundary...-01-July-2019
» CORRIGENDUM-I
01-Jul-2019 17:08:00 23-Jul-2019 15:00:00 View
145 Miscellaneous petty repairs at Subhash Bhavan complex in NSD..-28-June-2019   28-Jun-2019 12:09:00 19-Jul-2019 15:00:00 View
146 Petty Plumbing and Sanitary works inside N.S. Dock, CFS building, CHE building..-28-June-2019   28-Jun-2019 12:23:00 19-Jul-2019 15:00:00 View
147 Pumping out of stagnated water from any location (both inside & outside Dock area) under N. S. Docks..-28-June-2019   28-Jun-2019 13:03:00 12-Jul-2019 15:00:00 View
148 Technical services covering planning, designing and supervision of construction..-27-June-2019
» CORRIGENDUM-I
» CORRIGENDUM-II
» Corrigendum-III
» ADDENDUM-IV
» CORRIGENDUM-V
» CORRIGENDUM-VI
27-Jun-2019 11:53:00 13-Sep-2019 14:00:00 View
149 Repair/Restoration of Under structure of Rabindra Setu between (H.P.14 to 17) damaged due to collision ...-27-June-2019   27-Jun-2019 12:59:00 19-Jul-2019 15:00:00 View
150 15 Nos Safety Sign Board for unmanned level crossing..-27-June-2019   27-Jun-2019 17:18:00 16-Jul-2019 15:00:00 View
151 Sinking of 50 mm dia Tube well with installation of 1 HP Submersible pump..-27-June-2019   27-Jun-2019 17:26:00 19-Jul-2019 15:00:00 View
152 Supply of one number lorry fitted with round shaped water tanker/ water tanks with pump for sprinkling..-25-June-2019   25-Jun-2019 11:47:00 17-Jul-2019 15:00:00 View
153 Petty miscellaneous building repairing works as may be necessary at Portland Park Campus..-24-June-2019   24-Jun-2019 16:55:00 17-Jul-2019 15:00:00 View
154 Miscellaneous building repair works and petty sanitary and plumbing works..-21-June-2019   21-Jun-2019 13:10:00 12-Jul-2019 14:00:00 View
155 Miscellaneous building repair works as may be necessary at Subhas Nagar, CISF Qtrs., Ramnagar..-20-June-2019
» CORRIGENDUM-I
20-Jun-2019 16:39:00 12-Jul-2019 14:00:00 View
156 Construction of boundary wall along with necessary gates from the East of Majherhat Bridge..-20-June-2019   20-Jun-2019 17:02:00 17-Jul-2019 15:00:00 View
157 Petty plumbing and sanitary works at Dock-1(West),Island workshop area..-19-June-2019   19-Jun-2019 12:14:00 09-Jul-2019 15:00:00 View
158 Detailed Soil Investigation report for the upgradation of Berth No.7 NSD, N. S Dock..-18-June-2019   18-Jun-2019 12:15:00 09-Jul-2019 15:00:00 View
159 Water proofing treatment to roofs of building nos and 10, 11, 12, 14, & 16 at Remount Road..-18-June-2019   18-Jun-2019 17:06:00 10-Jul-2019 14:00:00 View
160 Upkeepment and maintenance of office of the Superintending Engineer (KPD) including...-17-June-2019
» CORRIGENDUM-I
17-Jun-2019 15:03:00 09-Jul-2019 15:00:00 View
161 Cleaning drains under South Division and other ancillary works as and when required...-17-June-2019   17-Jun-2019 17:03:00 09-Jul-2019 15:00:00 View
162 Petty miscellanous repairs to sheds,buildings, goomties etc. at Dock-I(East) area, K.P. Dry Dock, lock entrance...-14-June-2019   14-Jun-2019 11:12:00 03-Jul-2019 15:00:00 View
163 Providindg services for general up-keepment of the Chief Engineer's Office, Office of..-14-June-2019   14-Jun-2019 11:32:00 05-Jul-2019 14:00:00 View
164 Displaying various board/signal/direction and symbols at inside K. P .Dock..-14-June-2019
» CORRIGENDUM-I
14-Jun-2019 14:13:00 09-Jul-2019 15:30:00 View
165 Construction of boundary wall at EJC yard as per ISPS specification & repairs to the existing ..-14-June-2019   14-Jun-2019 16:19:00 09-Jul-2019 15:00:00 View
166 Maintenance, day to day operation, and other ancillary works at Water Treatment Plant..-13-June-2019
» CORRIGENDUM-I
13-Jun-2019 12:19:00 05-Jul-2019 15:00:00 View
167 Miscellaneous Repairing works necessary for all working Jetties ..-12-June-2019   12-Jun-2019 15:36:00 04-Jul-2019 14:00:00 View
168 Flooring, wall panelling , painting (inside) and water proofing at CISF shed..-12-June-2019   12-Jun-2019 16:47:00 05-Jul-2019 15:00:00 View
169 Temporary Bamboo Walkway (XVIII) at Basin Complex of Shore Based Pilot Station, at Sagar Island..-11-June-2019   11-Jun-2019 11:38:00 02-Jul-2019 15:00:00 View
170 Operation and maintenance of Water Treatment plant...-11-June-2019
» CORRIGENDUM-I
11-Jun-2019 14:46:00 03-Jul-2019 14:00:00 View
171 InsideThorough renovation of quarter no.D/I and D/II of Nimak Mahal Officers Accomodation..-10-June-2019   10-Jun-2019 17:28:00 02-Jul-2019 15:00:00 View
172 Waterproofing treatment on the roof of Class-III & Class-IV staff quarters..07-June-2019   07-Jun-2019 13:28:00 28-Jun-2019 15:00:00 View
173 Restoration of damaged underground drainage system near CFS building..-07-June-2019   07-Jun-2019 14:41:00 28-Jun-2019 15:00:00 View
174 Consultancy service for strengthening of existing Project Monitoring Unit(PMU) of Kolkata Port Trust for procurement...-03-June-2019
» CORRIGENDUM-I
» Corrigendum-II
03-Jun-2019 10:40:00 06-Aug-2019 15:00:00 View
175 Upgrading of the two main entrance gates of Port Land Park..-31-May-2019
» CORRIGENDUM-I
31-May-2019 15:05:00 24-Jun-2019 15:00:00 View
176 Petty Plumbing and Sanitary works at No 8 Work shop and Nimak Mahal Officer Quarter..-31-May-2019   31-May-2019 15:44:00 19-Jun-2019 15:00:00 View
177 Provide service of labour at different area for emergency misc. work..-31-May-2019   31-May-2019 15:53:00 20-Jun-2019 15:00:00 View
178 Operation of fresh water Centrifugal pump at Nimak Mahal Officers Quarters Campus and Subhas Bhavan..-31-May-2019   31-May-2019 16:02:00 21-Jun-2019 15:00:00 View
179 Construction of RCC drawf wall at 13 & 14, NSD berth to prevent the spillage of coal..-30-May-2019   30-May-2019 11:48:00 20-Jun-2019 15:00:00 View
180 Cutting and trimming branches of trees etc. at inside N. S. Dock,Hydraulic Model Centre..-30-May-2019   30-May-2019 14:38:00 14-Jun-2019 15:00:00 View
181 Pumping out of stagnated water from any location (both inside & outside Dock area) under N.S.Docks..-30-May-2019   30-May-2019 14:55:00 14-Jun-2019 15:00:00 View
182 Relaying of damaged underground water supply pipe line from 2,NSD GRJ gate..-29-May-2019   29-May-2019 12:41:00 19-Jun-2019 15:00:00 View
183 Thorough repairs and renovation including plumbing & sanitary works..-29-May-2019
» CORRIGENDUM-I
» CORRIGENDUM-II
29-May-2019 12:57:00 20-Jun-2019 15:00:00 View
184 Thorough repair & renovation to both inside and outside of Toilet block..-29-May-2019
» CORRIGENDUM-I
29-May-2019 13:08:00 13-Jun-2019 15:00:00 View
185 Design, Engineering, Supply and Installation of water sprinkling system..-29-May-2019
» CORRIGENDUM-I
29-May-2019 15:55:00 04-Jul-2019 15:00:00 View
186 Through repairing of Gangra Tidal Station including sinking of 50 mm dia new tube well..24-May-2019   24-May-2019 11:32:00 17-Jun-2019 15:00:00 View
187 Construction of boundary wall of erstwhile Baghbazar Ware House at Baghbazar..-24-May-2019   24-May-2019 15:59:00 04-Jun-2019 15:00:00 View
188 Repairing of broken boundary wall, roof treatment including construction..-23-May-2019
» CORRIGENDA
23-May-2019 16:11:00 13-Jun-2019 15:00:00 View
189 Maintenance day to day operation, providing services of night time watch..-22-May-2019   22-May-2019 12:00:00 13-Jun-2019 15:00:00 View
190 Civil works including Plumbing and sanitary works and other ancilliary works..-22-May-2019
» CORRIGENDUM-I
» CORRIGENDUM-II
22-May-2019 14:54:00 29-May-2019 15:00:00 View
191 Petty miscellaneous repairs to sheds,buildings, goomties etc at Dock-I..-22-May-2019   22-May-2019 16:20:00 13-Jun-2019 15:00:00 View
192 Renewing of Sewer lines & construction of Septic tanks..-20-May-2019   20-May-2019 12:25:00 11-Jun-2019 15:00:00 View
193 Construction of chain link fencing around Kantapukur CISF Barrack..-17-May-2019   17-May-2019 13:20:00 11-Jun-2019 15:00:00 View
194 Construction of Toilet block for the convenience of the Mosque users ..-15-May-2019   15-May-2019 14:48:00 23-May-2019 15:00:00 View
195 Daily operation of Sluice Valve for supply of water from main overhead tank..-13-May-2019
» CORRIGENDUM
13-May-2019 11:40:00 30-May-2019 15:00:00 View
196 Maintenance of Garden at Dock Training Institute at 51 CGR road ..-10-May-2019
» CORRIGENDUM-I
10-May-2019 17:30:00 06-Jun-2019 15:00:00 View
197 Anti-termite treatment and Rodent Control works at KOPT Head Office building at 15, Strand Road ...-09-May-2019   09-May-2019 11:12:00 31-May-2019 15:00:00 View
198 Upkeepment and maintenance of the Engineering Accounts Wing at 1st Floor 6, Fairlie place, kolkata...-06-May-2019   06-May-2019 10:41:00 27-May-2019 15:00:00 View
199 Providing assistance for upkeepment of office premises of Superintending Engineer (N.S.D) at 51,C.G.R road, site office of Superintending Engineer (N.S.D) at no 8 work shop and site office near gate no.3 N.S.Dock...03-May-2019   03-May-2019 12:45:00 29-May-2019 15:00:00 View
200 Petty plumbing and sanitary works at Dock-1(East), Dry Dock area and C.M.M. Compound to Mooring Masters' Office, Tuktaghat, Fair Field area, Island workshop and Sr.Shipwright office...03-May-2019   03-May-2019 14:30:00 25-May-2019 15:00:00 View
201 Jungle cutting including Uprooting and Removing of Vegetation, Grass, Bushes...03-May-2019   03-May-2019 16:10:00 28-May-2019 15:00:00 View
202 Erection of barbed wire fencing along the river bank including repairing of boundary wall, security goomties and other miscellaneous works...30-April-2019   30-Apr-2019 12:10:00 22-May-2019 15:00:00 View
203 Pumping out of stagnated water from any location (both inside and outside Dock area) under K.P.Docks...30-April-2019   30-Apr-2019 14:05:00 22-May-2019 15:00:00 View
204 Jungle cutting including uprooting and removing vegetation,grass,bushes,etc.at Dock-I (East),Dock-II(East),Dry Dock,CMM Compound including Tuckta Ghat and Fairfield, Kantapukur CISF Barrack and Sister Nivedita Abasan,K.P.Docks...30-April-2019   30-Apr-2019 14:10:00 22-May-2019 15:00:00 View
205 Misc. petty repairs to sheds, different Goomty /Office Bldgs. Electrical Substations/ Transformer Rooms/Pump House/Workshops/Other Small Structures/ Boundary Wall/ Drain etc. at inside of entire N.S. Docks Area...29-April-2019   29-Apr-2019 17:05:00 21-May-2019 15:00:00 View
206 Repairing & improvement of existing drainage system from Subhas Bhaban to KMC main drain at the South side of C.G.R Road (N.S Dock) - 26-April-2019
» Corrigendum-I
26-Apr-2019 12:40:00 22-May-2019 15:00:00 View
207 Providing services for general upkeepment (Attendant and House Keepers ),maintenance and housekeeping etc. at the office of...-25-April-2019   25-Apr-2019 13:43:00 03-May-2019 15:00:00 View
208 Providing barbed wire fencing along the river front 3, 4 GRJ area including patrolling track..-25-April-2019   25-Apr-2019 15:31:00 21-May-2019 15:00:00 View
209 Thorough Renovation and Painting Work of DRM Office building,South Cabin Building, Driver & Technical Office Building..-24-April-2019   24-Apr-2019 12:50:00 14-May-2019 15:00:00 View
210 Thorough repair & renovation to both inside and outside of Toilet block near Canteen Building..-24-April-2019   24-Apr-2019 16:08:00 09-May-2019 15:00:00 View
211 Tender for repairs, replacement , maintenance of Bascule Bridge( Nazrul Setu) deck joint plates, structural members of bridge....-23-April-2019   23-Apr-2019 14:40:00 16-May-2019 15:00:00 View
212 E-TENDER for “Development of two wheeler parking area beside 4 & 3 NSD....-22-April-2019   22-Apr-2019 13:40:00 17-May-2019 15:00:00 View
213 Repairing and replacement of worn out damaged wooden decking planks...-22-April-2019   22-Apr-2019 13:50:00 17-May-2019 15:00:00 View
214 Repairs and Rehabilitation of Fairlie Warehouse (CRDC) KoPT at 6, Fairlie Place, Kolkata - 18-April-2019   18-Apr-2019 11:15:00 10-May-2019 15:00:00 View
215 Construction of 4NSD main gate at Netaji Subhas Dock including development of outside area of 4 NSD gate & rail gate,electrical works & other allied works...18-April-2019   18-Apr-2019 13:45:00 24-May-2019 15:00:00 View
216 Displaying various board/signal/direction and symbols at inside N.S Dock and other allied works at N.S Dock - 18-April-2019
» Corrigendum-I
18-Apr-2019 16:50:00 08-May-2019 15:00:00 View
217 Cleaning and disinfecting different types & size of drinking water tanks inside & outside dock under NSD section for one year from the date of work order - 17-April-2019   17-Apr-2019 12:30:00 30-Apr-2019 15:00:00 View
218 Thorough rehabilitation of bituminous carriageways of P N Banerjee Road & thorough repairing of Graham Road and other allied roads at Petroleum Wharves Budgebudge...17-April-2019   17-Apr-2019 14:42:00 08-May-2019 15:00:00 View
219 Periodical jungle cutting and removing of jungles at different areas of N.S. Dock for a period of one year...16-April-2019   16-Apr-2019 15:50:00 30-Apr-2019 15:00:00 View
220 Repairing/ modification of boundary wall of Hydraulic Model Centre and other allied works - 16-April-2019
» Corrigendum-I
16-Apr-2019 16:55:00 17-May-2019 15:00:00 View
221 Restoration of dislocated gravity fenders along with thorough repair of KoPT RCC Jetty at Raichak - 16-April-2019   16-Apr-2019 17:05:00 09-May-2019 15:00:00 View
222 Construction of Paver Block road from 10 no. NSD to Gate to 11 no. NSD Gate including improvement of drainage system, N.S. Dock - 12-April-2019   12-Apr-2019 11:30:00 03-May-2019 15:00:00 View
223 Cleaning of existing drain including repairs the minor damaged portion along the sick line road, Dhobitola road, C.G.R. road , G R Road...12-April-2019   12-Apr-2019 11:40:00 03-May-2019 15:00:00 View
224 Levelling and dressing of the area of NTWC with moorum topping, providing concertina over boundary wall, construction of a septic tank and other allied works...11-April-2019   11-Apr-2019 14:45:00 18-Apr-2019 15:00:00 View
225 Periodical jungle cutting and removing of jungles at different areas of N.S. Dock...28-Mar-2019
» Tender Cancellation Corrigendum Notice
28-Mar-2019 12:02:00 Tender has been Terminated View
226 Preparation of Waste Management Plan for Kolkata Dock System and Haldia Dock Complex of Kolkata Port Trust - 27-Mar-2019   27-Mar-2019 13:20:00 22-Apr-2019 15:30:00 View
227 Fulfilling requirement of seeds (flowers and vegetables ) manures and fertilizers, insecticides and pesticides, and maintenance of gardenining works...25-Mar-2019   25-Mar-2019 11:50:00 03-Apr-2019 15:00:00 View
228 Supplying of daily labourers for miscellaneous non-measurable works and pumping services...25-Mar-2019   25-Mar-2019 12:20:00 17-Apr-2019 15:00:00 View
229 Cleaning & Disinfection of Underground Vats. Overhead Fresh Water Tanks at Head Office Building...18-Mar-2019   18-Mar-2019 15:40:00 09-Apr-2019 15:00:00 View
230 Providing water proofing treatment for roofs of building nos. 4 & 12, 9, 17B, 15A, 11A & 19A at Port Land Park Campus including...07-Mar-2019   07-Mar-2019 10:30:00 27-Mar-2019 15:00:00 View
231 Design, Engineering, Supply and Installation of water sprinkling system including supervision, operation and maintenance period of one year for dust suppression of coal stock piles at Coal berth area of K.P.Docks...06-Mar-2019
» Corrigendum-I
06-Mar-2019 14:10:00 11-Apr-2019 15:00:00 View
232 Fencing Surrounding the Effluent Treatment Plant at Centenary Hospital...06-Mar-2019   06-Mar-2019 16:10:00 26-Mar-2019 15:00:00 View
233 Design, fabricate, supply , test and deliver of one no. Main Pontoon of size 30.0M x 9.25M x 1.60M (average depth) fitted with all fittings, fixtures and fenders all complete at approved location at Kolkata Dock System or at Bdge Budge Moorings and one no. for Diamond Harbour Jetty - 27-Feb-2019
» Corrigendum-I
» Corrigendum-II
» Corrigendum-III
» Corrigendum-IV
» Corrigendum-V
27-Feb-2019 16:20:00 29-Apr-2019 15:00:00 View
234 Providing water proofing treatment for roofs of building...25-Feb-2019
» Corrigendum-I
25-Feb-2019 10:25:00 13-Mar-2019 15:00:00 View
235 Petty Miscellaneous repairing works and other ancillary works including Jungle cutting at Sector - 1 to 5 and New Taratala colony as and when required at Taratala qtrs complex...21-Feb-2019   21-Feb-2019 11:50:00 15-Mar-2019 15:00:00 View
236 Petty Plumbing & Sanitary works of Subhas Bhaban, P65, PSO Complex, Loco Shed, CGR area, Hydraulic Model Centre under N.S. Dock for one year from the date of work order - 20-Feb-2019   20-Feb-2019 11:25:00 14-Mar-2019 15:00:00 View
237 Through renovation (outside & inside) of Hi-fix building and main building of H.S.D. including renovation of adjoining structure and boundary wall and including plumbing works at N.S.Dock - 20-Feb-2019   20-Feb-2019 13:10:00 13-Mar-2019 15:00:00 View
238 Providing services for upkeepment of office premises of Superintending Engineer (Civil)...18-Feb-2019   18-Feb-2019 12:15:00 12-Mar-2019 15:00:00 View
239 Repair & painting for RCC Overhead water reservoirs at CMM Compound, K.P Docks under action plan for Swachh Bharat...18-Feb-2019   18-Feb-2019 17:28:00 08-Mar-2019 15:00:00 View
240 Mowing Lawns, Jungle Cutting and Trimming Branches of Trees...13-Feb-2019   15-Feb-2019 12:00:00 01-Mar-2019 15:00:00 View
241 Petty miscellaneous Civil works to Head Office main building, Annexe Building, New Per-audit building, Dispensary, Co-operative Credit Society. Tiffin Club...15-Feb-2019   15-Feb-2019 15:00:00 12-Mar-2019 15:00:00 View
242 Petty Miscellaneous repairing works at Centenary Hospital, Hospital Park Quarters, CISF Guest House, DRM office...14-Feb-2019
» Corrigendum-I
14-Feb-2019 12:10:00 07-Mar-2019 15:00:00 View
243 Construction of proposed Toilet Blocks at Ground Floor and 1st Floor of NPPS - 14-Feb-2019
» Corrigendum
14-Feb-2019 17:15:00 11-Mar-2019 15:00:00 View
244 Regradation of depressed level (low cost) at back side of shed no - 4,6,8 & 10 at Dock-I (W) KPD using old bricks available from N.S.Docks and other ancillary works - 13-Feb-2019   13-Feb-2019 11:12:00 07-Mar-2019 15:00:00 View
245 Petty works at Rabindra Setu deck, approach footpath including flyover & Rabindra Setu Office, Rabindra Setu Traffic Guard Office, etc. as and when necessary for a period of ONE year from the date of placement of work order - 13-Feb-2019   13-Feb-2019 12:40:00 05-Mar-2019 15:00:00 View
246 Modification of existing PF Office in connection with proposed Accounts Office at 1st Floor of Fairlie Warehouse Bay No.08 - 13-Feb-2019   13-Feb-2019 13:00:00 07-Mar-2019 15:00:00 View
247 Providing services for upkeepment of office premises of Superintending Engineer (Env) at gate No 3 , KP Docks for 02(two) years...12-Feb-2019   12-Feb-2019 14:50:00 05-Mar-2019 15:00:00 View
248 Construction of 4NSD main gate at Netaji Subhas Dock including development of outside area of 4 NSD gate & rail gate,electrical works & other allied works...08-Feb-2019   08-Feb-2019 11:00:00 28-Feb-2019 15:00:00 View
249 New Construction of Three (3) number of CISF Room And repairing CISF watch tower at EJC yard - 01-Feb-2019   01-Feb-2019 12:52:00 26-Feb-2019 15:00:00 View
250 Roof Treatment by APP Membrane at Flat Roofs of Shed No. 22, 23 & 24 at KPD Dock - II - 01-Feb-2019
» Corrigendum-I
01-Feb-2019 13:50:00 08-Feb-2019 15:00:00 View
251 Construction of a new two storied Building for Crew's shelter near Lock Entrance including other allied works, N.S. Docks...01-Feb-2019
» Corrigendum-I
01-Feb-2019 15:40:00 08-Mar-2019 15:00:00 View
252 Spreading, Levelling & Rolling of rubbish stacked in between main road...30-Jan-2019
» Corrigendum-I
30-Jan-2019 15:00:00 20-Feb-2019 15:00:00 View
253 Repair /maintenance work of paver block yards/roads/berth...29-Jan-2019   29-Jan-2019 13:15:00 26-Feb-2019 15:00:00 View
254 Petty Plumbing and sanitary works to KOPT Guest at 93, Chowringhee Road...28-Jan-2019
» Corrigendum
28-Jan-2019 10:56:00 19-Feb-2019 15:00:00 View
255 Providing services for general upkeepment (Attendant and House Keepers ), maintenance and housekeeping...24-Jan-2019   24-Jan-2019 13:20:00 01-Feb-2019 15:00:00 View
256 Preparation of Waste Management Plan for Kolkata Dock System and Haldia Dock Complex...24-Jan-2019
» Corrigendum-I
24-Jan-2019 16:00:00 20-Feb-2019 15:30:00 View
257 Miscellaneous repairs/maintenance of damaged portion of Brace Bridge...22-Jan-2019   22-Jan-2019 15:08:00 19-Feb-2019 15:00:00 View
258 Petty plumbing and sanitary works within KoPT Head Office premises at 15, Strand Road...22-Jan-2019   22-Jan-2019 17:15:00 15-Feb-2019 15:00:00 View
259 False ceiling and renovation of M.S Room, replacement of existing defective Rimless Glass...11-Jan-2019   11-Jan-2019 13:05:00 07-Feb-2019 15:00:00 View
260 Repairing and replacement of worn out damaged wooden decking planks and steel works including painting of all the structural members of Man Of War Jetty - 09-Jan-2019   09-Jan-2019 15:55:00 07-Feb-2019 15:00:00 View
261 Water proofing treatment on roofs including sealing of expansion joints at different floor levels of Centenary Hospital and other buildings...04-Jan-2019
» Corrigendum - I
04-Jan-2019 15:20:00 29-Jan-2019 15:00:00 View
262 Construction of proposed Toilet Blocks at Ground Floor and 1st Floor of NPPS - 04-Jan-2019
» Corrigendum
04-Jan-2019 16:02:00 29-Jan-2019 15:00:00 View
263 Roof treatment with APP membrane at URS Station, Budgebudge - 04-Jan-2019   04-Jan-2019 16:34:00 28-Jan-2019 15:00:00 View
264 Works related to Swatch Bharat Abhijan at KoPT Centenary Hospital premises - 02-Jan-2018   02-Jan-2019 16:20:00 29-Jan-2019 15:00:00 View
265 Maintenance of Slab Seal Type Deck Joints of Brabourne Road Flyover including replacement of damaged units...26-Dec-2018   26-Dec-2018 17:18:00 17-Jan-2019 15:00:00 View
266 Construction of a new two storied Building for Crew's shelter near Lock Entrance including other allied works, N.S. Docks - 26-Dec-2018
» Corrigendum
26-Dec-2018 17:25:00 15-Jan-2019 15:00:00 View
267 Part - A Petty plumbing works as may be necessary at Taratala Colony under use for a period of one year and Part-B Annual removal of chokage of sanitary fittings at Taratala KoPT colony under use for a period of one year - 18-Dec-2018   18-Dec-2018 12:25:00 07-Jan-2019 15:30:00 View
268 Waterproofing treatment work by APP modified prefabricated water proofing membrane to the roof of Dock master office..17-Dec-2018   17-Dec-2018 11:45:00 08-Jan-2019 15:00:00 View
269 Repair and renovation to the outside and inside of shed no. 24 including surrounding drains and depressed surface area at K.P. Dock-II - 14-Dec-2018   14-Dec-2018 12:10:00 03-Jan-2019 15:00:00 View
270 Part A False ceiling and renovation of M.S Room, replacement of existing defective Rimless Glass Door...14-Dec-2018   14-Dec-2018 16:00:00 08-Jan-2019 15:00:00 View
271 Repairs and Rehabilitation of Fairlie Warehouse (CRDC) KoPT at 6, Fairlie Place, Kolkata...10-Dec-2018   10-Dec-2018 13:45:00 03-Jan-2019 15:00:00 View
272 Repair & painting for RCC Overhead water reservisor at CMM Compound, K.P Docks under action plan for Swachh Bharat - 10-Dec-2018   10-Dec-2018 10:10:00 27-Dec-2018 15:00:00 View
273 Development of green verge including plantation of trees along boundary wall of ETC agro just opposite to shed 29, 28 at Dock-II - 07-Dec-2018   07-Dec-2018 12:55:00 27-Dec-2018 15:00:00 View
274 Provision of false ceiling and other miscellaneous works at required area of barrack shed inside CISF parade ground at Kantapukur...06-Dec-2018
» Corrigendum - 1
06-Dec-2018 11:01:00 27-Dec-2018 15:00:00 View
275 Water proofing treatment to the roof of KOPT Head Office old building, canteen and adjoining small roof...04-Dec-2018   04-Dec-2018 12:15:00 31-Dec-2018 15:00:00 View
276 Sinking of Tube Well (50 mm x 100 mm dia) at DRM office (EJC Yard) and some other ancillary works - 04-Dec-2018   04-Dec-2018 13:45:00 24-Dec-2018 15:00:00 View
277 Proposed boundary wall at play ground, including dismantling of existing wall at Taratala Colony - 30-Nov-2018   30-Nov-2018 14:36:00 28-Dec-2018 15:00:00 View
278 Periodical Slot marking and Crane track marking work for proper Yard Management for one year from the date of placement of Work Order, N. S. Dock - 30-Nov-2018   30-Nov-2018 16:00:00 28-Dec-2018 15:00:00 View
279 Thorough inside repairs and renovation works including sanitary & plumbing works for official residence...29-Nov-2018
» Corrigendum
29-Nov-2018 15:30:00 10-Dec-2018 15:30:00 View
280 Petty Miscellaneous Works along with Petty Plumbing and Sanitary Works to NHBQ Class-III & IV Staff Quarters...27-Nov-2018
» Corrigenda-II
27-Nov-2018 14:50:00 27-Dec-2018 15:00:00 View
281 Repairing and replacement of worn out damaged wooden decking planks and steel works including painting...22-Nov-2018   22-Nov-2018 11:58:00 18-Dec-2018 15:00:00 View
282 Periodical maintenance work of different road including inside Dock...20-Nov-2018
» Corrigendum-I
20-Nov-2018 13:07:00 18-Dec-2018 15:00:00 View
283 Providing services for general upkeepment (Attendant and House Keepers ), maintenance and housekeeping etc. at the office of the Ground Floor of the Chairman's Bungalow...20-Nov-2018   20-Nov-2018 16:34:00 19-Dec-2018 15:00:00 View
284 Thorough renovation of Chairman and Dy. Chairman’s Enclosures at 3rd Floor of Subhas Bhaban...16-Nov-18   16-Nov-2018 10:40:00 06-Dec-2018 15:00:00 View
285 Maintenance of existing landscape and garden of KoPT Centenary Hospital at Majerhat..13-Nov-18   13-Nov-2018 15:10:00 12-Dec-2018 15:00:00 View
286 Providing upkeepment and maintenance of the office under Superintending Engineer(Rly)...13-Nov-18   13-Nov-2018 15:15:00 12-Dec-2018 15:00:00 View
287 Development of container stacking yard at 3 NSD Shed area and adjacent green verge area...08-Nov-2018   08-Nov-2018 10:55:00 29-Nov-2018 15:00:00 View
288 Providing services of unskilled labour to assist the Chief Engineer's Office at KOPT Head Office...07-Nov-2018   07-Nov-2018 13:04:00 29-Nov-2018 15:00:00 View
289 Construction of raised pathway between 3 NSD gate and Masjid...02-Nov-2018   02-Nov-2018 15:00:00 28-Nov-2018 15:00:00 View
290 Renovation of East Yard Mess near gate no 5, KPD...02-Nov-2018   02-Nov-2018 14:50:00 27-Nov-2018 15:00:00 View
291 Petty plumbing works as may be necessary at Taratala Colony...01-Nov-2018
» Corrigendum
01-Nov-2018 15:50:00 01-Dec-2018 15:30:00 View
292 Miscellaneous conservancy upkeepment works at Portland Park Quarters' premises...23-Oct-2018
» Corrigendum-I
23-Oct-2018 16:45:00 02-Nov-2018 15:00:00 View
293 Development of area between 1 CPY & Reefer Park area & adjoining green verge area for Container Parking Yard including...11-Oct-2018
» Corrigendum-I
11-Oct-2018 14:00:00 30-Oct-2018 15:00:00 View
294 Temporary patch repairing and cleaning to the ground floor...10-Oct-2018   10-Oct-2018 16:35:00 30-Oct-2018 15:00:00 View
295 Cleaning and disinfecting different types & size of drinking water tanks inside & outside dock under NSD section...05-Oct-2018   05-Oct-2018 16:39:00 26-Oct-2018 15:00:00 View
296 Petty Miscellaneous works to KoPT Offices at Kolkata Jetty (including Workshop), Fairlie Warehouse, Hillary Institute, Toll collection Office...04-Oct-2018
» Corrigendum
04-Oct-2018 11:00:00 29-Oct-2018 15:00:00 View
297 Supplying drinking water at different places by Water Tanker under N.S.Dock Section including Dock Labour Board...03-Oct-2018
» Corrigendum-I
» Corrigendum-II
03-Oct-2018 12:35:00 30-Oct-2018 15:00:00 View
298 Demolition of old building (Canteen) behind block No. 9 & old ComputerBooth...03-Oct-2018   03-Oct-2018 17:08:00 15-Oct-2018 15:00:00 View
299 Through renovation and face lifting of both outside & inside of office building...01-Oct-2018
» Corrigendum-I
» Corrigendum-II
01-Oct-2018 15:59:00 31-Oct-2018 15:00:00 View
300 Allied Civil works for installation of Mobile XRay Container Scanning System consisting of...27-Sept-2018
» Corrigendum-I
27-Sep-2018 13:12:00 26-Oct-2018 15:00:00 View
301 Thorough repairing of bituminous carriageways of P N Banerjee Road...25-Sept-2018
» Corrigendum-I
25-Sep-2018 12:45:00 26-Oct-2018 15:00:00 View
302 Reconstruction of JJP road leading to the premises of M/s. Century Ply...24-Sept-2018
» Corrigendum-I
24-Sep-2018 12:11:00 12-Oct-2018 15:00:00 View
303 Repairs and Rehabilitation of Fairlie Warehouse (CRDC) KoPT at 6, Fairlie Place...24-Sept-2018
» Corrigendum-I
24-Sep-2018 12:35:00 12-Oct-2018 15:00:00 View
304 Urgent repairing of damaged Jetty No:-1 at Petroleum Wharves Budgebudge...20-Sept-2018
» Corrigendum
20-Sep-2018 10:45:00 27-Sep-2018 15:30:00 View
305 Providing supporting staff for operating of Coal Dock Road parking yard...20-Sept-2018
» Corrigendum-I
» Corrigendum-II
20-Sep-2018 13:40:00 26-Oct-2018 15:00:00 View
306 Thorough repairing and up-gradation of Jetty approch road from KOPT main gate...19-Sept-2018
» Corrigendum-I
» Corrigendum-II
19-Sep-2018 15:44:00 23-Oct-2018 15:00:00 View
307 Renoavtion of East Yard Mess near gate no 5, KPD presently occupied by PSO personnel - 19-Sept-2018
» Corrigendum-I
» Corrigendum-II
19-Sep-2018 15:45:00 23-Oct-2018 15:00:00 View
308 Preparation of Waste Management Plan for Kolkata Dock System and Haldia Dock Complex...14-Sept-2018
» Corrigendum-I
» Corrigendum - II
14-Sep-2018 16:48:00 26-Oct-2018 15:30:00 View
309 Safe demolition of one 20-25 metre high (approx.) 50,000 Gallon (approx) capacity dilapidated overhead RCC Water Tank...13-Sept-2018   13-Sep-2018 15:24:00 27-Sep-2018 15:30:00 View
310 Miscellaneous conservancy upkeepment works at Dumyane Avenue qrts. Premises, Nimak Mahal Qrts. Premises...12-Sept-2018
» Corrigendum-I
» Corrigendum-II
12-Sep-2018 10:42:00 27-Sep-2018 15:00:00 View
311 Fencing of 3 Vacant Plots (2, 4 & 21) at Dhobitala Container Park, which are presently under the possession of KoPT - 12-Sept-2018
» Corrigendum - I
» Corrigendum-II
» Corrigendum-III
12-Sep-2018 13:12:00 11-Oct-2018 15:00:00 View
312 Rodent Control Treatment of all sheds at Dock-I (East &West) and Dock-II except shed No.11...11-Sept-2018
» Corrigendum-I
» Corrigendum-II
» Corrigendum-III
11-Sep-2018 15:10:00 11-Oct-2018 15:00:00 View
313 Repair/Renovation of Outram Ghat Jetty No. 2 for creation of common user tourism facility..10-Sept-2018   10-Sep-2018 13:30:00 03-Oct-2018 15:00:00 View
314 Emergency repair of damaged stretch of Hide Road starting from approach of Brace Bridge...07-Sept-2018   07-Sep-2018 13:10:00 11-Sep-2018 15:30:00 View
315 Cleaning of jungles,dressing of yard etc. at the operational areas of EJC yard from Majherhat to Sondingi...29-Aug-2018
» Corrigendum
29-Aug-2018 16:51:00 17-Sep-2018 15:30:00 View
316 Installation of 2 nos Steel Gates at Saheb Bazar Godown, Fixing of 1 no. Collapsable Gate at Maidan Tent...13-Aug-2018   13-Aug-2018 10:08:00 22-Aug-2018 15:00:00 View
317 Thorough inside repairs and renovation works including providing false ceiling works...13-Aug-2018   13-Aug-2018 12:40:00 30-Aug-2018 15:30:00 View
318 Providing Fire Safety measures at the Kitchen, Gas Bank and other allied areas...10-Aug-2018   10-Aug-2018 11:39:00 30-Aug-2018 15:30:00 View
319 Sinking of 50 mm x 100 mm Dia. Tube Well with installation of 1 HP Submersible Pump with motor set and allied works...10-Aug-2018   10-Aug-2018 11:42:00 31-Aug-2018 15:00:00 View
320 Through inside and outside repairs and renovation works including sanitary & plumbing works...08-Aug-2018   08-Aug-2018 14:30:00 20-Aug-2018 15:30:00 View
321 Development scheme for revamping of drainage system & leveling of depressed area of berths & alley roads from Shed No. 22 to Shed No. 26 with a paved single lane road...08-Aug-2018
» Corrigendum-I
08-Aug-2018 11:55:00 31-Aug-2018 15:30:00 View
322 Thorough renovation including interior decoration, plumbing & sanitary works, landscaping works, electrification, air-conditioning & fire alarm & detection system at Kolkata Port Trust Guest House...07-Aug-2018
» Corrigendum-I
» Corrigendum - II
» Corrigendum-III
» Corrigendum-IV
» Corrigendum-V
07-Aug-2018 12:20:00 04-Sep-2018 15:30:00 View
323 Repairing / restoration of boundary wall and main gate of new colony including construction of dustbin - 03-Aug-2018   03-Aug-2018 15:50:00 28-Aug-2018 15:30:00 View
324 Removal of refuse, garbage etc from the different offices, residential colonies of KoPT...31-July-2018   31-Jul-2018 11:20:00 23-Aug-2018 15:30:00 View
325 Thorough inside repairs and renovation works including sanitary & plumbing works...27-July-2018   27-Jul-2018 10:30:00 16-Aug-2018 15:30:00 View
326 Selection of a Consultant for Preparation of Detailed Project Report...27-July-2018
» Corrigendum-I
» Corrigendum-II
» Corrigendum-III
» Corrigendum-IV
» Corrigendum-V
» Corrigendum-VI
» Tender notice dated 31.10.2018
27-Jul-2018 16:50:00 01-Nov-2018 15:00:00 View
327 Design, fabricate, supply , test and deliver at approved location at Kolkata Dock System or at Budge Budge Moorings one no. Main Pontoon of size 30.0M x 9.25M x 1.60M (average depth) fitted with all fittings, fixtures and fenders...25-July-2018   25-Jul-2018 16:00:00 17-Aug-2018 15:30:00 View
328 Construction of Septic Tank and other plumbing and sanitary works at South Cabin (EJC Yard) - 16-July-2018   16-Jul-2018 16:30:00 02-Aug-2018 15:00:00 View
329 Replacement of 20 Ton C.I. Stag Horn Bollards & MS Bull Rings at Different Locations of K.P.Dock - 11-July-2018   11-Jul-2018 12:45:00 07-Aug-2018 15:30:00 View
330 Water proofing treatment to the roof of offices of Sr. Shipwright, Dry Dock Supdt., Supdt. Dock - I (East), Environment, Impounding Pump House...11-July-2018   11-Jul-2018 12:56:00 07-Aug-2018 15:30:00 View
331 Supply of earthmovers/ mechanical excavator on hire , cutting jungles , supply of unskilled labourers and other related works for dressing / levelling...10-July-2018
» Corrigendum
10-Jul-2018 15:24:00 01-Aug-2018 15:30:00 View
332 Through inside and outside repairs and renovation works including sanitary & plumbing works, changing of structural framework and trusses...09-July-2018
» Corrigendum-I
09-Jul-2018 13:20:00 03-Aug-2018 15:30:00 View
333 Temporary approach walkway from Aaila Embankment to Tidal Observatory of shore based Pilot Station...9-July-2018   09-Jul-2018 14:25:00 23-Jul-2018 15:30:00 View
334 Supply of earthmovers/ mechanical excavator on hire , cutting jungles , supply of unskilled labourers and other related works...06-July-2018
» Corrigendum
06-Jul-2018 10:00:00 18-Jul-2018 15:30:00 View
335 Supply of earthmovers/ mechanical excavator on hire , cutting jungles , supply of unskilled labourers and other related works for dressing / levelling etc...06-July-2018
» Corrigendum
06-Jul-2018 10:15:00 18-Jul-2018 15:30:00 View
336 Petty Miscellaneous repairing works within Petroleum Wharf area at Budge Budge, Roychak Stn. Building, Akra, Moyapur Semaphore at Moyapur...06-07-2018   06-Jul-2018 17:00:00 30-Jul-2018 15:00:00 View
337 Cleaning of drains at N.S. Dock including Alifnagar Crews' Qtrs...05-July-2018   05-Jul-2018 15:38:00 30-Jul-2018 15:30:00 View
338 Weedicide treatment along with Jungle Cutting in and around Petroleum Wharf area of Budge Budge (PWBB) including the area beyond No. 8 Jetty up to...04-July-2018   04-Jul-2018 16:45:00 24-Jul-2018 15:30:00 View
339 Levellng and strengthening of South side of main road starting from 2 NSD GRJ gate to clock tower with improvement of drainage system for parking yard - 03-July-2018   03-Jul-2018 11:51:00 27-Jul-2018 15:30:00 View
340 Providing fencing including repairing of existing boundary wall...03-July-2018   03-Jul-2018 17:17:00 16-Jul-2018 15:30:00 View
341 Construction of sewerage system by laying of new S.W. Pipeline, Inspection Pit to maintain proper hygienic environment at Chetla KoPT Quarters - 03-July-2018   03-Jul-2018 17:20:00 16-Jul-2018 15:30:00 View
342 Construction of a clay tennis court including fencing at Kantapukur CISF Barrack - 02-July-2018   02-Jul-2018 15:47:00 26-Jul-2018 15:30:00 View
343 Petty repairs of different roads of South Division to maintain the roads in a motorable condition...29-June-2018
» Corrigendum
» Corrigendum-II
29-Jun-2018 10:25:00 17-Jul-2018 15:30:00 View
344 Thorough repairing of one number steel pontoon at Petroleum Wharves Budgebudge - 29-June-2018
» Corrigendum-I
29-Jun-2018 11:15:00 26-Jul-2018 15:30:00 View
345 Design , fabricate, supply, test, and deliver at approved location at Kolkata Dock System or at Budge Budge Moorings one no. Main Pontoon of size 30.00m X 9.25m X 1.60m.(average depth) fitted with all fittings, fixtures and rubber fender...27-June-2018
» Corrigendum-I
27-Jun-2018 12:40:00 20-Jul-2018 15:30:00 View
346 Supply of Daily labours at various sites under Kolkata Section for carrying out miscellaneous work...27-June-2018   27-Jun-2018 14:54:00 19-Jul-2018 15:30:00 View
347 Construction of Toilet block and rest shed at M & Q Truck Parking Yard...26-June-2018
» Corrigendum-I
» Corrigendum-II
26-Jun-2018 12:09:00 17-Jul-2018 15:30:00 View
348 Removal of refuse, garbage etc from the different offices, residential colonies of KoPT...26-June-2018
» Corrigendum-I
» Corrigendum-II
26-Jun-2018 12:21:00 17-Jul-2018 15:30:00 View
349 Misc. petty repairs at Nimak Mahal Quarters, Hydraulic Model Center, PSO Office Complex...21-June-2018   21-Jun-2018 16:55:00 18-Jul-2018 15:30:00 View
350 Fencing of two vacant plots (6-7-8 & 12) at Dhobitala Container Parking Area...20-June-2018   20-Jun-2018 10:45:00 06-Jul-2018 10:48:00 View
351 Development of Container Stacking Yard(Refer Park) at opposite of Shed no. 6 Dumayune Avenue...18-June-2018
» Corrigendum - I
» Corrigendum-II
18-Jun-2018 12:10:00 03-Jul-2018 15:30:00 View
352 Design, fabricate, supply , test and deliver at approved location at Kolkata Dock System...18-June-2018
» Corrigendum-I
18-Jun-2018 16:58:00 10-Jul-2018 15:30:00 View
353 Operation & maintenance of Water Treatment Plant at inside N.S. Dock near 4 NSD Gate...15-June-2018
» Corrigendum-I
15-Jun-2018 17:04:00 06-Jul-2018 15:30:00 View
354 Procurement of Furnitures at Estate Division, KDS in connection with contriving Office space...13-June-2018
» Tender Document
» Corrigendum - I
13-Jun-2018 16:40:00 25-Jun-2018 15:00:00 View
355 Reconstruction of Bay No. 4 & 5 of the CPY including reconstruction of damaged portions of Bay No. 1 CPY(excluding rail line portion) and other allied works...12-June-2018
» Corrigendum-I
» Corrigendum-II
12-Jun-2018 11:40:00 06-Jul-2018 15:30:00 View
356 Temporary Bamboo Walkway (XVII) at Basin Complex of Shore Based Pilot Station, at Sagar Island...11-June-2018
» Corrigendum-I
11-Jun-2018 12:45:00 06-Jul-2018 15:30:00 View
357 Providing fencing including repairing of existing boundary wall...06-June-2018   06-Jun-2018 16:27:00 18-Jun-2018 15:30:00 View
358 Providing assistance for upkeepment of office premises of Superintending Engineer...05-June-2018
» Corrigendum
05-Jun-2018 10:00:00 29-Jun-2018 15:30:00 View
359 Facelifting and Renovation of CVO's cabin excluding Toilet...05-June-2018   05-Jun-2018 17:00:00 12-Jun-2018 15:00:00 View
360 Supply of earthmovers/ mechanical excavator on hire , cutting jungles , supply of unskilled labourers...04-June-2018   04-Jun-2018 10:59:00 11-Jun-2018 15:30:00 View
361 Laying of new pipe line (underground ) to replace the old dilapilated worn out pipeline from bottom of water tank...04-June-218   04-Jun-2018 13:00:00 26-Jun-2018 15:30:00 View
362 Petty repairs of different roads of South Division to maintain the roads in a motorable condition...04-June-2018   04-Jun-2018 14:15:00 26-Jun-2018 15:30:00 View
363 Thorough repair and renovation to Hydraulic Power Station Toilet block...30-May-2018   30-May-2018 12:30:00 26-Jun-2018 15:30:00 View
364 Operation of fresh water centrifugal pump at Nimak Mahal Officers Qtrs. Campus...30-May-2018   30-May-2018 12:43:00 15-Jun-2018 15:30:00 View
365 Renovation/repairing/painting of the boundary wall including leveling and dressing of the area of NIWC...25-May-2018
» Corrigendum-I
25-May-2018 11:56:00 01-Jun-2018 15:30:00 View
366 Fencing of two vacant plots (6-7-8 and 12) at Dhobitala Container Parking Area...25-May-2018   25-May-2018 16:52:00 15-Jun-2018 15:30:00 View
367 Upgradation work including repainting of the entire quarter...22-May-2018
» Corrigendum-I
22-May-2018 10:17:00 05-Jun-2018 15:30:00 View
368 Construction of a clay tennis court including fencing...21-May-2018   21-May-2018 11:08:00 15-Jun-2018 15:30:00 View
369 Repairing & restoration of damaged road side drain at Dock-I (West) from Berth No. 2 KPD ...14-May-2018
» Corrigendum-II
18-May-2018 09:30:00 07-Jun-2018 14:00:00 View
370 Replacement of 20 Ton C.I. Stag Horn Bollards and MS Bull Rings...18-May-2018
» Corrigendum-I
18-May-2018 15:52:00 08-Jun-2018 15:30:00 View
371 Development of Garden at front area of Subhas Bhaban and Car Parking area...17-May-2018
» Corrigendum-I
17-May-2018 10:58:00 08-Jun-2018 15:30:00 View
372 Cleaning, desilting and disposal of silt, spoils etc. from drains outsides of docks...17-May-2018   17-May-2018 15:54:00 19-Jun-2018 15:30:00 View
373 Petty Miscellaneous works to KoPT Guest House (Both Old and New) and Officers club Building...14-May-2018   16-May-2018 09:30:00 06-Jun-2018 15:30:00 View
374 Development work for container stacking yard...16-May-2018   16-May-2018 10:50:00 07-Jun-2018 15:30:00 View
375 Facelifting and repairing of Shed No. 1, 5, 7, Nepal Godown...16-May-2018   16-May-2018 10:55:00 07-Jun-2018 15:30:00 View
376 Revamping of drainage system and leveling of depressed area...16-May-2018   16-May-2018 10:58:00 07-Jun-2018 15:30:00 View
377 Periodical jungle cutting, dressing, cleaning Water Hyacinth...15-May-2018   15-May-2018 10:43:00 08-Jun-2018 15:30:00 View
378 Repairing and reconstruction of damaged broken Boundary Wall...15-May-2018
» Corrigendum
15-May-2018 15:29:00 25-May-2018 15:30:00 View
379 Modification and renovation (as per revised plan) of Customs Building near gate no. 7 NSD...14-May-2018
» Corrigendum-I
14-May-2018 15:30:00 05-Jun-2018 15:30:00 View
380 Cleaning underground and above ground filter water reservoir at Centenary Hospital...14-May-2018
» Tender Document
» Corrigendum
» Corrigendum-II
14-May-2018 15:45:00 03-Jul-2018 15:00:00 View
381 Temporary Bamboo Walkway (XVII) at Basin Complex of Shore Based Pilot Station...11-May-2018   11-May-2018 10:42:00 05-Jun-2018 15:30:00 View
382 Cleaning of silt including removing of left over materials, Garbage mixed with rubbish and all other filthy materials...11-May-2018   11-May-2018 13:45:00 05-Jun-2018 15:30:00 View
383 Erection of additional fencing over the existing railing on both sides of Rabindra Setu...10-May-2018
» Corrigendum-I
10-May-2018 11:18:00 07-Jun-2018 15:30:00 View
384 Improvement of drainage system along main road...10-May-2018
» Corrigendum-I
» Corrigendum - II
10-May-2018 14:50:00 07-Jun-2018 15:30:00 View
385 Repairing & restoration of damaged road side drain...10-May-2018
» Corrigendum-I
10-May-2018 14:50:00 07-Jun-2018 15:30:00 View
386 Construction of Septic Tank and other plumbing and sanitary works...10-May-2018   10-May-2018 16:54:00 22-May-2018 15:00:00 View
387 Miscellaneous building , plumbing and sanitary repair works...08-May-2018   08-May-2018 10:30:00 29-May-2018 15:30:00 View
388 Upgradation work including repainting of the entire quarter...08-May-2018   08-May-2018 10:35:00 19-May-2018 15:30:00 View
389 One no. Main Pontoon of size 30.00m X 9.25m X 1.60m.(average depth) fitted with all fittings ...08-May-2018   08-May-2018 17:28:00 24-May-2018 15:30:00 View
390 Cutting and trimming branches of trees,etc.at Dock-I...04-May-2018   04-May-2018 11:30:00 16-May-2018 15:00:00 View
391 Thorough repairing of one number steel pontoon at Petroleum Wharves Budgebudge - 04-May-2018   04-May-2018 16:02:00 29-May-2018 15:30:00 View
392 Supply and installation of 'V' Type Fender and other allied works...04-May-2018   04-May-2018 17:09:00 29-May-2018 15:30:00 View
393 Petty Plumbing and Sanitary works at No. 8 Workshop...03-May-2018   03-May-2018 10:28:00 04-Jun-2018 15:30:00 View
394 Developing a portion of South side Lawn / Garden by making gravel pathway...02-May-2018   02-May-2018 10:20:00 04-May-2018 15:30:00 View
395 Petty plumbing & sanitary works as may be necessary at Subhas Nagar CISF Campus...02-May-2018   02-May-2018 12:05:00 10-May-2018 15:30:00 View
396 Thorough repairs and painting to the outside of Subhas Bhavan including boundary wall...26-April-2018   26-Apr-2018 10:41:00 17-May-2018 15:30:00 View
397 Erection/fixing of demarcation pillars and notification boards to...26-April-2018   26-Apr-2018 13:01:00 23-May-2018 15:30:00 View
398 Petty repairs of different roads of South Division to maintain the roads in a motorable condition...26-April-2018   26-Apr-2018 17:03:00 23-May-2018 17:30:00 View
399 Displaying various board/signal/placard/direction symbols at inside Dock...25-April-2018   25-Apr-2018 12:02:00 16-May-2018 15:30:00 View
400 Providing fencing with Angle Iron Post and Barbed wire around the three Plots...24-April-2018
» Corrigendum-I
» Corrigendum-II
24-Apr-2018 11:06:00 03-May-2018 15:30:00 View
401 Supply of one No. Lorry fitted with round shaped water tanker/water tanks with pump for sprinkling of water...24-April-2018   24-Apr-2018 11:25:00 16-May-2018 15:30:00 View
402 Repairing of damaged boundary wall as and when required...24-April-2018   24-Apr-2018 14:44:00 07-May-2018 15:30:00 View
403 Providing fencing including repairing of existing boundary wall...21-April-2018   21-Apr-2018 12:05:00 30-Apr-2018 15:30:00 View
404 Developing a portion of South side Lawn / Garden by making gravel pathway...21-April-2018   21-Apr-2018 11:45:00 25-Apr-2018 15:30:00 View
405 Reconstruction of Dock-I(West) internal road running along west side boundary wall...20-April-2018   20-Apr-2018 12:10:00 11-May-2018 15:30:00 View
406 Repairing & restoration of Dock East boundary road with mastic topping...20-April-2018   20-Apr-2018 12:15:00 11-May-2018 15:30:00 View
407 Construction of new boundary wall at the southern side of Alifnagar Crew's quarters...20-April-2018   20-Apr-2018 12:26:00 16-May-2018 15:30:00 View
408 Supply of daily labour for various sites of River Training wing...19-April-2018   19-Apr-2018 11:50:00 04-May-2018 15:30:00 View
409 Erection of temporary fencing along all sides of Boat Canal Area...19-April-2018   19-Apr-2018 12:48:00 17-May-2018 15:30:00 View
410 Developing a portion of South side Lawn / Garden by making gravel pathway...18-April-2018   17-Apr-2018 10:15:00 19-Apr-2018 15:30:00 View
411 Daily operation of sluice valve for supply of water....16-APR-2018   16-Apr-2018 14:50:00 07-May-2018 15:00:00 View
412 Facelifting of boundary wall (Outer and Inner Face) from C.G.R.Road Xing...13-April-2018   13-Apr-2018 10:47:00 08-May-2018 15:30:00 View
413 Waterproofing treatment work to the roof of Mooring Masters' Office...13-April-2018   13-Apr-2018 17:12:00 08-May-2018 15:30:00 View
414 Repairs to the internal roads at Dry Dock, Dock-I East, CMM...11-Apr-2018   11-Apr-2018 13:10:00 08-May-2018 15:30:00 View
415 Development of Garden at front area of Subhas Bhaban and Car Parking area...10-April-2018
» Corrigendum-I
10-Apr-2018 12:10:00 08-May-2018 15:30:00 View
416 Upkeeping of Camp premises, sheds/Building under Superintending Engineer (R.T) at Phalta Base Camp...   10-Apr-2018 12:50:00 10-May-2018 15:30:00 View
417 Petty Miscellaneous repairing works within Petroleum Wharf area at Budge Budge...10-April-2018   10-Apr-2018 17:28:00 02-May-2018 15:00:00 View
418 Repair to ther Diamond Harbour Jetty Pontoon...09-April-2018   09-Apr-2018 14:20:00 18-Apr-2018 15:30:00 View
419 Supply of unskilled labour at any location (both inside and outside Dock area ) for different miscellaneous works...06-April-2018   06-Apr-2018 10:40:00 17-Apr-2018 15:30:00 View
420 Cutting and trimming branches of trees...06-April-2018   06-Apr-2018 10:50:00 17-Apr-2018 15:00:00 View
421 Petty miscellaneous building repairing works as may be necessary at Portland Park Campus...06-April-2018   06-Apr-2018 12:40:00 26-Apr-2018 15:30:00 View
422 Thorough repair to the outside of buildings & waterproofing treatment work to the roof of buildings...05-April-2018   05-Apr-2018 16:00:00 27-Apr-2018 15:30:00 View
423 Construction of Toilet block with drinking water facility and rest shed at Coal Dock Road...04-April-2018   04-Apr-2018 11:15:00 26-Apr-2018 15:30:00 View
424 'V' Type Fender and other allied works at Approach Jetty...04-April-2018
» Corrigendum-I
» Corrigendum-II
04-Apr-2018 11:20:00 Tender has been Terminated View
425 Repairing & facelifting of old boundary wall...04-April-2018
» Corrigendum-I
04-Apr-2018 12:50:00 26-Apr-2018 15:30:00 View
426 Inside thorough Repairing of 51 C.G.R. Road office old building...04-April-2018   04-Apr-2018 12:55:00 26-Apr-2018 15:30:00 View
427 Provide service of labour at different areas for emergency misc. work...31-Mar-2018   31-Mar-2018 11:00:00 26-Apr-2018 15:30:00 View
428 Nourishment of Spur No. 92A at Moyapur Region...31-Mar-2018
» Corrigendum - I
» Corrigendum-II
31-Mar-2018 14:10:00 20-Apr-2018 15:30:00 View
429 Repairing of Deck joint plates of BASCULE BRIDGE (NAZRULSetu) at night...28-Mar-2018   28-Mar-2018 10:20:00 09-Apr-2018 15:30:00 View
430 Renovation and reconstruction of damaged Electrical switch room...28-Mar-2018   28-Mar-2018 10:25:00 06-Apr-2018 15:30:00 View
431 Operation & maintenance of Water Treatment Plant and Intake Pump....27-Mar-2018
» Corrigendum-I
27-Mar-2018 13:05:00 17-Apr-2018 15:00:00 View
432 Cleaning & Disinfection of Underground Vats. Overhead Fresh Water Tanks...27-Mar-2018   27-Mar-2018 13:10:00 06-Apr-2018 15:30:00 View
433 Miscellaneous plumbing & sanitary repair works at Port Land Quarters...27-Mar-2018
» Corrigendum & Addendum
27-Mar-2018 13:20:00 16-Apr-2018 15:30:00 View
434 Petty miscellaneous building repair works at Chetla Residential Complex...27-Mar-2018   27-Mar-2018 13:25:00 16-Apr-2018 15:30:00 View
435 Misc. petty repairs to different sheds and offices of CME Department...23-Mar-2018   23-Mar-2018 10:15:00 20-Apr-2018 15:30:00 View
436 Repairs to internal Road of Libyan ware House...23-Mar-2018   23-Mar-2018 10:20:00 17-Apr-2018 15:30:00 View
437 Upkeepment and maintenance of office of the Superintending Engineer...23-Mar-2018   23-Mar-2018 10:25:00 17-Apr-2018 15:30:00 View
438 Cleaning of silt including removing of left over materials, Garbage mixed with rubbish and all other filthy materials from the road side...23-Mar-2018   23-Mar-2018 10:40:00 17-Apr-2018 15:30:00 View
439 Supply of earthmovers/ mechanical excavator on hire, cutting jungles, supply of unskilled labours...23-Mar-2018   23-Mar-2018 10:55:00 17-Apr-2018 15:30:00 View
440 Civil Engineering accommodation and providing services of cook-cum-attendant in Civil Engineering Camp establishment...23-Mar-2018   23-Mar-2018 14:25:00 11-Apr-2018 15:30:00 View
441 Thorough repairs to the Dock Boundary wall starting from gate no- 6 to gate no-4...21-Mar-2018   21-Mar-2018 12:35:00 17-Apr-2018 15:30:00 View
442 Petty plumbing and sanitary works within Petroleum Wharf area at Budgebudge...20-Mar-2018   20-Mar-2018 10:02:00 02-Apr-2018 15:30:00 View
443 Technical services covering planning, designing and supervision of construction with allied works for Refurbishment of Head Office...20-Mar-2018
» Corrigendum
20-Mar-2018 15:03:00 24-Apr-2018 15:30:00 View
444 Construction of proposed Komagata Maru Memorial Building, Boundary wall...19-Mar-2018   19-Mar-2018 12:50:00 11-Apr-2018 15:30:00 View
445 Erection/fixing of demarcation pillars and notification boards...19-Mar-2018   19-Mar-2018 12:55:00 10-Apr-2018 15:30:00 View
446 Cutting of rank vegetation from compound premises including cleaning surface and uprooting of plants...17-March-2018   17-Mar-2018 10:49:00 27-Mar-2018 15:00:00 View
447 Design of 4NSD Gate At Netaji Subhas Dock...17-Mar-2018   17-Mar-2018 11:00:00 27-Mar-2018 15:30:00 View
448 Reconstruction of Dock-I(West) internal road running along west side boundary wall...16-Mar-2018   16-Mar-2018 16:15:00 10-Apr-2018 15:30:00 View
449 Repairing & restoration of Dock East boundary road...16-Mar-2018   16-Mar-2018 16:20:00 10-Apr-2018 15:30:00 View
450 Construction of new boundary wall at the southern side of Alifnagar Crew's quarters...15-Mar-2018   15-Mar-2018 10:57:00 06-Apr-2018 15:30:00 View
451 Thorough repair to the road from KoPT garrage to LRRS Building...15-Mar-2018   15-Mar-2018 11:06:00 05-Apr-2018 15:30:00 View
452 Dismantling of Old Condemned BISN Mazdoor Line up to Ground Level, Stacking of Bricks at Site...15-Mar-2018   15-Mar-2018 15:30:00 05-Apr-2018 15:30:00 View
453 Videography of Under-structure of Berth No 7 at Netaji Subhas Dock - 15-Mar-2018   15-Mar-2018 15:45:00 26-Mar-2018 15:30:00 View
454 Providing and fixing uPVC door, windows...15-Mar-2018   15-Mar-2018 16:50:00 19-Mar-2018 15:30:00 View
455 Thorough repairs of internal black top roads within Remount Road quarters' premises....13-Mar-2018   13-Mar-2018 13:00:00 05-Apr-2018 13:30:00 View
456 Facelifting of dock boundary wall from gate no.1 (K.P.D.-1) to Swinge bridge...13-Mar-18   13-Mar-2018 16:20:00 05-Apr-2018 15:30:00 View
457 Jungle cutting including uprooting and removing of vegetation,Grass,Bushes etc...13-Mar-2018   13-Mar-2018 16:30:00 06-Apr-2018 15:30:00 View
458 Operation of Pump Motor Set at A Shed reservoir including valve operation...13-Mar-18   13-Mar-2018 16:35:00 26-Mar-2018 15:30:00 View
459 Weedicide treatment along with Jungle Cutting in and around Petroleum Wharf area...13-Mar-2018   13-Mar-2018 17:15:00 03-Apr-2018 15:30:00 View
460 Maintenance day to day operation and other ancillary works at Water Treatment Plant...12-Mar-2018   12-Mar-2018 16:50:00 05-Apr-2018 15:30:00 View
461 Design , fabricate, supply, test, and deliver at approved location at Kolkata Dock System or at Budge Budge Moorings one no. Main Pontoon...09-Mar-2018   09-Mar-2018 12:15:00 03-Apr-2018 15:30:00 View
462 Repair and renovation to the outside and inside of shed no. 24...09-Mar-2018   09-Mar-2018 12:10:00 03-Apr-2018 15:30:00 View
463 Proposed Office for Estate Division at 1st Floor of Fairlie Warehouse for Bay No.4 - 08-Mar-2018   08-Mar-2018 11:40:00 29-Mar-2018 15:30:00 View
464 Civil works (replacement of existing doors and steel windows with alluminium doors and windows and other ancillary works) related to installation of A.C...06-Mar-2018   06-Mar-2018 16:34:00 28-Mar-2018 15:30:00 View
465 Inside repairs and painting to MM Division Office...05-Mar-2018   05-Mar-2018 11:55:00 27-Mar-2018 15:30:00 View
466 Face lifting and renovation of HO Canteen including Corridor...05-Mar-2018   05-Mar-2018 13:30:00 27-Mar-2018 15:30:00 View
467 Installation of fenders (both rubber & wooden) and necessary repairs to the damage approach jetty KPD...05-Mar-2018   05-Mar-2018 17:15:00 28-Mar-2018 15:30:00 View
468 Through Repairing and painting of over head Steel Tank at 5 no. and 9 no. NSD gate...02-March-2018
» Corrigendum - I
02-Mar-2018 11:55:00 27-Mar-2018 15:30:00 View
469 Petty Miscellaneous repairing works within Petroleum Wharf area at Budge Budge...03-Mar-2018   02-Mar-2018 12:20:00 23-Mar-2018 15:00:00 View
470 Repairing & face-lifting of Kantapukur barrack's presently occupied by CISF...02-Mar-2018   02-Mar-2018 12:25:00 27-Mar-2018 15:30:00 View
471 Petty plumbing and sanitary works at residential areas...28-Feb-2018   28-Feb-2018 11:30:00 13-Mar-2018 15:30:00 View
472 Removal / levelling of heaped up debris from different areas along the internal road side...24-Feb-2018   24-Feb-2018 10:45:00 22-Mar-2018 15:30:00 View
473 Replacement of old damaged G.C.I sheet by new G.C.I sheet...22-Feb-2018
» Corrigendum - I
22-Feb-2018 11:20:00 19-Mar-2018 15:30:00 View
474 Petty Misc repairs to shed building , goomties at Dock-II...22-Feb-2018   22-Feb-2018 12:20:00 21-Mar-2018 15:30:00 View
475 Construction of new boundary walls behind the Alifnagar Crew's quarters...21-Feb-2018   21-Feb-2018 11:20:00 15-Mar-2018 15:30:00 View
476 Thorough repair, renovation to both inside and outside of Allifnagar Marine Crew's Quarters...21-Feb-2018   21-Feb-2018 11:30:00 20-Mar-2018 15:30:00 View
477 Petty miscellaneous repairs to sheds, buildings, goomties...21-Feb-2018   21-Feb-2018 12:10:00 19-Mar-2018 15:30:00 View
478 Waterproofing treatment work to the roof of Mooring Masters' Office...21-Feb-2018   21-Feb-2018 12:30:00 19-Mar-2018 15:30:00 View
479 Misc. petty repairs to sheds, buildings Goomties etc. at Dock-I (West) area including infrastructure at Hide Road...21-Feb-2018
» Corrigendum - I
21-Feb-2018 12:35:00 20-Mar-2018 15:30:00 View
480 Operation & maintenance of Water Treatment Plant and Intake Pump...21-Feb-2018   21-Feb-2018 14:00:00 20-Mar-2018 15:30:00 View
481 Construction of proposed Komagata Maru Memorial Building, Boundary wall...19-Feb-2018   19-Feb-2018 14:30:00 15-Mar-2018 15:30:00 View
482 Cleaning operation of the entire inside & outside of Central Record & Documentary Centre...19-Feb-2018   19-Feb-2018 14:44:00