Tenders - Archive

Print Version  
Last Updated On: 29-September-2020
Choose Any to Filter:
 
Administration Department
S.No Title & Ref.No Corrigendums Published Date Bid Open Date Details
1 Tender for Printing, Binding & Supply of Administrative Report for 2019-20...15-June-2020   15-Jun-2020 12:27:00 15-Jul-2020 15:00:00 View
2 Comprehensive Facility Management Services Under General Administration Deptt...-21-February-2020
» CORRIGENDUM- III
21-Feb-2020 16:47:00 03-Jun-2020 15:00:00 View
3 Empanelment of Advertising Agencies ...-27-September-2019   30-Sep-2019 09:30:00 21-Oct-2019 16:00:00 View
4 Planning, Organising and Conducting Events/Activitiesrelated to 150th year celebrations..-25--June-2019   25-Jun-2019 11:00:00 25-Jul-2019 15:00:00 View
5 Planning, Organising and Conducting Events/Activities related to 150th year celebrations..-25-June-2019
» ADDENDUM/CORRIGENDUM - I
» Addendum/Corrigendum-II
» ADDENDUM/CORRIGENDUM -III
25-Jun-2019 11:21:00 27-Jul-2019 15:00:00 View
6 Tender for Printing, Binding & Supply of Administrative Report..-20-May-2019   20-May-2019 11:59:00 20-Jun-2019 15:00:00 View
7 Washing/Laundry service - 07-Mar-2019   07-Mar-2019 12:30:00 26-Mar-2019 15:00:00 View
8 Design and decoration of Kolkata Port Trust stall including production of exhibition materials in Domestic RBSM during India Rubber Expo 2019 at Mumbai   24-Dec-2018 13:00:00 31-Dec-2018 14:00:00 View
9 Design, production and printing of executive diaries of Kolkata Port Trust for the year 2019 - 27-Nov-2018   27-Nov-2018 17:29:00 03-Dec-2018 14:00:00 View
10 Design, production and printing of normal diaries of Kolkata Port Trust for the year 2019 - 27-Nov-2018   27-Nov-2018 17:29:00 03-Dec-2018 14:00:00 View
11 Design, production and printing of desk calendars...26-Nov-2018   26-Nov-2018 12:36:00 03-Dec-2018 14:00:00 View
12 Design, production and printing of special six page wall calendars...26-Nov-2018   26-Nov-2018 12:40:00 03-Dec-2018 14:00:00 View
13 Design, production and printing of single page wall calendars...26-Nov-2018   26-Nov-2018 12:42:00 03-Dec-2018 14:00:00 View
14 Providing Photocopying services to General Administration Department of Kolkata Port Trust - 16-July-2018   16-Jul-2018 14:20:00 10-Aug-2018 15:30:00 View
15 Engagement of facilitator / service provider for compliance with EPFO requirement of uploading and processing employee data - 13-July-2018   13-Jul-2018 16:05:00 03-Aug-2018 15:30:00 View
16 Printing, Binding and Supply of Administration Report - 13-June-2018
» Corrigendum-I
13-Jun-2018 15:56:00 06-Jul-2018 15:30:00 View
17 Expert Services towards implementation of Integrated Management System...25-May-2018   25-May-2018 15:22:00 12-Jun-2018 15:30:00 View
18 Engagement of Agency for Providing Messenger Service...13-April-2018
» Corrigendum-1
13-Apr-2018 17:18:00 16-May-2018 15:30:00 View
19 Upkeepment and errand services to General Administration Department - 27-Nov-2017   27-Nov-2017 11:50:00 02-Jan-2018 15:30:00 View
20 Design, production and printing of normal diaries of Kolkata Port Trust...25-Nov-2017   25-Nov-2017 14:10:00 29-Nov-2017 14:00:00 View
21 Design, production and printing of executive diaries of Kolkata Port Trust...25-Nov-2017   25-Nov-2017 14:20:00 29-Nov-2017 14:00:00 View
22 Design, production and printing of desk calendars of Kolkata Port Trust....14-Nov-2017
» Corrigendum
14-Nov-2017 11:30:00 21-Nov-2017 14:00:00 View
23 Design, production and printing of single page wall calendars of Kolkata Port Trust....14-Nov-2017   14-Nov-2017 12:00:00 21-Nov-2017 14:00:00 View
24 Design, production and printing of special six page wall calendars of Kolkata Port Trust...14-Nov-2017
» Corrigendum
14-Nov-2017 12:10:00 21-Nov-2017 14:00:00 View
25 Printing, Binding and Supply of Administrative Report for 2016-17   12-Jul-2017 17:40:00 07-Aug-2017 12:00:00 View
26 Design of the Cover of Administrative Report for the year 2016-17   12-Jul-2017 17:45:00 08-Aug-2017 12:00:00 View
27 Washing/laundry service for Washing and ironing of Selected curtains...15-Dec-2016   15-Dec-2016 11:20:00 13-Jan-2017 15:00:00 View
28 Greetings card with matching envelope...22-Nov-2016   22-Nov-2016 12:25:00 25-Nov-2016 15:00:00 View
29 Design, production and printing of single page wall calendars of Kolkata Port Trust for the year 2017   16-Nov-2016 12:35:00 21-Nov-2016 16:00:00 View
30 Design, production and printing of special six page wall calendars of Kolkata Port Trust for the year 2017   16-Nov-2016 14:10:00 21-Nov-2016 16:00:00 View
31 Washing/laundry service - 02-Nov-2016   02-Nov-2016 09:30:00 25-Nov-2016 15:00:00 View
32 De-pesting of Guesthouse of Kolkata Port Trust at 93,Chowringhee Road...22-Sept-2016   23-Sep-2016 09:30:00 20-Oct-2016 15:00:00 View
33 Photocopying work in the Head Office...05-AUG-2016   05-Aug-2016 11:50:00 23-Aug-2016 15:00:00 View
34 Printing, Binding & Supply of Administrative Report...12-July-2016   12-Jul-2016 15:30:00 01-Aug-2016 15:00:00 View
35 Design of the Cover of Administrative Report ...12-July-2016   12-Jul-2016 15:30:00 28-Jul-2016 15:00:00 View
36 Photocopying work...25-May-2016   25-May-2016 11:20:00 20-Jun-2016 15:00:00 View
37 Decoration of Kolkata Port Trust stall including production of exhibited materials in the Maritime India Summit 2016 at Bombay Convention & Exhibition Centre, Mumbai...02-March-2016
» Addendum
02-Mar-2016 14:40:00 15-Mar-2016 14:00:00 View
38 Appointment of Agency for providing application screening..-07-Jan-2016   07-Jan-2016 13:10:00 15-Jan-2016 14:30:00 View
39 Appointment of Agency for providing Application Screening and Data Processing Services.-18-Dec-2015
» Corrigendum
» Discharged
18-Dec-2015 13:10:00 Tender has been Terminated View
40 Design, production and printing of single page wall calendars...23-Nov-2015   23-Nov-2015 14:20:00 03-Dec-2015 12:00:00 View
41 Design, production and printing of special six page wall calendars...23-Nov-2015   23-Nov-2015 14:35:00 03-Dec-2015 12:00:00 View
42 Design of the Cover of Administrative Report...10-June-2015   10-Jun-2015 12:00:00 29-Jun-2015 16:30:00 View
43 Printing, Binding & Supply of Administrative Report...10-June-2015   10-Jun-2015 12:05:00 29-Jun-2015 16:30:00 View
44 Supply & operation of Lorry...14-May-2015   14-May-2015 15:30:00 12-Jun-2015 15:30:00 View
45 Supply & operation of Bus - 14-May-2015   14-May-2015 15:35:00 12-Jun-2015 16:00:00 View
46 Supply & Operation of Tata 207...   02-Apr-2015 16:25:00 30-Apr-2015 14:30:00 View
47 Hiring of Turn-out-Van...   02-Apr-2015 16:30:00 30-Apr-2015 15:30:00 View
48 Engagement of Agency for providing Messenger Service   25-Mar-2015 17:00:00 28-Apr-2015 15:00:00 View
49 Supply & Operation of Tata 207 or any other Similar Model - 26-Feb-2015   26-Feb-2015 12:00:00 20-Mar-2015 14:30:00 View
50 Hire of Turn-out-Van (24 hrs fixed duty, model-Tata-410) - 26-Feb-2015   26-Feb-2015 12:10:00 20-Mar-2015 15:30:00 View
51 Grant of permission for operating Floating Storage and Regasification Unit (FSRU) / Floating Storage Unit (FSU) for receiving, storing, regasifying (optional) and transporting LNG. - 27-Feb-2015
» Minutes of the Pre-Bid Meeting
17-Feb-2015 11:00:00 16-Mar-2015 15:00:00 View
52 Providing Messenger Service   16-Dec-2014 11:30:00 14-Jan-2015 15:00:00 View
53 Operating Floating Storage and Regasification Unit(FSRU) / Floating Storage Unit (FSU)
» Clange of clause
» Change of Clause and extension of opening date
» Change of Clause and extension of opening date - II
10-Dec-2014 15:00:00 16-Feb-2015 15:00:00 View
54 Hire of 24 hours Fixed Duty Ambulance   27-Nov-2014 11:00:00 26-Dec-2014 14:30:00 View
55 Tender for Supply & Operation of Tata 207 or any other Similar Model.
» Extension
02-Sep-2013 00:00:00 24-Feb-2014 00:00:00 View
 
Administration Division
S.No Title & Ref.No Corrigendums Published Date Bid Open Date Details
1 Allotment of covered space/land at different zones of HDC, on license and as is where is basis for a period of 5 years for through tender-cum-auction..24-Sep-2020
» CORRIGENDUM I
13-Aug-2020 14:00:00 24-Sep-2020 16:00:00 View
2 Allotment of KOPT land msg. about 6474.968 sq. mtrs. in the Residential Zone of Haldia Dock Complex, Haldia, West Bengal for setting up of residential complex through tender-cum-auction...28-Aug-2020   27-Jul-2020 11:00:00 28-Aug-2020 16:00:00 View
3 Transportation of papers/documents and other materials between Administration Office, Jawahar Tower Annex Building, Haldia Township and SMP Head Office at 15 Strand Road, Kolkata –700001..28-July-2020   11-Jul-2020 17:00:00 28-Jul-2020 15:30:00 View
4 Allotment of two (02) plots of KoPT land in front of IOCL Refinery Gate No. 1 in the Commercial Zone of Haldia Dock Complex, Haldia on “as is where is” basis, on upfront rent basis for 30 yrs. for different commercial purposes through tender-cum-auction...13-Aug-2020
» EXTENSION
» EXTENSION II
03-Jul-2020 10:00:00 01-Sep-2020 16:00:00 View
5 Installation, operation, broadcasting and comprehensive maintenance of cable tv network system for a period of 3 years at under Haldia Dock Complex...24-July-2020
» CORRIGENDUM I
03-Jul-2020 11:45:00 05-Aug-2020 15:30:00 View
6 Disposal of only uprooted trees from the Residential Zone of Haldia Dock Complex...07-July-2020   26-Jun-2020 13:00:00 07-Jul-2020 15:30:00 View
7 Allotment of 04 plots of KoPT land in the Industrial Zone of Haldia Dock Complex, Haldia,West Bengal for setting up of Industry/ Agri park through tender-cum-auction...04-Aug-2020   25-Jun-2020 10:00:00 04-Aug-2020 16:00:00 View
8 Supply, plantation & maintenance of 2000 saplings for a period of 3 years at different locations in the Residential Zone of Haldia Dock Complex...16-July-2020   24-Jun-2020 16:30:00 16-Jul-2020 16:00:00 View
9 Supply and delivery of seasonal flower seeds, seedlings, rooted cuttings, bulbs etc on annual rate contract basis for beautification work at offices, parks and gardens in HDC area, Haldia...24-July-2020   19-Jun-2020 16:00:00 24-Jul-2020 15:00:00 View
10 Allotment of about 20,477.09 sq.mtrs. (or 5.06 acres) of land in Dock Zone of Haldia Dock Complex, Haldia on long term lease of 30 years without automatic renewal option of lease, on ‘as is where is’ basis, on Upfront Rent basis, through tender-cum-auction...13-Jul-2020
» EXTENSION NOTICE I
» ADDENDUM
» EXTENSION II
09-Jun-2020 11:45:00 19-Aug-2020 16:30:00 View
11 Supply, Operation & Maintenance of A/C motor cabs & A/C maxi cabs under Haldia Dock Complex for a period of 3 years...24-June-2020
» CORRIGENDUM & REPLY TO PRE BID QUERIES
03-Jun-2020 15:10:00 30-Jun-2020 15:30:00 View
12 Supply, Operation & Maintenance of one A/C motor cab under Haldia Dock Complex for a period of 3 years.   28-May-2020 10:30:00 17-Jun-2020 15:00:00 View
13 Supply and delivery of “Fire Fighting equipments, other related Materials & accessories” (as per the Bill of Quantities) to Haldia Dock Complex, Haldia...08-July-2020   27-May-2020 10:45:00 08-Jul-2020 16:00:00 View
14 long term lease of 30 years without automatic renewal option of lease, including buildings, structures etc. which are established by ex-lessee and Upfront Rent basis, through tender-cum-auction with First Right of Refusal to the Occupant for Setting up of Residential Complex including other ancillary facilities...07-July-2020
» ADDENDUM & REPLY TO QUERIES
26-May-2020 11:30:00 07-Jul-2020 16:00:00 View
15 Allotment of about 14,650 sq.mtrs. of land in Industrial Zone of HDC on long term lease of 30 years without automatic renewal option of lease, on Upfront Rent basis, through tender-cum-auction with First Right of Refusal to the occupant for establishment of railway siding..07-July-2020   22-May-2020 14:00:00 07-Jul-2020 16:30:00 View
16 Transportation of papers/documents and other materials between Administration Office, Jawahar Tower Annex Building, Haldia Township and KoPT Head Office at 15 Strand Road, Kolkata –700001 at Haldia Dock Complex, Kolkata Port Trust...09-Apr-2020
» CORRIGENDUM I
» CORRIGENDUM II
» ADDENDUM
19-Mar-2020 10:00:00 01-Jun-2020 15:30:00 View
17 Allotment of about 10,117 sq.mtrs. of land in Dock Zone of Haldia Dock Complex, Haldia on long term lease of 30 years without automatic renewal option of lease, on ‘as is where is’ basis, on Upfront Rent basis, through tender-cum-auction...13-Apr-2020
» EXTENSION NOTICE
» EXTENSION NOTICE II
» EXTENSION NOTICE III
» EXTENSION NOTICE IV
13-Mar-2020 10:00:00 22-Jun-2020 16:30:00 View
18 Supply, laying and commissioning of fibre optic cable from Superior Petrol Pump to Empty Gate at Haldia, WB and connecting with existing fibre optic cable of Haldia Dock Complex, Kolkata Port Trust at Haldia...06-Mar-2020   13-Feb-2020 16:00:00 06-Mar-2020 15:00:00 View
19 Hiring of armed & unarmed security personnel for security and surveillance at different areas under Haldia Dock Complex, Kolkata Port Trust...17-Feb-2020
» CORRIGENDUM I
» CORRIGENDUM II
» CORRIGENDUM III
» CORRIGENDUM IV
» ADDENDUM I & REPLY TO PRE BID QUARIES
» CORRIGENDUM v
» CORRIGENDUM VI
» CORRIGENDUM VII
» CORRIGENDUM VIII
24-Jan-2020 11:15:00 22-May-2020 15:30:00 View
20 Design,construction,erection,decoration and electrification of HDC, KoPT Pavillion at Haldia during Haldia Trade Fair,2020...20-Jan-2020   14-Jan-2020 12:45:00 20-Jan-2020 15:30:00 View
21 Design,construction,erection,decoration,exhibition and illumination of a Gate at Haldia Trade Fair,2020...20-Jan-2020   14-Jan-2020 12:45:00 20-Jan-2020 15:00:00 View
22 Transportation of papers/documents and other materials between Administration Office, Jawahar Tower Annex Building, Haldia Township and KoPT Head Office at 15 Strand Road, Kolkata –700001 at Haldia Dock Complex, Kolkata Port Trust.   13-Jan-2020 16:30:00 04-Feb-2020 15:30:00 View
23 Transportation of papers/documents and other materials between Administration Office, Jawahar Tower Annex Building, Haldia Township and KoPT Head Office at 15 Strand Road, Kolkata –700001 at Haldia Dock Complex, Kolkata Port Trust...03-Jan-2020   13-Dec-2019 12:30:00 03-Jan-2020 15:30:00 View
24 Cleaning, supply, plantation, development, landscaping, beautification & maintenance of environment park at Haldia Dock Complex, Kolkata Trust...06-Dec-2019   12-Nov-2019 10:00:00 06-Dec-2019 16:30:00 View
25 Allotment of various plots of KoPT land at Haldia Township, Haldia on as is where is basis, on upfront rent basis for the different purposes through tender-cum-auction.
» REPLY TO QUERIES AND CORRIGENDUM
25-Sep-2019 19:30:00 31-Oct-2019 16:00:00 View
26 Operation and maintenance of one (01) KOPT’s foam tender at Haldia Dock Complex, Kolkata Port Trust...18-Oct-2019
» Corrigendum and Reply to Pre bid Queries
13-Sep-2019 10:00:00 18-Oct-2019 15:30:00 View
27 One-year maintenance contract of networking equipments of Haldia Dock Complex, Kolkata Port Trust at Haldia, Purba Medinipur, West Bengal, India...10-Oct-2019   13-Sep-2019 15:45:00 10-Oct-2019 15:30:00 View
28 Supply, delivery and commissioning of total station theodolite to Haldia Dock Complex...01-Oct-2019   07-Sep-2019 10:00:00 01-Oct-2019 15:30:00 View
29 Granting license for installation, operation & maintenance of facility for supply of RO water inside Haldia Dock Complex, Kolkata Port Trust...12-Sep-2019
» CORRIGENDUM CUM ADDENDUM
03-Sep-2019 12:00:00 12-Sep-2019 15:30:00 View
30 Allotment of KOPT land msg. about 15500 sq. mtrs. adjacent to Oil Jetty Road at Haldia Dock Complex near Vidyasagar Morh Crossing at Haldia, West Bengal for setting up of a truck terminal along with ancillary facilities through Tender-cum- Auction...30-Sep-2019   29-Aug-2019 10:30:00 30-Sep-2019 16:00:00 View
31 Allotment of 02 (two) plots of KOPT land at Liquid Cargo behind Finger Jetty at Haldia, West Bengal for setting up of industry / storage terminal / storage facilities for permissible dry bulk / liquid bulk cargo other than class A&B liquid cargo through tender-cum-auction...25-Sep-2019   27-Aug-2019 10:14:00 25-Sep-2019 16:00:00 View
32 Hiring of armed & unarmed security personnel for security and surveillance at different areas under Haldia Dock Complex, Kolkata Port Trust...11-Sep-2019
» CORRIGENDUM AND ADDENDUM
19-Aug-2019 10:50:00 11-Sep-2019 15:30:00 View
33 Supply and delivery of Bain Marie (food warmer)to Haldia Dock Complex, Haldia...27-Aug-2019   09-Aug-2019 10:00:00 27-Aug-2019 15:30:00 View
34 Supply, delivery, installation & commissioning and comprehensive maintenance of a semi-automatic chapati...21-Aug-2019
» CORRIGENDUM
06-Aug-2019 12:30:00 21-Aug-2019 15:30:00 View
35 Allotment of about 5500 sq.mtrs. of land in Residential Zone of Haldia Dock Complex, Haldia...20-Aug-2019   25-Jul-2019 12:45:00 20-Aug-2019 16:30:00 View
36 Granting license for installation, operation & maintenance of facility for supply of RO water inside Haldia Dock Complex, Kolkata Port Trust...12-Aug-2019
» ADDENDUM & REPLY TO QUARIES
» NOTICE
» CORRIGENDUM II
23-Jul-2019 15:45:00 13-Aug-2019 11:00:00 View
37 Supply, delivery and installation of laptops with 3-years comprehensive warranty at Haldia Dock Complex, Kolkata Port Trust
» CORRIGENDUM AND REPLY TO QUERIES
17-Jul-2019 11:00:00 14-Aug-2019 15:30:00 View
38 Allotment of KoPT land msg. about 10.171 acres (or 41,160.56 sq.mtrs.) at liquid cargo park behind Finger Jetty in the Dock Zone of Haldia Dock Complex, Haldia...31-Jul-2019
» CORRIGENDUM CUM ADDENDUM & REPLY TO QUERIES
05-Jul-2019 10:30:00 31-Jul-2019 16:00:00 View
39 Allotment of covered space/land at different zones of Haldia Dock Complex...02-Aug-2019   02-Jul-2019 11:00:00 02-Aug-2019 16:00:00 View
40 Allotment of various plots of KoPT land at Residential Zone of Haldia Dock Complex, Haldia...23-Jul-2019   26-Jun-2019 11:40:00 23-Jul-2019 15:30:00 View
41 Allotment of one plot of land msg about 100 sq. mtrs. located in the area in front of IOCL Gate No. 1 in the Industrial Zone of Haldia Dock Complex...29-Jul-2019
» EXTENSION
21-Jun-2019 12:00:00 06-Aug-2019 16:00:00 View
42 Allotment of KOPT land at Haldia Dock Complex for setting up of office through tender-cum-auction...29-Jul-2019   21-Jun-2019 17:20:00 29-Jul-2019 16:00:00 View
43 Supply and delivery of seasonal flower seeds, seedlings, rooted cuttings, bulbs etc on annual rate contract basis for beautification work at offices, parks and gardens in HDC area, Haldia...11-Jul-2019   12-Jun-2019 17:15:00 11-Jul-2019 15:00:00 View
44 Supply, plantation & maintenance of 2500 saplings for a period of 2 years at different locations in the Residential Zone of Haldia Dock Complex...28-June-2019   07-Jun-2019 13:15:00 28-Jun-2019 16:00:00 View
45 Supply, plantation maintenance & protection of 2000 saplings with for a period of 3 years at different locations in the Dock & Industrial Zone of Haldia Dock Complex...28-June-2019   07-Jun-2019 13:15:00 28-Jun-2019 16:00:00 View
46 Allotment of about 5500 sq.mtrs. of land in Residential Zone of HDC, Haldia on long term lease of 30 years without automatic renewal..01-July-2019
» CORRIGENDUM
03-Jun-2019 10:30:00 01-Jul-2019 16:30:00 View
47 Supply & delivery of Bain Marie (food warmer) to Haldia Dock Complex...19-June-2019   30-May-2019 10:00:00 19-Jun-2019 15:30:00 View
48 Supply & delivery of packaged drinking water to the different offices of Haldia Dock Complex, Kolkata Port Trust at Haldia...10-June-2019
» CORRIGENDUM
22-May-2019 16:00:00 13-Jun-2019 15:30:00 View
49 Supply, installation and commissioning of 200 Desktop computers with 6-year comprehensive onsite warranty at Haldia Dock Complex, Kolkata Port Trust, Haldia
» Corrigendum and Reply to Pre-Bid Queries
» CORRIGENDUM ll
21-May-2019 15:30:00 02-Jul-2019 15:30:00 View
50 Maintenance contract for inspection, servicing, maintenance, hydro-testing, refilling and painting of fire extinguishers under Haldia Dock Complex,Kolkata Trust...29-Apr-2019   03-Apr-2019 14:00:00 29-Apr-2019 15:30:00 View
51 Supply, installation & operation of photocopier machines at Haldia Dock Complex, Kolkata Port Trust...18-Apr-2019   28-Mar-2019 13:15:00 18-Apr-2019 15:30:00 View
52 Maintenance contract for inspection, servicing,maintenance, hydro-testing, refilling and painting of fire extinguishers under Haldia Dock Complex,Kolkata Trust...26-Mar-2019   02-Mar-2019 10:00:00 26-Mar-2019 15:30:00 View
53 Allotment of covered space/land at different zones of Haldia Dock Complex...26-Mar-2019   27-Feb-2019 16:00:00 26-Mar-2019 16:00:00 View
54 Supply of one Foam Tender along with manpower under Haldia Dock Complex.
» Addendum and Reply to Queries
» CORRIGENDUM
14-Jan-2019 16:30:00 18-Feb-2019 15:30:00 View
55 Supply and delivery of packaged drinking water to the different offices of Haldia Dock Complex, Kolkata Port Trust at Haldia
» Corrigendum
09-Jan-2019 17:30:00 14-Feb-2019 15:30:00 View
56 Supply, delivery, installation & commissioning and comprehensive maintenance of a semi-automatic chapati maker...28-Jan-2019   03-Jan-2019 11:45:00 28-Jan-2019 15:30:00 View
57 Limited Tender for supply and delivery of Bain Marie (food warmer) to Haldia Dock Complex, Haldia...30-Jan-2019   03-Jan-2019 13:30:00 30-Jan-2019 16:00:00 View
58 Supply, installation & operation of photocopier machines at Haldia Dock Complex, Kolkata Port Trust...09-Jan-2019   19-Dec-2018 16:30:00 09-Jan-2019 15:30:00 View
59 Hiring of Armed & Unarmed Security Personnel for Security and Surveillance at different areas (as per tender BOQ) under Haldia Dock Complex, Kolkata Port Trust...08-Jan-2019
» CORRIGENDUM I
» REPLY TO THE SECURITY TENDER QUERIES AND ADDENDUM
» CORRIGENDUM II
» CORRIGENDUM III
14-Dec-2018 14:30:00 01-Jul-2019 15:30:00 View
60 Supply & Fogging with Fogger Machine for the control of mosquito and Pest Control etc. at HDC ..06-Dec-2018   16-Nov-2018 16:00:00 06-Dec-2018 15:15:00 View
61 Supply and operation of launch between Roychak & Kukrahati under Haldia Dock Complex...19-Nov-2018   31-Oct-2018 15:00:00 19-Nov-2018 15:30:00 View
62 Supply and Operation of motor cab/ maxi cab etc. under Haldia Dock Complex   22-Oct-2018 15:00:00 31-Oct-2018 15:30:00 View
63 Supply & Operation of motor cabs, maxi cabs, under Haldia Dock Complex..15-Oct-2018   24-Sep-2018 18:00:00 15-Oct-2018 15:30:00 View
64 Allotment of covered space/land at different zones of Haldia Dock Complex, as described in Annex-A, on license and as is where is basis for a period of 5 years for the purpose as described in Annex-A through tender-cum-auction...05-Oct-2018   05-Sep-2018 10:30:00 05-Oct-2018 16:00:00 View
65 Supply and delivery of dustbin, polythine sheet and jute bag to Haldia Dock Complex, Haldia...28-Aug-2018   22-Aug-2018 12:50:00 28-Aug-2018 16:00:00 View
66 Allotment of land msg about 131579.83 sq mts near Panskura Rly Station at Panskura, Purba Medinipur on as is where is basis for the purpose of setting up of industries, storage facilities, warehousing through tender-cum-auction.   26-Jul-2018 17:30:00 28-Aug-2018 16:00:00 View
67 Engagement of consultant for preparation of a master plan for Kolkata Trust...24-Aug-2018
» ADDENDUM , CORRIGENDUM & REPLY TO QUERIES
» CORRIGENDUM II
25-Jul-2018 11:45:00 24-Sep-2018 16:00:00 View
68 Installation and Commissioning of 20 MBPS bandwidth NON-BSNL leased line internet connection at HDC, KoPT..07-Aug-2018
» ADDENDUM I
19-Jul-2018 17:00:00 14-Aug-2018 15:30:00 View
69 Supply, Installation & Operation of Photocopier Machines at HDC, KoPT..02-August-2018   11-Jul-2018 17:30:00 02-Aug-2018 15:30:00 View
70 Supply and Plantation of 3000 saplings along with 2 year maintenance at different locations in the Residential Zone of HDC..18-July-2018   19-Jun-2018 16:00:00 18-Jul-2018 16:00:00 View
71 Supply, Installation & Operation of photocopier machines at HDC..09-July-2018   15-Jun-2018 17:30:00 09-Jul-2018 15:30:00 View
72 Supply and Delivery of seasonal flower seeds, seedlings, rooted cuttings, bulbs etc on Annual Rate Contract basis..06-July-2018   07-Jun-2018 12:00:00 06-Jul-2018 15:00:00 View
73 Allotment of KoPT land msg. about 40,468.55 sq. mtrs. (Or 10 acres) in the Industrial Zone of HDC at Haldia on lease on âas is where isâ basis for setting up of LNG Terminal with storage & distribution facilities through tender-cum-auction..28-June-2018
» CORRIGENDUM
» REPLY TO QUERIES
» ADDENDUM
» ADDENDUM (EXTENSION NOTICE)
» ADDENDUM III
29-May-2018 20:00:00 31-Aug-2018 16:00:00 View
74 Disposal of accumulated firewood belonging to Haldia Dock Complex, Kolkata Port Trust   16-May-2018 10:30:00 14-Jun-2018 15:00:00 View
75 Allotment of 5.5 acres or 22257.700 sq. mtrs. land in the Industrial Zone of Haldia Dock Complex, Haldia on lease on as is where is basis for setting up of storage, industry, parking area etc.
» Reply to Queries
13-Apr-2018 10:30:00 11-May-2018 16:00:00 View
76 A forestation work along with three year maintenance at the Dock Interior Zone of Haldia Dock Complex   15-Mar-2018 12:30:00 16-Apr-2018 15:00:00 View
77 Supply, installation & commissioning of 130 Monochrome Laser Printers with 5-year comprehensive onsite warranty at Haldia Dock Complex, Kolkata Port Trust at Haldia   28-Feb-2018 12:30:00 23-Mar-2018 15:30:00 View
78 Allotment of covered space/land at different zones of Haldia Dock Complex, as is where is basis for a period of 5 years through tender-cum-auction with first right of refusal to the existing licensee
» CORRIGENDUM
28-Feb-2018 15:30:00 23-Mar-2018 16:00:00 View
79 Commissioning of Biometric Access Control and Camera Surveillance Solution at Jawahar Tower, Haldia Dock Complex, Kolkata Port Trust   02-Feb-2018 15:30:00 06-Mar-2018 15:30:00 View
80 Supply & Operation of A.C. Motor Cab/Maxi cabs under HDC at Kolkata..24-Jan-2018   16-Jan-2018 17:00:00 24-Jan-2018 15:30:00 View
81 Allotment of land msg. about 1 acre in the Dock Zone of Haldia Dock Complex, Haldia on long term lease of 30 years without automatic renewal option of lease, on as is where is basis, on Upfront Premium basis, through tender-cum-auction with First Right of Refusal to the Ex-lessee   10-Jan-2018 12:30:00 07-Feb-2018 16:30:00 View
82 Allotment of covered space/land and waterbody at Chiranjibpur area overing the Dock and Industrial Zone of HDC on license and as is where is basis..05-Feb-2018   03-Jan-2018 12:00:00 05-Feb-2018 16:00:00 View
83 Allotment of land msg. about 1 acre in the Dock Zone of Haldia Dock Complex, Haldia on long term lease of 30 years without automatic renewal option of lease, on as is where is basis, on Upfront Premium basis, through tender-cum-auction with First Right of Refusal to the Ex-lessee.   27-Dec-2017 12:30:00 04-Jan-2018 16:30:00 View
84 Supply and operation of A.C. Motor Cab/Maxi Cab under Haldia Dock Complex, Kolkata Port Trust.   30-Nov-2017 15:30:00 26-Dec-2017 15:30:00 View
85 Allotment of about 16,187.420 sq.mtrs. of land in Dock Zone of Haldia Dock Complex, Haldia on long term lease of 30 years without automatic renewal option of lease, on as is where is basis, on Upfront Premium basis, through tender-cum-auction with First Right of Refusal to the Ex-lessee.   16-Nov-2017 15:00:00 12-Dec-2017 16:30:00 View
86 Commissioning of camera surveillance solution at Lock area of Haldia Dock Complex, Kolkata Port Trust at Haldia   15-Nov-2017 15:00:00 14-Dec-2017 15:30:00 View
87 Allotment of 10 acres or 40,468.55 sq.mtrs. of land behind Finger Jetty in the Dock Zone of Haldia Dock Complex at Liquid Cargo Park , Haldia on lease on as is where is basis for setting up Edible Oil Refinery and/or storage and distribution of liquid cargo other than Class A & B POL Products through tender-cum auction.   01-Nov-2017 09:30:00 30-Nov-2017 16:00:00 View
88 Allotment of KoPT land at Panshkura near Panshkura Rly Station Dist: Purba Medinipur. W.B for Setting up of industries, storage facilities, warehouse etc through Tender-cum-Auction.   01-Nov-2017 09:30:00 29-Nov-2017 16:00:00 View
89 Commissioning of camera surveillance solution at Lock area of Haldia Dock Complex, Kolkata Port Trust   12-Oct-2017 15:30:00 09-Nov-2017 15:30:00 View
90 Supply and commissioning of 200 UPS systems with 5-year comprehensive onsite warranty at Haldia Dock Complex, Kolkata Port Trust   12-Oct-2017 15:30:00 10-Nov-2017 15:30:00 View
91 Setting up of Outer Terminal-I along with all required associated facilities on Design, Build, Finance, Operate, Transfer basis at Haldia Dock Complex for a concession period of thirty years
» ADDENDUM
» REPLIES TO QUERIES
» ADDENDUM-2
» ADDENDUM III
» Discharge of Tender
10-Oct-2017 14:30:00 28-Feb-2018 15:00:00 View
92 Supply and Operation of Motor Cab, Maxi Cab, Pick Up Truck, Mini Bus etc. under Haldia Dock Complex
» CORRIGENDUM CUM ADDENDUM
26-Sep-2017 17:00:00 24-Oct-2017 15:30:00 View
93 Allotment of 10 acres of land in the Dock Zone of Haldia Dock Complex at Liquid Cargo Park , Haldia on lease as is where is basis for setting up of Edible Oil Refinery and/or storage and distribution of liquid cargo other than Class A&B POL Products through tender-cum-auction.
» CORRIGENDUM
14-Sep-2017 15:00:00 24-Oct-2017 16:00:00 View
94 Allotment of KoPT land at Panshkura near Panshkura Rly Station Dist: Purba Medinipur. W.B for Setting up of industries, storage facilities, warehouse etc through Tender-cum-Auction...25-Oct-2017   14-Sep-2017 10:00:00 25-Oct-2017 16:00:00 View
95 Supply and commissioning of 200 nos. UPS systems with 5-year comprehensive onsite OEM warranty at Haldia Dock Complex, Kolkata Port Trust.   13-Sep-2017 09:30:00 10-Oct-2017 15:30:00 View
96 Invitation of e-tender for allotment of 19.46 acres (or 78,751.799 sq.mtrs.) of land of Haldia Dock Complex at Durgachak Camp Area , Haldia on âas is where isâ basis for setting up of Industries, Oil Refineries , storage terminal etc. through tender-cum-auction...18-Oct-2017
» CORRIGENDUM
» EXTENSION
11-Sep-2017 14:00:00 02-Nov-2017 16:00:00 View
97 Supply and operation of launch between Roychak and Kukrahati under Haldia Dock Complex, Kolkata Port Trust.   07-Sep-2017 12:00:00 04-Oct-2017 15:30:00 View
98 Supply, installation & commissioning of 200 desktop computers with 5-year comprehensive onsite warranty at Haldia Dock Complex, Kolkata Port Trust   04-Sep-2017 17:30:00 10-Oct-2017 15:30:00 View
99 Allotment of about 8,093.710 sq. Mtrs. land in Dock Zone of Haldia Dock Complex on long term lease of 30 years without renewal option, on as is where is basis, on Upfront Premium basis, through tender-cum-auction with First Rights of Refusal to the Ex-lessee.   30-Aug-2017 17:30:00 21-Sep-2017 16:30:00 View
100 Allotment of about 28,328 sq. Mtrs. of land in Industrial Zone of Haldia Dock Complex on long term lease of 30 years without renewal option, on as is where is basis, on Upfront Premium basis, through tender-cum-auction with First Rights of Refusal to the Ex-lessee.   30-Aug-2017 17:30:00 21-Sep-2017 16:30:00 View
101 E-Tender are invited from Port Users including but not limited to Handling Agents, Clearing and forwarding Agents, Stevedores, Transporters, KoPT contractors and other service providers for allotment of covered space/land and waterbody at Chiranjibpur area covering the Dock and Industrial Zone of Haldia Dock Complex...21-Sep-2017   11-Aug-2017 13:00:00 21-Sep-2017 16:00:00 View
102 Allotment of about 8,093.710 sq.mtrs. of land in Dock Zone of Haldia Dock Complex on long term lease of 30 years without renewal option, on âas is where isâ basis, on Upfront Premium basis, through tender-cum-auction with First Rights of Refusal to the Ex-lessee.   25-Jul-2017 17:30:00 24-Aug-2017 16:30:00 View
103 Allotment of about 28,328 sq.mtrs. of land in Industrial Zone of Haldia Dock Complex on long term lease of 30 years without renewal option, on âas is where isâ basis, on Upfront Premium basis, through tender-cum-auction with First Rights of Refusal to the Ex-lessee.   25-Jul-2017 17:30:00 24-Aug-2017 16:30:00 View
104 Allotment of land altogether msg about 175147.66 sq. mtrs in Industrial Zone of HDC on long term lease of 30 years without renewal option, on âas is where isâ basis(i.e. including Factory premises and Plant Installation, which are established by Ex-lessees i.e. M/s. Tata Chemicals Ltd.), on Annual Lease Rent basis...19-July-2017   28-Jun-2017 17:00:00 19-Jul-2017 16:00:00 View
105 Allotment of land msg. about 13623.42 sq.mtrs. in Dock Zone of Haldia Dock Complex on long term lease of 30 years without renewal option, on âas is where isâ basis(i.e. including Storage tank for Phosphoric Acid and Dry Bulk Cargo, buildings, etc. which are established by Exlessees i.e. M/s. Tata Chemicals Ltd.), on Annual Lease Rent basis...19-July-2017   28-Jun-2017 17:00:00 19-Jul-2017 16:00:00 View
106 Installation and commissioning of 20 Mbps bandwidth Non-BSNL leased line Internet connection at Haldia Dock Complex, Kolkata Port Trust...30-June-2017   09-Jun-2017 14:30:00 30-Jun-2017 15:30:00 View
107 Survey of KoPT land at Haldia, Preparation of Geo-referenced maps, Digitization of records and Publishing of the information over www
» ADDENDUM CUM REPLY TO QUERIES
06-Jun-2017 17:30:00 28-Jul-2017 15:30:00 View
108 Allotment of 6585 sq.mtrs. of land in Dock Zone of Haldia Dock Complex on long term lease of 30 years without renewal option, on âas is where isâ basis, on Upfront Premium basis, to willing tenderers through tender-cum-auction with First Rights of Refusal to the Ex-lessee (IMC Ltd.)   29-May-2017 17:30:00 22-Jun-2017 16:00:00 View
109 Engagement of Consultant for Detailed Study on Identification of Suitable commercial use of vacant and occupied land at Haldia Dock Complex...31-May-2017   25-May-2017 10:00:00 31-May-2017 14:30:00 View
110 Supply of dry maxi cab under Haldia Dock Complex   25-May-2017 15:30:00 19-Jun-2017 15:30:00 View
111 Allotment of 14 no parcels of land msg. about 100 sq. mtrs. each in various Zone of Haldia Dock Complex at Haldia on “as is where is” basis for Installation of telecommunication infrastructure through tender-cum-auction...13-June-2017   19-May-2017 14:00:00 13-Jun-2017 16:00:00 View
112 Allotment of covered space/land and water body at Chiranjibpur area covering the Dock and Industrial Zone of Haldia Dock Complex...23-June-2017   19-May-2017 14:00:00 23-Jun-2017 16:00:00 View
113 Installation and commissioning of 20 Mbps bandwidth NON-BSNL Leased Line Internet connection at Haldia Dock Complex, Kolkata Port Trust   15-May-2017 15:00:00 07-Jun-2017 15:30:00 View
114 Engagement of consultant for detailed study on identification of suitable commercial use of vacant and occupied land at Haldia Dock Complex   15-May-2017 17:30:00 31-May-2017 14:30:00 View
115 Supply and delivery of seasonal flower seeds, seedlings, rooted cutting, bulbs etc on annual rate contract basis for beautification work at offices,parks and gardens in HDC area, Haldia during the year 2017-18...09-June-2017   12-May-2017 12:45:00 09-Jun-2017 15:00:00 View
116 Allotment of covered space/land and waterbody at Chiranjibpur area covering the Dock and Industrial Zone of Haldia Dock Complex, as described in Annex-A, on license and as is where is basis for a period of 5 years for the purpose as described in Annex-A through tender-cum-auction with first right of refusal to the existing licensee...23-June-2017   12-May-2017 12:45:00 23-Jun-2017 16:00:00 View
117 Allotment of land msg. about 13623.42 sq.mtrs. in Dock Zone of Haldia Dock Complex on long term lease of 30 years without renewal option, on âas is where isâ basis(i.e. including Storage tank for Phosphoric Acid and Dry Bulk Cargo, buildings, etc. which are established by Exlessees i.e. M/s. Tata Chemicals Ltd.), on Annual Lease Rent basis, to willing tenderers through tender-cum-auction with First Rights of Refusal to the ex-lessee...06-June-2017
» EXTENSION NOTICE
» ADDENDUM
09-May-2017 11:15:00 20-Jun-2017 16:00:00 View
118 Allotment of land altogether msg about 175147.66 sq. mtrs in Industrial Zone of HDC on long term lease of 30 years without renewal option, on âas is where isâ basis(i.e. including Factory premises and Plant Installation, which are established by Ex-lessees i.e. M/s. Tata Chemicals Ltd.), on Annual Lease Rent basis, to willing tenderers through tender-cum-auction with First Rights of Refusal to the ex-lessee...06-June-2017
» EXTENSION NOTICE
» ADDENDUM
09-May-2017 11:15:00 20-Jun-2017 16:00:00 View
119 Supply & Operation of motor cab/ maxi cab under Haldia Dock Complex...25-May-2017   03-May-2017 13:15:00 25-May-2017 15:30:00 View
120 Allotment of 14 no parcels of land msg. about 100 sq. mtrs. each in various Zone of Haldia Dock Complex at Haldia...17-May-2017
» CORRIGENDUM
13-Apr-2017 17:00:00 17-May-2017 16:00:00 View
121 âAllotment of 100 sq.mtrs. of land in the Commercial Zone of Haldia Dock Complex on long term lease of 30 years, on âas is where isâ basis(i.e. including buildings, structures, etc.which are established by THE CITIZENâS, Ex-lessees) without renewal option, on upfront basis,to willing tenderers through tender-cum-auction with First Right of Refusal to the ex-lesseeâ.20-Apr-2017   27-Mar-2017 12:30:00 20-Apr-2017 16:00:00 View
122 Supply, installation & commissioning of 200 Desktop Computers along with 200 UPS systems with 5-year comprehensive onsite warranty at Haldia Dock Complex, Kolkata Port Trust
» PRE BID MEETING QUERIES & CLARIFICATION
14-Mar-2017 14:00:00 13-Apr-2017 15:30:00 View
123 Supply, installation and commissioning of one online UPS along with 5-year comprehensive onsite warranty at Haldia Dock Complex, Kolkata Port Trust   03-Mar-2017 10:30:00 28-Mar-2017 15:30:00 View
124 Engagement of Consultant for detailed study on identification of suitable commercial use of vacant & occupied land at Haldia Dock Complex
» CORRIGENDUM
03-Mar-2017 17:30:00 25-Apr-2017 16:00:00 View
125 E-Tender invited from Port Users for allotment of covered space/land and waterbody at Chiranjibpur area covering the Dock and Industrial Zone of Haldia Dock Complex   23-Feb-2017 16:30:00 06-Apr-2017 16:00:00 View
126 EMPANELMENT OF VALUERS FOR CARRYING OUT VALUATION OF IMMOVABLE PROPERTIES AT HALDIA DOCK COMPLEX   16-Feb-2017 13:30:00 09-Mar-2017 15:00:00 View
127 Supply & Operation of buses under Haldia Dock Complex   10-Feb-2017 11:30:00 02-Mar-2017 15:00:00 View
128 Allotment 15000 sq. mtrs. of land on lease for a period of 30 years on as-is-where-is-basis in the Dock Zone of Haldia Dock Complex...23-Feb-2017   19-Jan-2017 16:00:00 23-Feb-2017 16:00:00 View
129 Allotment of 6585 sq.mtrs. of land on long term lease of 30 years without renewal option, on âas is where isâ basis, on Upfront Premium basis, to willing tenderers through tender-cumauction with First Rights of Refusal to the Ex-lessee...13-Feb-2017   13-Jan-2017 13:15:00 13-Feb-2017 16:00:00 View
130 Allotment of 6474.968 sq. mtrs. of land in Residential Zone Of Haldia Dock Complex on long term lease of 30 years without renewal option...13-Feb-2017   13-Jan-2017 13:15:00 13-Feb-2017 16:00:00 View
131 Setting up of Edible Oil Refinery and/or storage and distribution of liquid cargo other than class A & B POL products...17-Feb-2017
» Reply to the queries
» EXTENSION NOTICE
» ADDENDUM
05-Jan-2017 10:00:00 24-Feb-2017 16:00:00 View
132 Allotment of KoPT land msg. about 7000 sq. mtrs. in three plots namely Plot âAâ & âBâ msg.2500 sq. mtrs each...27-Jan-2017   31-Dec-2016 10:00:00 27-Jan-2017 16:00:00 View
133 Allotment of KoPT land msg. about 8575 sq. mtrs. or 2.12 acres in the Industrial Zone of Haldia Dock Complex...27-Jan-2017   31-Dec-2016 10:00:00 27-Jan-2017 16:00:00 View
134 Allotment of 8000 sq.mtrs. of land on long term lease of 30 years without renewal option...30-Jan-2017   30-Dec-2016 14:00:00 30-Jan-2017 16:00:00 View
135 Allotment of 100 sq.mtrs. of land in the Commercial Zone of Haldia Dock Complex...30-JAN-2017   30-Dec-2016 14:00:00 30-Jan-2017 16:00:00 View
136 Allotment of KoPT land altogether msg. about 10979 (6054+4925) sq. mtrs. Or 2.71 acres in the Dock Zone...30-Jan-2017   30-Dec-2016 14:00:00 30-Jan-2017 16:00:00 View
137 Allotment of 2833 sq.mtrs of land in the Residential Zone of HDC...30-Jan-2017   30-Dec-2016 14:00:00 30-Jan-2017 16:00:00 View
138 Supply & operation of Motor cabs/Maxi cabs under Haldia Dock Complex   26-Dec-2016 17:20:00 17-Jan-2017 15:30:00 View
139 Allotment of KoPT land msg. about 40468.55 sq. mtrs. or 10 acres in the Industrial Zone of Haldia Dock Complex at Haldia...02-Feb-2016
» CORRIGENDUM AND REPLY TO QUERIES
» EXTENSION NOTICE
» ADDENDUM
22-Dec-2016 16:30:00 21-Feb-2017 16:00:00 View
140 Supply,Installation, Operation and Maintenance of Road Weighbridges at HDC, KoPT...20-Jan-2017   09-Dec-2016 11:15:00 20-Jan-2017 16:00:00 View
141 Transportation of papers and other materials between Administration office, Jawahar Tower...23-Dec-2016   09-Dec-2016 17:00:00 23-Dec-2016 15:00:00 View
142 Supply and operation of launches for river patrolling at Haldia...28-Dec-2016   06-Dec-2016 17:15:00 28-Dec-2016 15:30:00 View
143 Allotment of 6474.968 sq. mtrs. of land in Residential Zone Of Haldia Dock Complex on long term lease of 30 years without renewal option, on as is where is basis.   28-Nov-2016 17:30:00 03-Jan-2017 16:00:00 View
144 Allotment of KoPT land msg. about 5261 sq.mtrs in Residential Zone of HDC on long term lease of 30 years without renewal option, on âas is where isâ basis.   28-Nov-2016 17:30:00 03-Jan-2017 16:00:00 View
145 Allotment of covered space/land and waterbody at Chiranjibpur area covering the Dock and Industrial Zone of Haldia Dock Complex
» Corrigendum
25-Nov-2016 17:30:00 06-Jan-2017 16:00:00 View
146 Supply & Operation of motor cab / maxi cab under Haldia Dock Complex   24-Nov-2016 16:30:00 16-Dec-2016 15:30:00 View
147 Transportation of papers and other materials between Administration Office...08-Dec-2016   19-Nov-2016 10:00:00 08-Dec-2016 15:00:00 View
148 Supply & fogging of Deltamethrin or equivalent with Fogger Machine for the control of mosquito...10-Nov-2016   19-Oct-2016 13:30:00 10-Nov-2016 15:15:00 View
149 Disposal of logs and firewood belonging to Haldia Dock Complex, Kolkata Port Trust...15-Nov-2016   14-Oct-2016 11:30:00 15-Nov-2016 15:00:00 View
150 Supply & Operation of motor cab under Haldia Dock Complex...28-Oct-2016   05-Oct-2016 14:00:00 28-Oct-2016 15:30:00 View
151 SUPPLY OF DRY MAXI CAB (INNOVA) UNDER HALDIA DOCK COMPLEX   04-Oct-2016 17:30:00 27-Oct-2016 15:30:00 View
152 Allotment of different plots of land on long term lease of 30 years without renewal option, on ‘as is where is’ basis   01-Oct-2016 17:30:00 04-Nov-2016 16:00:00 View
153 Allotment of different plots of land on long term lease of 30 years without renewal option, on as is where is basis.
» Corrigendim
01-Oct-2016 17:30:00 04-Nov-2016 16:00:00 View
154 Allotment of different plots of land on long term lease of 30 years without renewal option, on as is where is basis
» CORRIGENDUM
01-Oct-2016 17:30:00 18-Nov-2016 16:00:00 View
155 Design,construction,supply,testing,commissioning and hand over of 1 no multipurpose foam crash...20-Oct-2016   30-Sep-2016 14:45:00 20-Oct-2016 15:00:00 View
156 Allotment of KoPT land msg. about 8575 sq. mtrs. or 2.12 acres in the Industrial Zone...04-Nov-2016   28-Sep-2016 16:30:00 04-Nov-2016 16:00:00 View
157 Allotment of KoPT land msg. about 7000 sq. mtrs. in three plots namely Plot âAâ & âBâ msg.2500 sq. mtrs...04-Nov-2016   28-Sep-2016 16:40:00 04-Nov-2016 16:00:00 View
158 SETTING UP A LIQUID CARGO HANDLING JETTY AT SHALUKKALI, HALDIA DOCK - II
» REPLIES TO QUERIES
» Extension Notice
12-Sep-2016 17:30:00 18-Nov-2016 15:00:00 View
159 Supply & fogging of Deltamethrin 1.25 W/W or 1% W/V...14-Oct-2016   10-Sep-2016 12:30:00 14-Oct-2016 15:15:00 View
160 Allotment of KoPT land in the Industrial Zone of Haldia Dock Complex at Haldia..25-Oct-2016
» Addendum & Pre bid queries
» CORRIGENDUM
07-Sep-2016 16:30:00 16-Nov-2016 16:00:00 View
161 Supply & operation of buses...09-Sep-2016   20-Aug-2016 10:30:00 09-Sep-2016 15:00:00 View
162 Supply & Operation of buses...19-Aug-2016   28-Jul-2016 16:50:00 19-Aug-2016 15:00:00 View
163 Setting up of Outer Terminal-I alongwith all required associated facilities on Design, Build, Finance, Operate, Transfer basis at Haldia Dock Complex
» ADDENDUM
» REPLY TO QUERIES
» ADDENDUM II
22-Jun-2016 18:30:00 15-Sep-2016 15:00:00 View
164 Setting up of mooring facilities at deep draft location for Transshipment of liquid cargo..11-Aug-2016
» ADDENDUM
» REPLY TO QUERIES
» ADDENDUM II
» ADDENDUM III
17-Jun-2016 18:30:00 15-Sep-2016 15:00:00 View
165 Supply and delivery of seasonal flower seeds, seedlings, rooted cuttings, bulbs...13-July-2016   15-Jun-2016 13:30:00 13-Jul-2016 13:00:00 View
166 Design, construction, supply, testing, commissioning and handing over foam crash tender including procurement of chassis with complete fire fighting equipment etc.
» PRE-BID MEETING QUERIES AND CLARIFICATION
24-Feb-2016 20:00:00 28-Mar-2016 15:00:00 View
167 Allotment of different plots of land on long term lease of 30 years, on as is where is basis without renewal option, on Annual Lease Rent basis.
» EXTENSION NOTICE
12-Feb-2016 11:00:00 18-Mar-2016 16:01:00 View
168 2)Allotment of different plots of land on long term lease of 30 years, on as is where is basis without renewal option, on Annual Lease Rent basis.
» EXTENSION NOTICE
12-Feb-2016 12:00:00 18-Mar-2016 16:01:00 View
169 SUPPLY, INSTALLATION, COMMISSIONING, OPERATING AND MAINTAINING RFID BASED PORT ACCESS CONTROL AND TRACKING SYSTEM
» CORRIGENDUM
» REPLY TO QUERIES ALONGWITH CORRIGENDUM/ADDENDUM
» CORRIGENDUM III
29-Jan-2016 17:00:00 19-Feb-2016 15:01:00 View
170 Hiring of one dry motor cab AC   20-Jan-2016 16:30:00 10-Feb-2016 15:30:00 View
171 SUPPLY, INSTALLATION, COMMISSIONING, OPERATING & MAINTAINING RFID BASED PORT ACCESS CONTROL AND TRACKING SYSTEM AT HDC
» REPLY TO QUERIES AND CORRIGENDUM
25-Dec-2015 11:00:00 27-Jan-2016 15:30:00 View
172 Allotment of KoPT land altogether msg. about 10979 (6054+4925) sq. mtrs. Or 2.71 acres in the Dock Zone of Haldia Dock Complex   19-Dec-2015 14:00:00 28-Jan-2016 16:00:00 View
173 Allotment of Different Plots of Land on Long Term Lease on as is Where is Basis   19-Dec-2015 14:00:00 28-Jan-2016 16:00:00 View
174 2) Allotment of Different Plots of Land on Long Term Lease on as is Where is Basis   19-Dec-2015 14:00:00 28-Jan-2016 16:00:00 View
175 Allotment of KoPT land altogether msg. about 60702.82 sq. mtrs. Or 15 acres in the Dock Zone of HDC   19-Dec-2015 14:00:00 28-Jan-2016 16:00:00 View
176 Allotment of KoPT land altogether msg. about 600 sq. mtrs.in the Dock Zone of HDC   19-Dec-2015 14:00:00 28-Jan-2016 16:00:00 View
177 Allotment of KoPT land in Dock zone   03-Dec-2015 15:00:00 08-Jan-2016 16:00:00 View
178 abc   01-Dec-2015 14:00:00 01-Dec-2015 15:00:00 View
179 SETTING UP OF FLOATING CRANE FACILITIES TO INCREASE LIGHTENING/TOPPING UP OF CARGO AT SAGAR/OTHER DEEP DRAFT LOCATIONS IN THE WATER LIMIT OF KOPT
» REPLY TO QUERIES ALONGWITH CORRIGENDUM/ADDENDUM
28-Nov-2015 00:00:00 14-Jan-2016 15:00:00 View
180 Setting up of a liquid jetty at Shalukkali for handling of liquid cargo   05-Nov-2015 16:30:00 18-Dec-2015 15:00:00 View
181 Setting up of Infrastructure/ Facilities at Haldia Dock Complex
» CORRIGENDUM
05-Nov-2015 16:00:00 18-Dec-2015 15:00:00 View
182 Setting up of Project facilities at Haldia Dock -II, Shalukkali   05-Nov-2015 16:00:00 16-Dec-2015 15:00:00 View
183 Allotment of KoPT land in Dock zone of Haldia Dock Complex at Haldia
» EXT. CUM CORRIGENDUM
01-Oct-2015 16:00:00 02-Dec-2015 14:30:00 View
184 Installation, Configuration, Testing and Commissioning of 20 MBPS Bandwidth Non-BSNL Leased Line Internet Connection at HDC, KOPT   24-Sep-2015 12:00:00 28-Oct-2015 15:30:00 View
185 Supply of One Hundred Fifty (150) nos. Volume (paper)Licenses along with Two (2) nos. Media of Microsoft Office Standard 2013 or better at HDC, KoPT   24-Sep-2015 13:00:00 15-Oct-2015 15:30:00 View
186 Setting up of a POL jetty for handling of Liquid Cargo
» PRE BID REPLIES AND ADDENDUM
16-Sep-2015 13:00:00 30-Oct-2015 15:00:00 View
187 Tender for Supply of 150 Nos. Volume (Paper) Licenses along with 2 Nos. Media of Microsoft Office Standard 2013 or Better at HDC, KOPT.   01-Sep-2015 16:00:00 22-Sep-2015 15:30:00 View
188 Installation, Configuration, Testing and Commissioning of NON-BSNL Leased Line Internet connection   21-Aug-2015 16:00:00 15-Sep-2015 15:30:00 View
189 Hiring of Armed & Unarmed Security Personnel for Security and Surveillance
» ADDENDUM
04-Aug-2015 16:00:00 11-Sep-2015 15:30:00 View
190 Supply, Installation, Configuration & commissioning of Enterprise Anti-'X' protection solution
» CORRIGENDUM
31-Jul-2015 10:00:00 31-Aug-2015 15:30:00 View
191 Disposal of logs and firewood   31-Jul-2015 13:00:00 24-Aug-2015 15:00:00 View
192 Setting up of Mooring Facilities at deep draft location for Transhipment   21-Jul-2015 14:00:00 25-Aug-2015 15:00:00 View
193 Installation, Configuration, Testing and Commissioning of 20 Mbps bandwidth NON-BSNL Leased Line Internet connection   30-Jun-2015 16:00:00 23-Jul-2015 15:30:00 View
194 Quotation Invited for Annual Maintenance Contract Of 05 Nos. Aquaguard Water Purifiers Installed at Different Locations of ADMN DIV., At HDC   17-Jun-2015 13:00:00 30-Jun-2015 15:00:00 View
195 Supply and Delivery of Seasonal Flower seeds, Seedlings, Rooted Cuttings, Bulbs etc.   12-Jun-2015 11:00:00 07-Jul-2015 15:00:00 View
196 E-Tender for Repairing, Painting and Commissioning of Foam Crash Tender   18-May-2015 13:00:00 17-Jun-2015 15:30:00 View
197 Setting up of Mooring Facilities at Deep Draft Location within the Limits of KoPT for Transshipment of Liquid Cargo for HDC.
» CORRIGENDUM I
» CORRIGENDUM I I
» CORRIGENDUM I
» CORRIGENDUM II
28-Apr-2015 13:00:00 01-Jul-2003 00:00:00 View
198 Setting Up OF Mooring Facilities At Deep Draft Location Within The Limits Of Kolkata Port Trust For Transhipment Of Liquid Cargo For Haldia Dock Complex, Kolkata Port Trust
» CORRIGENDUM I
» CORRIGENDUM I I
28-Apr-2015 13:00:00 15-Jul-2015 15:00:00 View
199 Commissioning Of Camera Surveillance Solution At Haldia Dock Complex,Kolkata Port Trust
» REPLY TO PRE BID MEETING QUERIES
13-Apr-2015 17:00:00 05-May-2015 15:30:00 View
200 Allotment of KoPT land in the Dock Zone of Haldia Dock Complex at Haldia for setting up of storage and distribution of liquid cargo other than POL products
» EXTENSION NOTICE
01-Apr-2015 12:00:00 26-May-2015 14:30:00 View
201 Allotment of KoPT land in the Industrial Zone of Haldia Dock Complex at Haldia for setting up of POL storage and distribution facilities etc.
» EXTENSION NOTICE
01-Apr-2015 12:00:00 29-May-2015 14:30:00 View
202 Supply, Installation & Operation of Photocopier Machine
» CORRIGENDUM I
» CORRIGENDUM II
» CORRIGENDUM III
27-Mar-2015 11:00:00 17-Apr-2015 15:30:00 View
203 Comissioning of Camera Surveillance
» CORRIGENDUM
02-Mar-2015 11:00:00 07-Apr-2015 15:00:00 View
204 Disposal of Logs and Firewoods   20-Feb-2015 11:00:00 23-Mar-2015 15:00:00 View
205 Survey of Land & Developement and Maintenance of Web based Land Asset Management System
» ADDENDUM
17-Feb-2015 11:00:00 16-Mar-2015 15:30:00 View
206 Allotment of KoPT land in the Industrial Zone of Haldia Dock Complex at Haldia
» ADDENDUM AND EXTENSION
21-Jan-2015 11:00:00 13-Mar-2015 16:00:00 View
207 AD/0076/D/2014   30-Apr-2014 00:00:00 20-Jun-2014 14:30:00 View
208 Ad/007/Computer/Others/91   03-Apr-2014 00:00:00 03-Apr-2014 00:00:00 View
209 Ad/007/Peripherals/2014   25-Feb-2014 00:00:00 25-Mar-2014 15:30:00 View
210 Ad/007/Computer/Peripherals/2013
» CORRIGENDUM AND EXTENSION
22-Jan-2014 00:00:00 10-Mar-2014 15:30:00 View
211 Ad/0071/Transloading/ 2013 14
» APPLICATION SEEKING DOCUMENT
07-Jan-2014 00:00:00 10-Jan-2014 14:30:00 View
212 Ad/P&G/2013/1
» EXTENSION
23-Dec-2013 00:00:00 07-Feb-2014 15:00:00 View
 
Civil Engg. Department
S.No Title & Ref.No Corrigendums Published Date Bid Open Date Details
1 Foundation work of the commemorative statue being erected by Sri Tapas Sarkar at Millenium Park III...-10-Sept-2020
» CORRIGENDUM-I
10-Sep-2020 11:45:00 25-Sep-2020 14:00:00 View
2 Replacement of existing false ceiling with gypsum board false ceiling including M.S Structural framework and other allied works for airconditioning inside shed of Kantapukur Parade ground...-08-Sept-2020
» CORRIGENDUM -I
08-Sep-2020 16:20:00 29-Sep-2020 14:00:00 View
3 Upkeepment and maintenance of office of the Superintending Engineer (KPD) including surrounding area at 51,C.G.R road...-04-Sept-2020
» CORRIGENDUM-I
04-Sep-2020 14:02:00 25-Sep-2020 14:00:00 View
4 Petty repair works to Sister Nivedita Abasan, Sheds, Buildings, other structures, CISF Barrack and CISF Parade Ground...-02-Sept-2020   02-Sep-2020 18:02:00 23-Sep-2020 15:00:00 View
5 Maintenance of Garden at Dock Training Institute, at 51 CGR road, near 4 No. Gate KPD Dk. I (W) and near toilet at shed no 28 Dock-II...-02-Sept-2020
» CORRIGENDUM-I
02-Sep-2020 16:16:00 29-Sep-2020 15:00:00 View
6 Petty Misc repairs to shed buildings, goomties at Dock-II (East and West) area, K. P. Docks...-02-Sept-2020   02-Sep-2020 18:33:00 22-Sep-2020 15:00:00 View
7 Miscellaneous petty works at Rabindra Setu deck, approach footpath including flyover & Rabindra Setu Office, Rabindra Setu Traffic Guard Office...-01-Sept-2020
» CORRIGENDUM -I
01-Sep-2020 12:10:00 18-Sep-2020 14:00:00 View
8 Miscellaneous petty repairs at Subhash Bvavan, Hydraulic Model, Loco Shed, Nimak Mahal Quarter, PSO office,8 no. Work Shop under NSD Division...-01Sept-2020   01-Sep-2020 14:10:00 24-Sep-2020 14:00:00 View
9 Reconstruction of the collapsed river side boundary wall and dilapidated river side boundary wall of Hugli Point semaphore...-27-Aug-2020
» CORRIGENDUM-I
27-Aug-2020 12:16:00 15-Sep-2020 14:00:00 View
10 Repairing and replacement of damaged fenders and supplying, fixing S/H lorry/tractor tyre and other miscellaneous work at Dock no. -1 ( East & West) of K. P. Docks...-26-Aug-2020
» CORRIGENDUM -I
» CORRIGENDUM -II
26-Aug-2020 13:45:00 28-Sep-2020 14:00:00 View
11 Electric tower fencing by RCC drop wall (300 mm from G.L) , repairing of Approach portion of yard /road junction , restoration of culvert and drainage system inside N.S Dock...-25-Aug-2020
» CORRIGENDUM-I
25-Aug-2020 11:38:00 18-Sep-2020 14:00:00 View
12 Provide service of labour at different area for emergency misc. work (Non-measurable) under N.S. Dock section...-25-Aug-2020   25-Aug-2020 14:05:00 15-Sep-2020 15:00:00 View
13 Providing 07 (Seven) nos Movable Security Booths for different areas inside N. S. Dock...-25-Aug-2020   25-Aug-2020 14:23:00 09-Sep-2020 15:00:00 View
14 Strengthening and extension of Nischintapur Jetty at Nischintapur and other ancillary works of Nischintapur Base Camp, South 24 Parganas...-24-Aug-2020
» CORRIGENDUM-I
24-Aug-2020 14:31:00 16-Sep-2020 14:00:00 View
15 Thorough renovation of Main office, Police barrack, Ladies hostel, Canteen, Toilet blocks and rising of boundary wall...-24-Aug-2020   24-Aug-2020 14:43:00 16-Sep-2020 14:00:00 View
16 Petty plumbing and sanitary works at Dock-1 (East), Dry Dock area and C.M.M. Compound to Mooring Masters' Office, Tuktaghat...-24-Aug-2020   24-Aug-2020 18:16:00 16-Sep-2020 15:00:00 View
17 Cleaning and disinfecting different types & size of drinking water tanks inside & outside dock under NSD section...-19-Aug-2020   19-Aug-2020 12:16:00 04-Sep-2020 15:00:00 View
18 Cutting and trimming branches of trees, Jungle Cutting and Removing of Jungle and Cleaning of Hyacinth at different areas inside and outside of N. S. Dock...-19-Aug-2020   19-Aug-2020 12:30:00 09-Sep-2020 15:00:00 View
19 Patch repairing to the carriageways of different roads (Hide Road, Coal Dock Road , Kantapukur Road, Oil Installation Road...-19-Aug-2020   19-Aug-2020 14:18:00 09-Sep-2020 14:00:00 View
20 Reconstruction and strengthening of existing dilapidated approach road for pre-gate facility at M&Q truck parking yard...-18-Aug-2020   18-Aug-2020 11:50:00 28-Aug-2020 15:00:00 View
21 Construction of proposed Boundary Wall, Container Office and other miscellaneous work related to Pre Gate at M&Q truck parking yard...-18-Aug-2020   18-Aug-2020 12:02:00 28-Aug-2020 15:00:00 View
22 Supply of unskilled labour at any location (both inside and outside dock area) for different miscellaneous works (non-measurable) under K.P. Docks...-18-Aug-2020   18-Aug-2020 15:21:00 08-Sep-2020 15:00:00 View
23 E-Tender for Operation of pump motor set at A Shed reservoir including valve operation in connection with the supply of water to passenger vessel...-18-Aug-2020   18-Aug-2020 15:34:00 10-Sep-2020 15:00:00 View
24 Petty Plumbing & Sanitary works of Subhas Bhaban, Nimak Mahal Officers Quarter, 8 No. Workshop, P-65, PSO Complex, Loco Shed...-17-Aug-2020   17-Aug-2020 16:33:00 04-Sep-2020 15:00:00 View
25 Supply of daily labour at various sites of River Training Wing for carrying out miscellaneous works...-13-Aug-2020   13-Aug-2020 14:03:00 11-Sep-2020 15:30:00 View
26 Pest controlling to the Fair-weather House Institute, Hide Road Institute and 51 CGR Road (old building...-10-Aug-2020   10-Aug-2020 15:32:00 01-Sep-2020 15:00:00 View
27 Development of green wall from beside toilet block opposite to shed no. 28 to N-W corner of the boundary wall adjacent to ETC Agro...-04-Aug-2020   04-Aug-2020 17:52:00 25-Aug-2020 15:00:00 View
28 Petty plumbing and sanitary works at Dock-II (East & West), Sister Nivedita Abasan, Kantapukur CISF Barrack,..-04-Aug-2020   04-Aug-2020 16:02:00 26-Aug-2020 15:00:00 View
29 Supply of unskilled labour at any location (both inside and outside dock area) for different miscellaneous works...-03-Aug-2020
» CORRIGENDUM-I
03-Aug-2020 15:30:00 26-Aug-2020 15:00:00 View
30 Pumping out of stagnated water from any location (both inside and outside Dock area) under K.P.Docks...-03-Aug-2020   03-Aug-2020 16:27:00 26-Aug-2020 15:00:00 View
31 Pumping out of stagnated water from any location (both inside and outside Dock area) under K.P.Docks...-03-Aug-2020   03-Aug-2020 16:27:00 26-Aug-2020 15:00:00 View
32 Development of green wall in between Gate no.1 KPD to Swing bridge wicket gate at Dock-1 (East) K.P.Docks...-31-July-2020   31-Jul-2020 12:08:00 12-Aug-2020 15:00:00 View
33 Operation of fresh water Centrifugal pumps at Nimak Mahal Officers Quarters Campus & Subhas Bhavan...-30-July-2020   30-Jul-2020 14:46:00 20-Aug-2020 15:00:00 View
34 Development of gardens at different areas of N.S.DOCKS and maintenances of the same...-30-July-2020   30-Jul-2020 14:58:00 26-Aug-2020 14:00:00 View
35 Cleaning of existing drain including repairs the minor damaged portion inside N S DOCK and Alifnagar area...-30-July-2020   30-Jul-2020 15:05:00 26-Aug-2020 14:00:00 View
36 Repairing and facelifting of boundary wall at both sides of Kantapukur shed area from Jagannath temple to Remount Road...22-July-2020   22-Jul-2020 12:51:00 14-Aug-2020 14:00:00 View
37 General maintenance for upkeeping of Civil Engineering Office and accommodation and providing services of a cook cum attendant...--20-July-2020   20-Jul-2020 15:10:00 08-Aug-2020 15:30:00 View
38 Thorough inside & outside renovation, facelifting works of the Control room of Bascule Bridge...20-July-2020   20-Jul-2020 15:30:00 13-Aug-2020 14:00:00 View
39 Thorough repairs and renovation to inside & outside of quarters No. 15 B including plumbing & sanitary works...-20-July-2020   20-Jul-2020 15:41:00 13-Aug-2020 14:00:00 View
40 PREPARATION OF FEASIBILITY REPORT FOR SELECTION OF APPROPRIATE EVACUATION ROUTE FOR DIRECT CONNECTIVITY OF NETAJI SUBHAS DOCK TO NATIONAL HIGHWAY...16-July-2020
» CORRIGENDUM-I
» NOTICE II
16-Jul-2020 15:50:00 25-Aug-2020 15:00:00 View
41 Providing assistance for Upkeepment of office premises of Superintending Engineer (N.S.D) at 51,C.G.R road,..-09-July-2020   09-Jul-2020 14:31:00 29-Jul-2020 15:00:00 View
42 Operation & maintenance of Water Treatment Plant at N.S. Dock near 4, NSD Gate including operation of Intake Pump Sets....08-July-2020   08-Jul-2020 14:45:00 31-Jul-2020 14:00:00 View
43 Reconstruction of Boundary wall as per ISPS specification, pathway and cutting of uprooted trees damaged due to cyclone BULBUL....-06-July-2020   06-Jul-2020 14:38:00 30-Jul-2020 14:00:00 View
44 Petty Miscellaneous repairing works at Centenary Hospital, Hospital Park Quarters, CISF Guest House, DRM office ...02-July=2020   02-Jul-2020 15:05:00 24-Jul-2020 14:00:00 View
45 Periodical cleaning of muck , slush and allied deposited materials for open surface drains, covered drains at Remount Road...01-July-2020   01-Jul-2020 13:40:00 23-Jul-2020 14:00:00 View
46 Petty Miscellaneous repairing works and other ancillary works including Jungle cutting at Sector - 1 to 5 ,New taratala colony & CISF qtrs....01-June-2020   01-Jul-2020 14:33:00 23-Jul-2020 14:00:00 View
47 Sinking of Tube Well (50mm x 100mm. dia) and other ancillary works at khejuri Base Camp...26-June-2020   26-Jun-2020 15:37:00 14-Jul-2020 15:30:00 View
48 Revamping of various approaches of lessees over Drain at HIDE Road by laying HUME PIPE and Concrete Slab...22-June-2020
» CORRIGENDUM-I
» CORRIGENDUM-II
22-Jun-2020 10:35:00 08-Jul-2020 14:00:00 View
49 Repairs to the Pintle Assembly at Lock Entrance Sill and other allied works at the bottom of Eastern leaf of the inner Lock Gate...-22-June-2020
» CORRIGENDUM-I
22-Jun-2020 15:35:00 21-Jul-2020 14:00:00 View
50 Temporary Bamboo Walkway (XIX) at Basin Complex of Shore Based Pilot Station, at Sagar Islan...17-June-2020
» CORRIGENDUM-I
17-Jun-2020 17:06:00 09-Jul-2020 14:00:00 View
51 Carrying out the work of day to day sanitisation at different office premises / operational / residential areas of Kolkata Dock System and outstation Ko.P.T installations within 24 Parganas including supply of required manpower , transport , chemicals, consumables etc. for a period of four months from the date of placement of work order at Kolkata Port Trust
» Corrigendum-I
03-Jun-2020 18:00:00 12-Jun-2020 14:00:00 View
52 Cleaning operation of the entire inside & outside of Central Record and Documentation Centre...-16-March-2020
» Corrigendum-I
17-Mar-2020 11:13:00 21-Apr-2020 14:00:00 View
53 Development of green area beside No-4 Gate NSD for parking of trailer / lorry inside of N.S Dock...-13-March-2020
» CORRIGENDUM-II
13-Mar-2020 11:55:00 12-May-2020 15:00:00 View
54 Supply of manpower for operating / running automatic organic waste composting machine at Portland Park...-13-March-2020
» CORRIGENDUM
13-Mar-2020 17:48:00 23-Mar-2020 15:00:00 View
55 Maintenance and upkeepment of clay tennis court at Kantapukur CISF Barrack...-10-March-2020   10-Mar-2020 10:44:00 27-Mar-2020 15:00:00 View
56 Replacement of old damaged G.C.I sheet and other miscellaneous repair works at the Shed No.- 4...-10-March-2020
» Corrigendum-I
10-Mar-2020 12:28:00 21-Apr-2020 14:00:00 View
57 Supply of manpower for operating / running automatic organic waste composting machine at Portland Park...-28-February-2020   28-Feb-2020 11:08:00 11-Mar-2020 15:00:00 View
58 Petty Miscellaneous repair works including plumbing and sanitary works at KoPT Campus at Nischintapur...-27-February-2020   27-Feb-2020 12:32:00 19-Mar-2020 14:00:00 View
59 Repairing of existing G.I. Pipe railings including replacement of members wherever necessary...-25-February-2020   25-Feb-2020 09:30:00 18-Mar-2020 15:00:00 View
60 Construction of boundary wall as per ISPS Specification surrounding the Pilot Station Campus at Sagar...-25-February-2020   25-Feb-2020 16:35:00 19-Mar-2020 15:00:00 View
61 Upgradation of Transport Depot Road (from Hide Road Junction to Goragacha Level Crossing)...17-Feb-2019
» CORRIGENDUM-I
» CORRIGENDUM-II
17-Feb-2020 13:45:00 19-Mar-2020 15:00:00 View
62 Removal of refuse, garbage etc from the different offices, residential colonies of KoPT...14-February-2020   14-Feb-2020 11:53:00 06-Mar-2020 14:00:00 View
63 Construction and erection of wind barrier system for dust control from berth 15 to berth 20 of coal berth area...-14-February-2020
» CORRIGENDUM-I
» CORRIGENDUM-II
» CORRIGENDUM-III
» CORRIGENDUM-IV
» CORRIGENDUM-VI
14-Feb-2020 13:30:00 12-May-2020 15:00:00 View
64 Supply of truck mounted mechanical road sweeping machine on hire for regular cleaning / sweeping ...-14-February-2020
» CORRIGENDUM-I
14-Feb-2020 14:45:00 06-Mar-2020 14:00:00 View
65 Cleaning of jungles of yard etc. at the operational areas of EJC Yard from Majerhat to Sonodingi...-10-February-2020   10-Feb-2020 13:12:00 26-Feb-2020 15:00:00 View
66 Maintenance of existing landscape and garden of KOPT Centenary Hospital, Quarter Complex...-10-February-2020   10-Feb-2020 13:28:00 26-Feb-2020 15:00:00 View
67 Bank protection measure at Jorabagan area between Jagannath Ghat to Kuntighat of Kolkata...-07-February-2020
» CORRIGENDUM-I
» CORRIGENDUM-II
» CORRIGENDUM-III
» Corrigendum-VII
07-Feb-2020 16:00:00 19-Jun-2020 15:00:00 View
68 Periodical maintenance work of different road inside and outside of Dock area...-31-January-2020   31-Jan-2020 15:26:00 24-Feb-2020 14:00:00 View
69 SELECTION OF A CONSULTANT for Undertaking Study for feasibility Vessel of International Cruise...-27-January-2020
» CORRIGENDUM-I
» CORRIGENDUM-II
» CORRIGENDUM-III
» CORRIGENDUM-V
27-Jan-2020 13:03:00 12-May-2020 15:00:00 View
70 Providing water proofing treatment to roofs of building nos 3,4,5,7, & 8 including Civil Works...-20-January-2020   20-Jan-2020 11:25:00 13-Feb-2020 14:00:00 View
71 Reparing of black top road at Subhash Bhavan, Nimak Mahal compound, Depressed portion of Lybian Warehouse ...-15-January-2020   15-Jan-2020 11:56:00 06-Feb-2020 14:00:00 View
72 Miscellaneous conservancy upkeepment / housekeeping works including plantation and beautification work...-14-January-2020   14-Jan-2020 14:27:00 05-Feb-2020 14:00:00 View
73 Cleaning of silt including removing of left over materials, Garbage mixed with rubbish and all other filthy materials...-14-January-2020   14-Jan-2020 16:29:00 06-Feb-2020 15:00:00 View
74 Thorough repairing and painting to exterior walls and common areas of the buildings no. 1 to 16 (excluding bldg.no.6& 13) at Remount Road..13-January-2020
» Corrigendum I
13-Jan-2020 10:44:00 06-Feb-2020 14:00:00 View
75 Construcion of patrolling track along the boundary wall at Alifnagar Coal Dumping Yard...-09-January-2020   09-Jan-2020 12:59:00 28-Jan-2020 15:00:00 View
76 Providing assistance for upkeepment of the office premises of Superintending Engineer(Dev) at 51, C.G.R. Road...-07-January-2019   07-Jan-2020 14:57:00 31-Jan-2020 14:00:00 View
77 Patch reparing of Sonarpur road star􀆟ng from Jain Kunj crossing to Paharpur Colling Tower...-06-January-2020   06-Jan-2020 17:25:00 30-Jan-2020 14:00:00 View
78 Design,fabrication,supply,test,deliver of one no. Main Pontoon of size 30.00 mx9.25mx1.60m...-03-January-2019
» CORRIGENDUM-I
» CORRIGENDUM-II
03-Jan-2020 13:28:00 07-Feb-2020 14:00:00 View
79 Low cost Strengthening of yard on the north of railway track no. 23 at EJC Yard...-03-January-2019   03-Jan-2020 15:22:00 28-Jan-2020 15:00:00 View
80 Construction of Security Goomty and Toilet block with a Drinking Water Centre...-03-January-2019   03-Jan-2020 15:34:00 28-Jan-2020 14:00:00 View
81 Modification of bays at second floor,Fairlie warehouse into office accomodation...-01-January-2020
» CORRIGENDUM-I
01-Jan-2020 15:14:00 29-Jan-2020 14:00:00 View
82 Repairing of existing G.I. Pipe railings including replacement of members wherever necessary for accessing different parts...-30-December-2019   30-Dec-2019 12:00:00 21-Jan-2020 15:00:00 View
83 Restoration and relaying of water supply line including construction of Trench wherever is necessary and other allied works...-30-December-2019   30-Dec-2019 16:23:00 22-Jan-2020 14:00:00 View
84 Repairing/Renovation of floor and entrance doors of quarter No. 7/2 Dumaynue Avenue quarter...26-December-2019   26-Dec-2019 14:48:00 09-Jan-2020 15:00:00 View
85 Proposed LED Signage Board at approach jetties of KPD & NSD (2 NOS....-23-December-219
» CORRIGENDUM-I
23-Dec-2019 15:33:00 18-Jan-2020 15:00:00 View
86 Development of road as per CRRI scheme including alongside drain and footpath....20-Dec-2019
» CORRIGENDUM-I
20-Dec-2019 16:45:00 31-Jan-2020 15:00:00 View
87 “Providing upkeepment and maintenance of the office under Superintending Engineer(Rly)...20-Dec-2019   20-Dec-2019 16:55:00 10-Jan-2020 15:00:00 View
88 Supply of Daily labours at various sites under Kolkata Section.....18-Dec-2019   18-Dec-2019 15:25:00 09-Jan-2020 15:00:00 View
89 Construction of 7.5 m high separation wall with RCC frame along the N. S. Dry Dock   16-Dec-2019 15:15:00 08-Jan-2020 15:00:00 View
90 Construction of Cross Gantry Path at Basra Yard, NS Dock..12-December-2019   12-Dec-2019 14:34:00 08-Jan-2020 14:00:00 View
91 Refurbishment of PSO’s meeting room and same allied works..-12-December-2019   12-Dec-2019 17:21:00 24-Dec-2019 12:00:00 View
92 Miscelaneous conservancy upkeepment works inside Netaji Subhash Dock Area (including Libyan Ware House and Subhas Nagar CISF Qtrs..-11-December-2019   11-Dec-2019 11:05:00 03-Jan-2020 14:00:00 View
93 Construction of drain from Braithwaite Company to Sonai Road road side drain..-06-December-2019   06-Dec-2019 10:34:00 27-Dec-2019 15:00:00 View
94 One time cleaning / removal of deposited sludge from the sewage pit of Centenary Hospital..-05-December-2019   05-Dec-2019 12:00:00 23-Dec-2019 15:00:00 View
95 Displaying various board/signal/direction and symbols at inside K. P .Dock...-05-December-2019   05-Dec-2019 15:46:00 17-Dec-2019 15:00:00 View
96 Removal of heaped rubbish , stacked earth and cleaning of the dock premises at Dock-II..-05-December-2019   05-Dec-2019 16:11:00 27-Dec-2019 15:00:00 View
97 Supply & installation of rubber fenders inside NSD Dock basin on all berths except 7 NSD berth & other allied works..-05-December-2019
» Corrigendum-I
» Corrigendum II
05-Dec-2019 17:30:00 14-Jan-2020 14:00:00 View
98 Intermediate contract for carrying out miscellaneous conservancy upkeepment works for switching over from different ongoing contracts..-04-December-2019
» CORRIGENDUM-I
04-Dec-2019 17:01:00 27-Dec-2019 12:00:00 View
99 Engagement of one skilled person in drawing office of Civil Engineering Department...-03-December-2019   03-Dec-2019 14:46:00 26-Dec-2019 15:00:00 View
100 Rodent Control Treatment of all sheds at Dock-I (East &West) and Dock-II except shed No.11 (Passenger Terminal)...-02-December-2019   02-Dec-2019 13:33:00 24-Dec-2019 14:00:00 View
101 Inside & Outside thorough Repairing/renovation of CIVIL ENGINEERING DOCK OFFICE (New Building)..-29-November-2019   29-Nov-2019 10:20:00 19-Dec-2019 14:00:00 View
102 Water Proofing Treatment on Roof Surfaces at Subhas Bhaban Complex, N. S. Docks..-28-November-2019   28-Nov-2019 15:15:00 19-Dec-2019 14:00:00 View
103 Cleaning underground and above ground filter water reservoir at Centenary Hospital...-28-November-2019   28-Nov-2019 15:36:00 12-Dec-2019 15:00:00 View
104 Construction of Paver Block road from 10 no. NSD to Gate to 11 no. NSD Gate..-27-November-2019   27-Nov-2019 14:49:00 18-Dec-2019 14:00:00 View
105 Petty miscellaneous repair works including plumbing & sanitary works at Kolkata Port Trust Campus at Sagar Island..-26-November-2019   26-Nov-2019 11:26:00 17-Dec-2019 14:00:00 View
106 Annual Maintenance of Deck joints at Rabindra Setu carriage way for a period of one year..-25-November-2019   25-Nov-2019 12:18:00 17-Dec-2019 14:00:00 View
107 Refurbishment of PSO's meeting room and allied works..-21-November-2019   21-Nov-2019 14:26:00 06-Dec-2019 15:00:00 View
108 Removal / levelling of hipped up debris from different area along the internal road side of N.S Dock..-19-November-2019   19-Nov-2019 16:38:00 11-Dec-2019 14:00:00 View
109 Inside thorough renovation of Libyan Ware House for Ground floor,1st. floor and 2nd floor..-15-November-2019   15-Nov-2019 15:51:00 09-Dec-2019 14:00:00 View
110 Development of Alley roads at Kantapukur shed area from remount road to Jagannath temple..-14-November-2019
» CORRIGENDUM-I
14-Nov-2019 17:32:00 20-Dec-2019 15:00:00 View
111 Technical services covering planning, designing and supervision of construction with allied works for Refurbishment of Subhas Bhawan...11-November-2019   11-Nov-2019 14:53:00 10-Dec-2019 14:00:00 View
112 Revitalization of Clock Tower Jetty near no. 8 work shop,Kolkata Port Trust
» Corrigendum-I
» CORRIGENDUM-II
07-Nov-2019 12:25:00 20-Nov-2019 15:00:00 View
113 Thorough repairs and renovation to inside & outside including plumbing & sanitary works..-04-November-2019
» CORRIGENDUM-I
04-Nov-2019 12:26:00 03-Dec-2019 14:00:00 View
114 Thorough repair to the metal approach road from Kakdwip road to LRRS Station’s building..04-November-2019
» CORRIGENDUM-I
04-Nov-2019 16:04:00 27-Nov-2019 15:00:00 View
115 Erection of Notification Boards & R.C.C.Demarcation Pillars in KOPT’s Properties in Kolkata/Howrah/Outstation ..-30-October-2019   30-Oct-2019 11:39:00 20-Nov-2019 14:00:00 View
116 Construction of Brick Boundary Wall Fencing, Bamboo Post Fencing, around KoPT’s properties in Kolkata/Howrah/Outside..-30-October-2019   30-Oct-2019 15:12:00 27-Nov-2019 14:00:00 View
117 Repair/Restoration of Under structure of Rabindra Setu between (H.P.14 to 17) damaged due to collision by CIWTC Vessels M.T.SAPTAGRAM..-23-October-2019   23-Oct-2019 15:14:00 14-Nov-2019 14:00:00 View
118 Development of two wheeler parking area beside 4 & 3 NSD gate including drainage system..-22-October-2019
» CORRIGENDUM-I
22-Oct-2019 12:21:00 13-Nov-2019 14:00:00 View
119 Development of Reefer Parking Yard behind Libyan Ware House & at erstwhile Brace Bridge Officers’ quarter complex..-21-October-2019
» CORRIGENDUM-I
21-Oct-2019 15:02:00 15-Nov-2019 14:00:00 View
120 Repairs to the existing boundary wall including fixing of concertina in place of existing barbed wire..-18-October-2019   18-Oct-2019 15:33:00 19-Nov-2019 15:00:00 View
121 Construction of new Canteen Building near Gate No.-3 , N.S Dock. And Electrical Installation work..-11-October-2019   11-Oct-2019 17:22:00 05-Nov-2019 14:00:00 View
122 Levelling of depressed surfaces by laying of new paver blocks (M-50 grade) and relaying of old paver blocks..-10-October-2019   10-Oct-2019 10:27:00 31-Oct-2019 14:00:00 View
123 Waterproofing treatment work by APP modified prefabricated water proofing membrane and other ancillary /allied works..-10-October-2019
» CORRIGENDUM-I
10-Oct-2019 10:39:00 31-Oct-2019 15:00:00 View
124 Repairing/modification of 6 nos gates of K.P.Docks(Gate no.1,2,3,4,5&13 at Dock-I & II) for implementation of RFID project..-10-October-2019   10-Oct-2019 10:48:00 31-Oct-2019 14:00:00 View
125 Barbed wire fencing with Angle post at the approach road to KoPT's Truck Terminal..-10-Octotber-2019   10-Oct-2019 11:05:00 31-Oct-2019 15:00:00 View
126 Fixing of railing along the quay face of 3no berth, N. S. Dock..-10-October-2019   10-Oct-2019 11:28:00 31-Oct-2019 15:00:00 View
127 Repairing, raising the height of boundary wall & painting including replacement of barbed wire..-10-October-2019   10-Oct-2019 15:23:00 05-Nov-2019 14:00:00 View
128 Rebuilding of Spur Nos. 132 & 133 and Nourishment of Spur Nos.134 & 135 at Nischintapur area (Nischintapur Bank..-04-October-2019
» CORRIGENDUM-I
» CORRIGENDUM-II
04-Oct-2019 16:25:00 19-Nov-2019 15:00:00 View
129 Repairing/renovation of existing store room with roofing of Zinc alloy sheet at roof top..-03-October-2019   03-Oct-2019 16:34:00 24-Oct-2019 15:00:00 View
130 Supply of truck mounted mechanical road sweeping machine on hire for one time cleaning / sweeping...-30-September-2019   30-Sep-2019 10:00:00 04-Oct-2019 15:00:00 View
131 PART- A “Supplying drinking water at different places by Water Tanker under N.S.Dock Division ...-30-September-2019   30-Sep-2019 14:05:00 22-Oct-2019 14:00:00 View
132 Repairing of damaged dock boundary wall as and when required at K.P.Docks –I (East) and Dry Dock..-25-September-2019   25-Sep-2019 11:18:00 15-Oct-2019 15:00:00 View
133 Tender for supply of mechanical excavator cum back-hoe , dumper and or lorry and unskilled labourers..-25-September-2019   25-Sep-2019 12:35:00 22-Oct-2019 14:00:00 View
134 Thorough renovation of road inside no.8 Workshop and other allied works N.S.D..-24-September-2019   24-Sep-2019 12:57:00 03-Oct-2019 14:00:00 View
135 Thorough repairing of both inside and outside of the 72 nos. units at Chetla Quarters premises...-20-September-2019   20-Sep-2019 14:37:00 17-Oct-2019 15:00:00 View
136 Development of garden along with beautification of the adjacent area of clay tennis court at Kantapukur CISF Barrack..-20-September-2019
» CORRIGENDUM I
20-Sep-2019 14:43:00 11-Oct-2019 15:00:00 View
137 Cutting and trimming branches of trees etc. At Dock-I (East & West), Dock-II, Dry Dock,CMM Compound..-13-September-2019   17-Sep-2019 10:46:00 20-Sep-2019 15:00:00 View
138 Thorough repairs & reconstruction of the entire boundary wall of the Remount Road Quarters Complex..-13-September-2019   13-Sep-2019 15:14:00 11-Oct-2019 15:00:00 View
139 Removal of rubbish, stacked mix earth,cleaning of the dock premises and other miscellaneous works..-12-September-2019   12-Sep-2019 11:37:00 04-Oct-2019 15:00:00 View
140 Rail post grouting at different gates of K.P.Docks (RFID)..-12-September-2019   12-Sep-2019 15:49:00 04-Oct-2019 15:00:00 View
141 Supply of one no. lorry fitted with round shaped tanker/water tanks with pump for sprinkling of water..-11-September-2019   11-Sep-2019 15:03:00 03-Oct-2019 14:00:00 View
142 Reconstruction of dilapilated / damaged wooden structures in the groove of the lock entrance..-09-September-2019   09-Sep-2019 13:15:00 01-Oct-2019 14:00:00 View
143 Monitoring of different selected Environmental Parameters for Air, Noise, Water & Sediment..-09-September-2019
» CORRIGENDUM-I
09-Sep-2019 13:25:00 14-Oct-2019 14:00:00 View
144 Detail Survey of inside NSD and it's adjacent outside areas , N.S Dock..-09-September-2019
» CORRIGENDUM-I
09-Sep-2019 15:25:00 01-Oct-2019 14:00:00 View
145 Preparation of Waste Management Plan for Kolkata Dock System and Haldia Dock Complex of Kolkata Port Trust...- 03-September-2019
» CORRIGENDUM-I
03-Sep-2019 12:24:00 23-Sep-2019 14:00:00 View
146 Leveling and strengthening of main road with stone set topping starting from 2 NSD GRJ gate..-02-September-2019   02-Sep-2019 14:29:00 25-Sep-2019 14:00:00 View
147 Periodical cleaning & disinfecting underground & above ground filter water reservoir /tanks..-30-Aug-2019   30-Aug-2019 12:17:00 19-Sep-2019 15:00:00 View
148 Repair /maintenance work of paver block yards/roads/berth etc. within premises of N.S Dock..-28-Aug-2019   28-Aug-2019 12:38:00 19-Sep-2019 14:00:00 View
149 Thorough Refurbishment of KoPT Head Office (Main & Annexe) including interior beautification, civil...-27-Aug-2019
» CORRIGENDUM-I
» CORRIGENDUM-II
» CORRIGENDUM III
» CORRIGENDUM-IV
» CORRIGENDUM-V
» CORRIGENDUM-VI
» CORRIGENDUM-VII
» Corrigendum-VIII
» Corrigendum-IX
27-Aug-2019 14:56:00 10-Jan-2020 15:00:00 View
150 Thorough repair of both inside and outside to Bldg. Nos. B-1,B-2,B-3,B-4 &A-2 (80 Units)at Subhash Nagar Qrs..-26-Aug-2019   26-Aug-2019 15:39:00 27-Sep-2019 15:00:00 View
151 Installation of Rail Post at different gates of N.S. Dock to protect the RFID System...-23-Aug-2019   23-Aug-2019 13:13:00 13-Sep-2019 15:00:00 View
152 Plantation of Trees at Dhobitala plot for Urban Forestry and along the dock boundary wall ..-23-Aug-2019   23-Aug-2019 17:21:00 04-Sep-2019 14:00:00 View
153 Petty repairs to different roads under South Division as per requirement to maintain the roads...-21-Aug-2019   21-Aug-2019 13:35:00 12-Sep-2019 14:00:00 View
154 Waterproofing treatment work by APP modified prefabricated water proofing membrane...-20-Aug-2019   20-Aug-2019 17:28:00 10-Sep-2019 15:00:00 View
155 General Maintenance for Up keeping of camp premises,sheds/Building etc including Office room...-16-Aug-2019   16-Aug-2019 16:10:00 26-Aug-2019 15:00:00 View
156 General maintenance for Up keeping of Civil Engineering accommodation and providing services...-16-Aug-2019   16-Aug-2019 16:17:00 26-Aug-2019 15:00:00 View
157 Supply of daily labour for various sites of River Training wing...-16-Aug-2019   16-Aug-2019 16:22:00 26-Aug-2019 15:00:00 View
158 Part-‘A’ “Cleaning and removing accumulated muck etc. From Bridge deck & Part 'B' Maintenance & Upkeepment of R/Setu office...-13-Aug-2019   13-Aug-2019 11:25:00 03-Sep-2019 14:00:00 View
159 Miscellaneous building repair works as may be necessary at Subhas Nagar, CISF Qtrs., Ramnagar CISF Camp...-13-Aug-2019   13-Aug-2019 13:18:00 05-Sep-2019 14:00:00 View
160 Water proofing treatment to roofs of building nos and 10, 11, 12, 14, & 16 at Remount Road KoPT complex...-13-Aug-2019   13-Aug-2019 16:54:00 05-Sep-2019 14:00:00 View
161 Petty plumbing and sanitary works as may be necessary at Portland Park Quarters..-09-Aug-2019   09-Aug-2019 10:41:00 29-Aug-2019 15:00:00 View
162 Providing services for up-keepment of Truck Parking Terminals of Kolkata Port Trust..-09-Aug-2019   09-Aug-2019 12:14:00 30-Aug-2019 14:00:00 View
163 Pumping out of stagnated water from any location (both inside & outside Dock area) under N. S. Docks..-09-Aug-2019   09-Aug-2019 12:36:00 28-Aug-2019 15:00:00 View
164 Supply of unskilled labour at any location (both inside and outside dock area..-07-Aug-2019   07-Aug-2019 13:14:00 27-Aug-2019 15:00:00 View
165 Operation of pump motor set at A Shed reservoir including valve operation in connection with the supply of water to passenger vessel..-07-Aug-2019   07-Aug-2019 13:22:00 27-Aug-2019 15:00:00 View
166 Reconstruction (shifting) of boundary wall near 3NSD gate along Lybian Warehouse..-07-Aug-2019   07-Aug-2019 15:37:00 30-Aug-2019 15:00:00 View
167 Repair/Renovation of Outram Ghat Jetty No. 2 for creation of common user tourism facility..-05-Aug-2019
» CORRIGENDUM-I
» CORRIGENDUM II
» CORRIGENDUM-III
» CORRIGENDUM IV
05-Aug-2019 16:25:00 18-Oct-2019 15:00:00 View
168 Operation & maintenance of Water Treatment Plant at inside N.S. Dock near 4, NSD Gate..-26-July-2019   26-Jul-2019 11:38:00 20-Aug-2019 14:00:00 View
169 Miscellaneous works for security purposes at Majerhat TXR Mazdoor line..-26-July-2019   26-Jul-2019 12:39:00 31-Jul-2019 15:00:00 View
170 Cutting various sizes plants grown up on the external surfaces of buildings walls..-26-July-2019
» CORRIGENDUM
26-Jul-2019 12:48:00 14-Aug-2019 15:00:00 View
171 Supplying and fixing Fibre Reinforced Polyester Resin Cover for protection of bottom of Hanger Posts..26-July-2019   26-Jul-2019 16:25:00 20-Aug-2019 15:00:00 View
172 Providing services for general upkeepment (Attendant and Housekeepers),maintenance and housekeeping..-25-July-2019   25-Jul-2019 15:15:00 07-Aug-2019 14:00:00 View
173 Plantation of Trees at Dhobitala plot for Urban Forestry and along the dock boundary wall (inside) of N.S Dock..25-July-2019   25-Jul-2019 15:22:00 06-Aug-2019 14:00:00 View
174 Supply & Commissioning of automatic organic Waste Composting Machine including operation & maintenance...-24-July-2019
» CORRIGENDUM-I
24-Jul-2019 14:12:00 21-Aug-2019 14:00:00 View
175 Cleaning of chokage drain near Transworld CFS to Sonarpur road through the back side of AL-Cargo Terminal...-19-July-2019   19-Jul-2019 14:18:00 30-Jul-2019 15:00:00 View
176 Technical services covering, planning, designing including architectural design services and master planning services for the development...-18-July-2019   18-Jul-2019 10:53:00 02-Aug-2019 14:00:00 View
177 Petty Miscellaneous repairing works, petty plumbing and sanitary works including periodical jungle cutting...-17-July-2019   17-Jul-2019 13:31:00 08-Aug-2019 14:00:00 View
178 Fencing of one KoPT Land at Gravel Siding (earlier occupied by M/S DARCL Logistics Ltd) at G.C.D Area, Kolkata..-15-July-2019   16-Jul-2019 12:00:00 07-Aug-2019 15:00:00 View
179 Supplying and providing Anti Termite treatment at the Port Land Park...-16-July-2019   16-Jul-2019 14:08:00 08-Aug-2019 14:00:00 View
180 Fencing of one KoPT Land at Gravel Siding (earlier occupied by M/S DARCL Logistics Ltd)..-16-July-2019   16-Jul-2019 12:00:00 07-Aug-2019 15:00:00 View
181 Patch repairing to the carriage ways of different out roads and Inside road of Dymayne Avenue..-12-July-2019   12-Jul-2019 11:33:00 02-Aug-2019 14:00:00 View
182 Development of gardens at different areas of N.S. Docks and maintenances..-11-July-2019
» CORRIGENDUM-I
11-Jul-2019 11:29:00 01-Aug-2019 14:00:00 View
183 Procurement/Updation of Autodesk products at Civil Engineering Department..-10-July-2019
» Corrigendum-I
10-Jul-2019 12:53:00 17-Jul-2019 15:00:00 View
184 Misc. petty repairs at Nimak Mahal Quarters, PSO Office Complex at P-65 CGR Road..-10-July-2019   10-Jul-2019 13:04:00 01-Aug-2019 14:00:00 View
185 Construction of drain from Braithwaite Company to Sonai ...-10-July-2019
» CORRIGENDUM-I
10-Jul-2019 13:10:00 30-Jul-2019 15:00:00 View
186 Petty Misc repairs to shed buildings , goomties at Dock-II (East and West) area...-10-July-2019   10-Jul-2019 13:17:00 30-Jul-2019 15:00:00 View
187 Cleaning and disinfecting G.I, PVC, and Masonry water reservoir, steel tank at different size...-10-July2019   10-Jul-2019 16:40:00 01-Aug-2019 15:00:00 View
188 Renovation to the Diamond Harbour Inspection Bungalow of Kolkata Port Trust...-10-July-2019   10-Jul-2019 17:03:00 31-Jul-2019 14:00:00 View
189 Removal / levelling of hipped up debris from different area along the internal road side of N.S Dock...-09-July-2019   09-Jul-2019 14:31:00 30-Jul-2019 14:00:00 View
190 Cleaning of septic tanks, inspection pits etc and providing services of mechanical pumps..-9-July-2019   09-Jul-2019 16:29:00 19-Jul-2019 15:00:00 View
191 Through repairing of Gangra Tidal Station including sinking of 50 mm dia new tube well..-9-July-2019   09-Jul-2019 16:36:00 31-Jul-2019 15:00:00 View
192 Supply & Commissioning of automatic organic Waste Composting Machine ..-8-July-2019
» CORRIGENDUM-I
» Corrigenum-II
08-Jul-2019 12:20:00 Tender has been Terminated View
193 Remodelling of tilted boundary wall by ornamental grill with granite cladding..-8-July-2019
» CORRIGENDUM-I
» CORRIGENDUM-II
08-Jul-2019 15:50:00 30-Jul-2019 14:00:00 View
194 Construction of 4NSD main gate at Netaji Subhas Dock including developmentof outside area of 4 NSD..-5-July-2019   05-Jul-2019 15:56:00 07-Aug-2019 15:00:00 View
195 Construction of dedicated RCC cable trench at Alifnagar, 13 & 14, NSD coal storage area   04-Jul-2019 14:34:00 25-Jul-2019 14:00:00 View
196 Miscellaneous additional civil works and other works in connection with construction of a Rest Shed Office..-7-July-2019   03-Jul-2019 17:08:00 26-Jul-2019 15:00:00 View
197 Misc. petty repairs to sheds, buildings Goomties etc. at Dock-I (West) area including...-02-July-2019   02-Jul-2019 15:26:00 24-Jul-2019 15:00:00 View
198 Petty repair works to Sister Nivedita Abasan , Sheds , Buildings , other structures , CISF Barrack..-2-July-2019
» CORRIGENDUM-I
02-Jul-2019 16:39:00 24-Jul-2019 15:00:00 View
199 Miscellaneous building, repair works and other allied works including plumbing and sanitary...-01-July-2019   01-Jul-2019 12:07:00 22-Jul-2019 14:00:00 View
200 E-Tender for Petty Plumbing and Sanitary works at Dock-II (E & W), Sister Nivedita ..-01-July-2019
» CORRIGENDUM-I
01-Jul-2019 16:37:00 23-Jul-2019 15:00:00 View
201 Repairing, painting & raising the height of old partially damaged boundary...-01-July-2019
» CORRIGENDUM-I
01-Jul-2019 17:08:00 23-Jul-2019 15:00:00 View
202 Miscellaneous petty repairs at Subhash Bhavan complex in NSD..-28-June-2019   28-Jun-2019 12:09:00 19-Jul-2019 15:00:00 View
203 Petty Plumbing and Sanitary works inside N.S. Dock, CFS building, CHE building..-28-June-2019   28-Jun-2019 12:23:00 19-Jul-2019 15:00:00 View
204 Pumping out of stagnated water from any location (both inside & outside Dock area) under N. S. Docks..-28-June-2019   28-Jun-2019 13:03:00 12-Jul-2019 15:00:00 View
205 Technical services covering planning, designing and supervision of construction..-27-June-2019
» CORRIGENDUM-I
» CORRIGENDUM-II
» Corrigendum-III
» ADDENDUM-IV
» CORRIGENDUM-V
» CORRIGENDUM-VI
27-Jun-2019 11:53:00 13-Sep-2019 14:00:00 View
206 Repair/Restoration of Under structure of Rabindra Setu between (H.P.14 to 17) damaged due to collision ...-27-June-2019   27-Jun-2019 12:59:00 19-Jul-2019 15:00:00 View
207 15 Nos Safety Sign Board for unmanned level crossing..-27-June-2019   27-Jun-2019 17:18:00 16-Jul-2019 15:00:00 View
208 Sinking of 50 mm dia Tube well with installation of 1 HP Submersible pump..-27-June-2019   27-Jun-2019 17:26:00 19-Jul-2019 15:00:00 View
209 Supply of one number lorry fitted with round shaped water tanker/ water tanks with pump for sprinkling..-25-June-2019   25-Jun-2019 11:47:00 17-Jul-2019 15:00:00 View
210 Petty miscellaneous building repairing works as may be necessary at Portland Park Campus..-24-June-2019   24-Jun-2019 16:55:00 17-Jul-2019 15:00:00 View
211 Miscellaneous building repair works and petty sanitary and plumbing works..-21-June-2019   21-Jun-2019 13:10:00 12-Jul-2019 14:00:00 View
212 Miscellaneous building repair works as may be necessary at Subhas Nagar, CISF Qtrs., Ramnagar..-20-June-2019
» CORRIGENDUM-I
20-Jun-2019 16:39:00 12-Jul-2019 14:00:00 View
213 Construction of boundary wall along with necessary gates from the East of Majherhat Bridge..-20-June-2019   20-Jun-2019 17:02:00 17-Jul-2019 15:00:00 View
214 Petty plumbing and sanitary works at Dock-1(West),Island workshop area..-19-June-2019   19-Jun-2019 12:14:00 09-Jul-2019 15:00:00 View
215 Detailed Soil Investigation report for the upgradation of Berth No.7 NSD, N. S Dock..-18-June-2019   18-Jun-2019 12:15:00 09-Jul-2019 15:00:00 View
216 Water proofing treatment to roofs of building nos and 10, 11, 12, 14, & 16 at Remount Road..-18-June-2019   18-Jun-2019 17:06:00 10-Jul-2019 14:00:00 View
217 Upkeepment and maintenance of office of the Superintending Engineer (KPD) including...-17-June-2019
» CORRIGENDUM-I
17-Jun-2019 15:03:00 09-Jul-2019 15:00:00 View
218 Cleaning drains under South Division and other ancillary works as and when required...-17-June-2019   17-Jun-2019 17:03:00 09-Jul-2019 15:00:00 View
219 Petty miscellanous repairs to sheds,buildings, goomties etc. at Dock-I(East) area, K.P. Dry Dock, lock entrance...-14-June-2019   14-Jun-2019 11:12:00 03-Jul-2019 15:00:00 View
220 Providindg services for general up-keepment of the Chief Engineer's Office, Office of..-14-June-2019   14-Jun-2019 11:32:00 05-Jul-2019 14:00:00 View
221 Displaying various board/signal/direction and symbols at inside K. P .Dock..-14-June-2019
» CORRIGENDUM-I
14-Jun-2019 14:13:00 09-Jul-2019 15:30:00 View
222 Construction of boundary wall at EJC yard as per ISPS specification & repairs to the existing ..-14-June-2019   14-Jun-2019 16:19:00 09-Jul-2019 15:00:00 View
223 Maintenance, day to day operation, and other ancillary works at Water Treatment Plant..-13-June-2019
» CORRIGENDUM-I
13-Jun-2019 12:19:00 05-Jul-2019 15:00:00 View
224 Miscellaneous Repairing works necessary for all working Jetties ..-12-June-2019   12-Jun-2019 15:36:00 04-Jul-2019 14:00:00 View
225 Flooring, wall panelling , painting (inside) and water proofing at CISF shed..-12-June-2019   12-Jun-2019 16:47:00 05-Jul-2019 15:00:00 View
226 Temporary Bamboo Walkway (XVIII) at Basin Complex of Shore Based Pilot Station, at Sagar Island..-11-June-2019   11-Jun-2019 11:38:00 02-Jul-2019 15:00:00 View
227 Operation and maintenance of Water Treatment plant...-11-June-2019
» CORRIGENDUM-I
11-Jun-2019 14:46:00 03-Jul-2019 14:00:00 View
228 InsideThorough renovation of quarter no.D/I and D/II of Nimak Mahal Officers Accomodation..-10-June-2019   10-Jun-2019 17:28:00 02-Jul-2019 15:00:00 View
229 Waterproofing treatment on the roof of Class-III & Class-IV staff quarters..07-June-2019   07-Jun-2019 13:28:00 28-Jun-2019 15:00:00 View
230 Restoration of damaged underground drainage system near CFS building..-07-June-2019   07-Jun-2019 14:41:00 28-Jun-2019 15:00:00 View
231 Consultancy service for strengthening of existing Project Monitoring Unit(PMU) of Kolkata Port Trust for procurement...-03-June-2019
» CORRIGENDUM-I
» Corrigendum-II
03-Jun-2019 10:40:00 06-Aug-2019 15:00:00 View
232 Upgrading of the two main entrance gates of Port Land Park..-31-May-2019
» CORRIGENDUM-I
31-May-2019 15:05:00 24-Jun-2019 15:00:00 View
233 Petty Plumbing and Sanitary works at No 8 Work shop and Nimak Mahal Officer Quarter..-31-May-2019   31-May-2019 15:44:00 19-Jun-2019 15:00:00 View
234 Provide service of labour at different area for emergency misc. work..-31-May-2019   31-May-2019 15:53:00 20-Jun-2019 15:00:00 View
235 Operation of fresh water Centrifugal pump at Nimak Mahal Officers Quarters Campus and Subhas Bhavan..-31-May-2019   31-May-2019 16:02:00 21-Jun-2019 15:00:00 View
236 Construction of RCC drawf wall at 13 & 14, NSD berth to prevent the spillage of coal..-30-May-2019   30-May-2019 11:48:00 20-Jun-2019 15:00:00 View
237 Cutting and trimming branches of trees etc. at inside N. S. Dock,Hydraulic Model Centre..-30-May-2019   30-May-2019 14:38:00 14-Jun-2019 15:00:00 View
238 Pumping out of stagnated water from any location (both inside & outside Dock area) under N.S.Docks..-30-May-2019   30-May-2019 14:55:00 14-Jun-2019 15:00:00 View
239 Relaying of damaged underground water supply pipe line from 2,NSD GRJ gate..-29-May-2019   29-May-2019 12:41:00 19-Jun-2019 15:00:00 View
240 Thorough repairs and renovation including plumbing & sanitary works..-29-May-2019
» CORRIGENDUM-I
» CORRIGENDUM-II
29-May-2019 12:57:00 20-Jun-2019 15:00:00 View
241 Thorough repair & renovation to both inside and outside of Toilet block..-29-May-2019
» CORRIGENDUM-I
29-May-2019 13:08:00 13-Jun-2019 15:00:00 View
242 Design, Engineering, Supply and Installation of water sprinkling system..-29-May-2019
» CORRIGENDUM-I
29-May-2019 15:55:00 04-Jul-2019 15:00:00 View
243 Through repairing of Gangra Tidal Station including sinking of 50 mm dia new tube well..24-May-2019   24-May-2019 11:32:00 17-Jun-2019 15:00:00 View
244 Construction of boundary wall of erstwhile Baghbazar Ware House at Baghbazar..-24-May-2019   24-May-2019 15:59:00 04-Jun-2019 15:00:00 View
245 Repairing of broken boundary wall, roof treatment including construction..-23-May-2019
» CORRIGENDA
23-May-2019 16:11:00 13-Jun-2019 15:00:00 View
246 Maintenance day to day operation, providing services of night time watch..-22-May-2019   22-May-2019 12:00:00 13-Jun-2019 15:00:00 View
247 Civil works including Plumbing and sanitary works and other ancilliary works..-22-May-2019
» CORRIGENDUM-I
» CORRIGENDUM-II
22-May-2019 14:54:00 29-May-2019 15:00:00 View
248 Petty miscellaneous repairs to sheds,buildings, goomties etc at Dock-I..-22-May-2019   22-May-2019 16:20:00 13-Jun-2019 15:00:00 View
249 Renewing of Sewer lines & construction of Septic tanks..-20-May-2019   20-May-2019 12:25:00 11-Jun-2019 15:00:00 View
250 Construction of chain link fencing around Kantapukur CISF Barrack..-17-May-2019   17-May-2019 13:20:00 11-Jun-2019 15:00:00 View
251 Construction of Toilet block for the convenience of the Mosque users ..-15-May-2019   15-May-2019 14:48:00 23-May-2019 15:00:00 View
252 Daily operation of Sluice Valve for supply of water from main overhead tank..-13-May-2019
» CORRIGENDUM
13-May-2019 11:40:00 30-May-2019 15:00:00 View
253 Maintenance of Garden at Dock Training Institute at 51 CGR road ..-10-May-2019
» CORRIGENDUM-I
10-May-2019 17:30:00 06-Jun-2019 15:00:00 View
254 Anti-termite treatment and Rodent Control works at KOPT Head Office building at 15, Strand Road ...-09-May-2019   09-May-2019 11:12:00 31-May-2019 15:00:00 View
255 Upkeepment and maintenance of the Engineering Accounts Wing at 1st Floor 6, Fairlie place, kolkata...-06-May-2019   06-May-2019 10:41:00 27-May-2019 15:00:00 View
256 Providing assistance for upkeepment of office premises of Superintending Engineer (N.S.D) at 51,C.G.R road, site office of Superintending Engineer (N.S.D) at no 8 work shop and site office near gate no.3 N.S.Dock...03-May-2019   03-May-2019 12:45:00 29-May-2019 15:00:00 View
257 Petty plumbing and sanitary works at Dock-1(East), Dry Dock area and C.M.M. Compound to Mooring Masters' Office, Tuktaghat, Fair Field area, Island workshop and Sr.Shipwright office...03-May-2019   03-May-2019 14:30:00 25-May-2019 15:00:00 View
258 Jungle cutting including Uprooting and Removing of Vegetation, Grass, Bushes...03-May-2019   03-May-2019 16:10:00 28-May-2019 15:00:00 View
259 Erection of barbed wire fencing along the river bank including repairing of boundary wall, security goomties and other miscellaneous works...30-April-2019   30-Apr-2019 12:10:00 22-May-2019 15:00:00 View
260 Pumping out of stagnated water from any location (both inside and outside Dock area) under K.P.Docks...30-April-2019   30-Apr-2019 14:05:00 22-May-2019 15:00:00 View
261 Jungle cutting including uprooting and removing vegetation,grass,bushes,etc.at Dock-I (East),Dock-II(East),Dry Dock,CMM Compound including Tuckta Ghat and Fairfield, Kantapukur CISF Barrack and Sister Nivedita Abasan,K.P.Docks...30-April-2019   30-Apr-2019 14:10:00 22-May-2019 15:00:00 View
262 Misc. petty repairs to sheds, different Goomty /Office Bldgs. Electrical Substations/ Transformer Rooms/Pump House/Workshops/Other Small Structures/ Boundary Wall/ Drain etc. at inside of entire N.S. Docks Area...29-April-2019   29-Apr-2019 17:05:00 21-May-2019 15:00:00 View
263 Repairing & improvement of existing drainage system from Subhas Bhaban to KMC main drain at the South side of C.G.R Road (N.S Dock) - 26-April-2019
» Corrigendum-I
26-Apr-2019 12:40:00 22-May-2019 15:00:00 View
264 Providing services for general upkeepment (Attendant and House Keepers ),maintenance and housekeeping etc. at the office of...-25-April-2019   25-Apr-2019 13:43:00 03-May-2019 15:00:00 View
265 Providing barbed wire fencing along the river front 3, 4 GRJ area including patrolling track..-25-April-2019   25-Apr-2019 15:31:00 21-May-2019 15:00:00 View
266 Thorough Renovation and Painting Work of DRM Office building,South Cabin Building, Driver & Technical Office Building..-24-April-2019   24-Apr-2019 12:50:00 14-May-2019 15:00:00 View
267 Thorough repair & renovation to both inside and outside of Toilet block near Canteen Building..-24-April-2019   24-Apr-2019 16:08:00 09-May-2019 15:00:00 View
268 Tender for repairs, replacement , maintenance of Bascule Bridge( Nazrul Setu) deck joint plates, structural members of bridge....-23-April-2019   23-Apr-2019 14:40:00 16-May-2019 15:00:00 View
269 E-TENDER for “Development of two wheeler parking area beside 4 & 3 NSD....-22-April-2019   22-Apr-2019 13:40:00 17-May-2019 15:00:00 View
270 Repairing and replacement of worn out damaged wooden decking planks...-22-April-2019   22-Apr-2019 13:50:00 17-May-2019 15:00:00 View
271 Repairs and Rehabilitation of Fairlie Warehouse (CRDC) KoPT at 6, Fairlie Place, Kolkata - 18-April-2019   18-Apr-2019 11:15:00 10-May-2019 15:00:00 View
272 Construction of 4NSD main gate at Netaji Subhas Dock including development of outside area of 4 NSD gate & rail gate,electrical works & other allied works...18-April-2019   18-Apr-2019 13:45:00 24-May-2019 15:00:00 View
273 Displaying various board/signal/direction and symbols at inside N.S Dock and other allied works at N.S Dock - 18-April-2019
» Corrigendum-I
18-Apr-2019 16:50:00 08-May-2019 15:00:00 View
274 Cleaning and disinfecting different types & size of drinking water tanks inside & outside dock under NSD section for one year from the date of work order - 17-April-2019   17-Apr-2019 12:30:00 30-Apr-2019 15:00:00 View
275 Thorough rehabilitation of bituminous carriageways of P N Banerjee Road & thorough repairing of Graham Road and other allied roads at Petroleum Wharves Budgebudge...17-April-2019   17-Apr-2019 14:42:00 08-May-2019 15:00:00 View
276 Periodical jungle cutting and removing of jungles at different areas of N.S. Dock for a period of one year...16-April-2019   16-Apr-2019 15:50:00 30-Apr-2019 15:00:00 View
277 Repairing/ modification of boundary wall of Hydraulic Model Centre and other allied works - 16-April-2019
» Corrigendum-I
16-Apr-2019 16:55:00 17-May-2019 15:00:00 View
278 Restoration of dislocated gravity fenders along with thorough repair of KoPT RCC Jetty at Raichak - 16-April-2019   16-Apr-2019 17:05:00 09-May-2019 15:00:00 View
279 Construction of Paver Block road from 10 no. NSD to Gate to 11 no. NSD Gate including improvement of drainage system, N.S. Dock - 12-April-2019   12-Apr-2019 11:30:00 03-May-2019 15:00:00 View
280 Cleaning of existing drain including repairs the minor damaged portion along the sick line road, Dhobitola road, C.G.R. road , G R Road...12-April-2019   12-Apr-2019 11:40:00 03-May-2019 15:00:00 View
281 Levelling and dressing of the area of NTWC with moorum topping, providing concertina over boundary wall, construction of a septic tank and other allied works...11-April-2019   11-Apr-2019 14:45:00 18-Apr-2019 15:00:00 View
282 Periodical jungle cutting and removing of jungles at different areas of N.S. Dock...28-Mar-2019
» Tender Cancellation Corrigendum Notice
28-Mar-2019 12:02:00 Tender has been Terminated View
283 Preparation of Waste Management Plan for Kolkata Dock System and Haldia Dock Complex of Kolkata Port Trust - 27-Mar-2019   27-Mar-2019 13:20:00 22-Apr-2019 15:30:00 View
284 Fulfilling requirement of seeds (flowers and vegetables ) manures and fertilizers, insecticides and pesticides, and maintenance of gardenining works...25-Mar-2019   25-Mar-2019 11:50:00 03-Apr-2019 15:00:00 View
285 Supplying of daily labourers for miscellaneous non-measurable works and pumping services...25-Mar-2019   25-Mar-2019 12:20:00 17-Apr-2019 15:00:00 View
286 Cleaning & Disinfection of Underground Vats. Overhead Fresh Water Tanks at Head Office Building...18-Mar-2019   18-Mar-2019 15:40:00 09-Apr-2019 15:00:00 View
287 Providing water proofing treatment for roofs of building nos. 4 & 12, 9, 17B, 15A, 11A & 19A at Port Land Park Campus including...07-Mar-2019   07-Mar-2019 10:30:00 27-Mar-2019 15:00:00 View
288 Design, Engineering, Supply and Installation of water sprinkling system including supervision, operation and maintenance period of one year for dust suppression of coal stock piles at Coal berth area of K.P.Docks...06-Mar-2019
» Corrigendum-I
06-Mar-2019 14:10:00 11-Apr-2019 15:00:00 View
289 Fencing Surrounding the Effluent Treatment Plant at Centenary Hospital...06-Mar-2019   06-Mar-2019 16:10:00 26-Mar-2019 15:00:00 View
290 Design, fabricate, supply , test and deliver of one no. Main Pontoon of size 30.0M x 9.25M x 1.60M (average depth) fitted with all fittings, fixtures and fenders all complete at approved location at Kolkata Dock System or at Bdge Budge Moorings and one no. for Diamond Harbour Jetty - 27-Feb-2019
» Corrigendum-I
» Corrigendum-II
» Corrigendum-III
» Corrigendum-IV
» Corrigendum-V
27-Feb-2019 16:20:00 29-Apr-2019 15:00:00 View
291 Providing water proofing treatment for roofs of building...25-Feb-2019
» Corrigendum-I
25-Feb-2019 10:25:00 13-Mar-2019 15:00:00 View
292 Petty Miscellaneous repairing works and other ancillary works including Jungle cutting at Sector - 1 to 5 and New Taratala colony as and when required at Taratala qtrs complex...21-Feb-2019   21-Feb-2019 11:50:00 15-Mar-2019 15:00:00 View
293 Petty Plumbing & Sanitary works of Subhas Bhaban, P65, PSO Complex, Loco Shed, CGR area, Hydraulic Model Centre under N.S. Dock for one year from the date of work order - 20-Feb-2019   20-Feb-2019 11:25:00 14-Mar-2019 15:00:00 View
294 Through renovation (outside & inside) of Hi-fix building and main building of H.S.D. including renovation of adjoining structure and boundary wall and including plumbing works at N.S.Dock - 20-Feb-2019   20-Feb-2019 13:10:00 13-Mar-2019 15:00:00 View
295 Providing services for upkeepment of office premises of Superintending Engineer (Civil)...18-Feb-2019   18-Feb-2019 12:15:00 12-Mar-2019 15:00:00 View
296 Repair & painting for RCC Overhead water reservoirs at CMM Compound, K.P Docks under action plan for Swachh Bharat...18-Feb-2019   18-Feb-2019 17:28:00 08-Mar-2019 15:00:00 View
297 Mowing Lawns, Jungle Cutting and Trimming Branches of Trees...13-Feb-2019   15-Feb-2019 12:00:00 01-Mar-2019 15:00:00 View
298 Petty miscellaneous Civil works to Head Office main building, Annexe Building, New Per-audit building, Dispensary, Co-operative Credit Society. Tiffin Club...15-Feb-2019   15-Feb-2019 15:00:00 12-Mar-2019 15:00:00 View
299 Petty Miscellaneous repairing works at Centenary Hospital, Hospital Park Quarters, CISF Guest House, DRM office...14-Feb-2019
» Corrigendum-I
14-Feb-2019 12:10:00 07-Mar-2019 15:00:00 View
300 Construction of proposed Toilet Blocks at Ground Floor and 1st Floor of NPPS - 14-Feb-2019
» Corrigendum
14-Feb-2019 17:15:00 11-Mar-2019 15:00:00 View
301 Regradation of depressed level (low cost) at back side of shed no - 4,6,8 & 10 at Dock-I (W) KPD using old bricks available from N.S.Docks and other ancillary works - 13-Feb-2019   13-Feb-2019 11:12:00 07-Mar-2019 15:00:00 View
302 Petty works at Rabindra Setu deck, approach footpath including flyover & Rabindra Setu Office, Rabindra Setu Traffic Guard Office, etc. as and when necessary for a period of ONE year from the date of placement of work order - 13-Feb-2019   13-Feb-2019 12:40:00 05-Mar-2019 15:00:00 View
303 Modification of existing PF Office in connection with proposed Accounts Office at 1st Floor of Fairlie Warehouse Bay No.08 - 13-Feb-2019   13-Feb-2019 13:00:00 07-Mar-2019 15:00:00 View
304 Providing services for upkeepment of office premises of Superintending Engineer (Env) at gate No 3 , KP Docks for 02(two) years...12-Feb-2019   12-Feb-2019 14:50:00 05-Mar-2019 15:00:00 View
305 Construction of 4NSD main gate at Netaji Subhas Dock including development of outside area of 4 NSD gate & rail gate,electrical works & other allied works...08-Feb-2019   08-Feb-2019 11:00:00 28-Feb-2019 15:00:00 View
306 New Construction of Three (3) number of CISF Room And repairing CISF watch tower at EJC yard - 01-Feb-2019   01-Feb-2019 12:52:00 26-Feb-2019 15:00:00 View
307 Roof Treatment by APP Membrane at Flat Roofs of Shed No. 22, 23 & 24 at KPD Dock - II - 01-Feb-2019
» Corrigendum-I
01-Feb-2019 13:50:00 08-Feb-2019 15:00:00 View
308 Construction of a new two storied Building for Crew's shelter near Lock Entrance including other allied works, N.S. Docks...01-Feb-2019
» Corrigendum-I
01-Feb-2019 15:40:00 08-Mar-2019 15:00:00 View
309 Spreading, Levelling & Rolling of rubbish stacked in between main road...30-Jan-2019
» Corrigendum-I
30-Jan-2019 15:00:00 20-Feb-2019 15:00:00 View
310 Repair /maintenance work of paver block yards/roads/berth...29-Jan-2019   29-Jan-2019 13:15:00 26-Feb-2019 15:00:00 View
311 Petty Plumbing and sanitary works to KOPT Guest at 93, Chowringhee Road...28-Jan-2019
» Corrigendum
28-Jan-2019 10:56:00 19-Feb-2019 15:00:00 View
312 Providing services for general upkeepment (Attendant and House Keepers ), maintenance and housekeeping...24-Jan-2019   24-Jan-2019 13:20:00 01-Feb-2019 15:00:00 View
313 Preparation of Waste Management Plan for Kolkata Dock System and Haldia Dock Complex...24-Jan-2019
» Corrigendum-I
24-Jan-2019 16:00:00 20-Feb-2019 15:30:00 View
314 Miscellaneous repairs/maintenance of damaged portion of Brace Bridge...22-Jan-2019   22-Jan-2019 15:08:00 19-Feb-2019 15:00:00 View
315 Petty plumbing and sanitary works within KoPT Head Office premises at 15, Strand Road...22-Jan-2019   22-Jan-2019 17:15:00 15-Feb-2019 15:00:00 View
316 False ceiling and renovation of M.S Room, replacement of existing defective Rimless Glass...11-Jan-2019   11-Jan-2019 13:05:00 07-Feb-2019 15:00:00 View
317 Repairing and replacement of worn out damaged wooden decking planks and steel works including painting of all the structural members of Man Of War Jetty - 09-Jan-2019   09-Jan-2019 15:55:00 07-Feb-2019 15:00:00 View
318 Water proofing treatment on roofs including sealing of expansion joints at different floor levels of Centenary Hospital and other buildings...04-Jan-2019
» Corrigendum - I
04-Jan-2019 15:20:00 29-Jan-2019 15:00:00 View
319 Construction of proposed Toilet Blocks at Ground Floor and 1st Floor of NPPS - 04-Jan-2019
» Corrigendum
04-Jan-2019 16:02:00 29-Jan-2019 15:00:00 View
320 Roof treatment with APP membrane at URS Station, Budgebudge - 04-Jan-2019   04-Jan-2019 16:34:00 28-Jan-2019 15:00:00 View
321 Works related to Swatch Bharat Abhijan at KoPT Centenary Hospital premises - 02-Jan-2018   02-Jan-2019 16:20:00 29-Jan-2019 15:00:00 View
322 Maintenance of Slab Seal Type Deck Joints of Brabourne Road Flyover including replacement of damaged units...26-Dec-2018   26-Dec-2018 17:18:00 17-Jan-2019 15:00:00 View
323 Construction of a new two storied Building for Crew's shelter near Lock Entrance including other allied works, N.S. Docks - 26-Dec-2018
» Corrigendum
26-Dec-2018 17:25:00 15-Jan-2019 15:00:00 View
324 Part - A Petty plumbing works as may be necessary at Taratala Colony under use for a period of one year and Part-B Annual removal of chokage of sanitary fittings at Taratala KoPT colony under use for a period of one year - 18-Dec-2018   18-Dec-2018 12:25:00 07-Jan-2019 15:30:00 View
325 Waterproofing treatment work by APP modified prefabricated water proofing membrane to the roof of Dock master office..17-Dec-2018   17-Dec-2018 11:45:00 08-Jan-2019 15:00:00 View
326 Repair and renovation to the outside and inside of shed no. 24 including surrounding drains and depressed surface area at K.P. Dock-II - 14-Dec-2018   14-Dec-2018 12:10:00 03-Jan-2019 15:00:00 View
327 Part A False ceiling and renovation of M.S Room, replacement of existing defective Rimless Glass Door...14-Dec-2018   14-Dec-2018 16:00:00 08-Jan-2019 15:00:00 View
328 Repairs and Rehabilitation of Fairlie Warehouse (CRDC) KoPT at 6, Fairlie Place, Kolkata...10-Dec-2018   10-Dec-2018 13:45:00 03-Jan-2019 15:00:00 View
329 Repair & painting for RCC Overhead water reservisor at CMM Compound, K.P Docks under action plan for Swachh Bharat - 10-Dec-2018   10-Dec-2018 10:10:00 27-Dec-2018 15:00:00 View
330 Development of green verge including plantation of trees along boundary wall of ETC agro just opposite to shed 29, 28 at Dock-II - 07-Dec-2018   07-Dec-2018 12:55:00 27-Dec-2018 15:00:00 View
331 Provision of false ceiling and other miscellaneous works at required area of barrack shed inside CISF parade ground at Kantapukur...06-Dec-2018
» Corrigendum - 1
06-Dec-2018 11:01:00 27-Dec-2018 15:00:00 View
332 Water proofing treatment to the roof of KOPT Head Office old building, canteen and adjoining small roof...04-Dec-2018   04-Dec-2018 12:15:00 31-Dec-2018 15:00:00 View
333 Sinking of Tube Well (50 mm x 100 mm dia) at DRM office (EJC Yard) and some other ancillary works - 04-Dec-2018   04-Dec-2018 13:45:00 24-Dec-2018 15:00:00 View
334 Proposed boundary wall at play ground, including dismantling of existing wall at Taratala Colony - 30-Nov-2018   30-Nov-2018 14:36:00 28-Dec-2018 15:00:00 View
335 Periodical Slot marking and Crane track marking work for proper Yard Management for one year from the date of placement of Work Order, N. S. Dock - 30-Nov-2018   30-Nov-2018 16:00:00 28-Dec-2018 15:00:00 View
336 Thorough inside repairs and renovation works including sanitary & plumbing works for official residence...29-Nov-2018
» Corrigendum
29-Nov-2018 15:30:00 10-Dec-2018 15:30:00 View
337 Petty Miscellaneous Works along with Petty Plumbing and Sanitary Works to NHBQ Class-III & IV Staff Quarters...27-Nov-2018
» Corrigenda-II
27-Nov-2018 14:50:00 27-Dec-2018 15:00:00 View
338 Repairing and replacement of worn out damaged wooden decking planks and steel works including painting...22-Nov-2018   22-Nov-2018 11:58:00 18-Dec-2018 15:00:00 View
339 Periodical maintenance work of different road including inside Dock...20-Nov-2018
» Corrigendum-I
20-Nov-2018 13:07:00 18-Dec-2018 15:00:00 View
340 Providing services for general upkeepment (Attendant and House Keepers ), maintenance and housekeeping etc. at the office of the Ground Floor of the Chairman's Bungalow...20-Nov-2018   20-Nov-2018 16:34:00 19-Dec-2018 15:00:00 View
341 Thorough renovation of Chairman and Dy. Chairman’s Enclosures at 3rd Floor of Subhas Bhaban...16-Nov-18   16-Nov-2018 10:40:00 06-Dec-2018 15:00:00 View
342 Maintenance of existing landscape and garden of KoPT Centenary Hospital at Majerhat..13-Nov-18   13-Nov-2018 15:10:00 12-Dec-2018 15:00:00 View
343 Providing upkeepment and maintenance of the office under Superintending Engineer(Rly)...13-Nov-18   13-Nov-2018 15:15:00 12-Dec-2018 15:00:00 View
344 Development of container stacking yard at 3 NSD Shed area and adjacent green verge area...08-Nov-2018   08-Nov-2018 10:55:00 29-Nov-2018 15:00:00 View
345 Providing services of unskilled labour to assist the Chief Engineer's Office at KOPT Head Office...07-Nov-2018   07-Nov-2018 13:04:00 29-Nov-2018 15:00:00 View
346 Construction of raised pathway between 3 NSD gate and Masjid...02-Nov-2018   02-Nov-2018 15:00:00 28-Nov-2018 15:00:00 View
347 Renovation of East Yard Mess near gate no 5, KPD...02-Nov-2018   02-Nov-2018 14:50:00 27-Nov-2018 15:00:00 View
348 Petty plumbing works as may be necessary at Taratala Colony...01-Nov-2018
» Corrigendum
01-Nov-2018 15:50:00 01-Dec-2018 15:30:00 View
349 Miscellaneous conservancy upkeepment works at Portland Park Quarters' premises...23-Oct-2018
» Corrigendum-I
23-Oct-2018 16:45:00 02-Nov-2018 15:00:00 View
350 Development of area between 1 CPY & Reefer Park area & adjoining green verge area for Container Parking Yard including...11-Oct-2018
» Corrigendum-I
11-Oct-2018 14:00:00 30-Oct-2018 15:00:00 View
351 Temporary patch repairing and cleaning to the ground floor...10-Oct-2018   10-Oct-2018 16:35:00 30-Oct-2018 15:00:00 View
352 Cleaning and disinfecting different types & size of drinking water tanks inside & outside dock under NSD section...05-Oct-2018   05-Oct-2018 16:39:00 26-Oct-2018 15:00:00 View
353 Petty Miscellaneous works to KoPT Offices at Kolkata Jetty (including Workshop), Fairlie Warehouse, Hillary Institute, Toll collection Office...04-Oct-2018
» Corrigendum